May 11, 1987 i
l DISTRIBUTION:
MEMORANDUM FOR: GUS C. LAINAS, Assistant Director 46x REGION II REACTORS NRC & Local PDR DIVISION OF REACTOR PROJECTS I/II PD21 r/f EAdensam FROM:
ELINOR ADENSAM, DIRECTOR JHayes PROJECT DIRECTORATE 11-1 DIVISION OF REACTOR PROJECTS 1/II
SUBJECT:
PREVIOUS ORGANIZATION ITEMS TO BE CLOSED OUT BY JACK HAYES On April 20, 1987 a meeting was held with John Craig, Acting Branch Chief, Plant Systems and members of his staff to discuss the closing out of items that Jack Hayes had responsibility for when he was a reviewer in the Plant Systems Branch, PWRL-A. The items which were discussed are presented as. Based upon this meeting the following was agreed to:
ITEM TASK I.
Control Room Habitability A. Will Complete By May 31.
A. Trip Reports B.
B. NUREG Documents
- 1. Will Review and Provide Input to PSB.
- 1. NUREG/CR
- 2. Transferred to PSB
- 2. NUREG-NRR C. Licensee Documents C. Input Already Provided.
No Further Action Required.
D. Regional Meetings D. Input To Be Provided If Meetings Occur Within The Next 2 Months. PSB/RES hill Decide The Need.
E. CRGR Package E. Transfe wf To RES.
II. Licensing Actions A. Beaver Valley L' nit 1 A. Review Control Room Ventilation System And 8705190053 870511 Associated Technical PDR ORG NRRB PDR Specifications. Comments To PSB By May 5.
,}
B. Byron B.
Ij)/
- 1. Compliance With
- 1. SSER To Be Provided ANSI N-510 To PM.
O g[ /
- 2. Deviations from
c
. III. Support To Regions
.A. Region I A. Transferred To PSB.
B. Region II B. Transferred To PSB.
C. Regicn III C. Transferred To PSB.
D. Region V D. Will Provide Support To PSB On Site Visit The staff effort for these activities is estimated to be 6 staff weeks over 8 calendar weeks, accounting for 75% of Jack's time.
If you are in agreement with these assignments, we will document the above in a memorandum to the Plant Systems Branch.
In addition to the above issues discussed with PSB, Jack is scheduled to lecture on the subject of control room habitability at the Harvard School of Public Health on both May 1, 1987 and May 14, 1987.
We were informed by PSB on April 23, 1987, that the planned assistance to Region V would not involve the utilization of Argonne National Laboratory. Therefore, Jack may not need to provide any support to the Region.
/S/
Elinor G. Adensam. Director Project Directorate 11-1 Division of Reactor Projects - I/II
Enclosure:
As stated cc:
J. Craig D:PD D R 2 hR p EAdensam Ja a
05 ///87 05/// /87
e ENCLOSURE 1 PLANT SYSTEMS BRANCH'(PWRL-A)
ITEMS REMAINING TO BE CLOSED OUT BY JACK HAYES I.-CONTROL ROOM HABITABILITY A. TRIP REPORTS
- 1. AN0
- 2. WNP-2
- 3. V.C. SUMMER B. NUREG DOCUMENTS
- 1. CONTRACTOR REPORT ON 11 PLANT SURVEY
- 2. NRR REPORT ON ACTION TO FOLLOW 11 PLANT SURVEY C. LICENSEE DOCUMENTS
- 1. ENFORCEMENT MEMORANDUM
- 2. COMPLIANCE BULLETIN D. REGIONAL MEETINGS
- 1. REGIONAL STAFF
- 2. LICENSEES E. CRGR PACKAGE j
- 1. GENERIC LETTER
- 2. VALUE/ IMPACT II. LICENSING ACTIONS
,l A. BEAVER VALLEY UNIT 1
- 1. MODIFICATIONS TO UNIT 1 CONTROL ROOM VENTILATION SYSTEM
- 2. MODIFICATIONS TO UNIT 1 TECHNICAL SPECIFICATIONS.
- 3. CONTROL ROOM DOSE EVALUATION potential impact on unit 2 license and technical specifications i
4 B. BYRON
- 1. COMPLIANCE'WITH ANSI N-510 TESTING OF CONTROL' RECIRCULATION CHARC0AL ADSORBER
- 2. DEVIATIONS FROM REGULATORY GUIDES'1.52-AND 1.140 C. SAN'ONOFRE UNIT 1
- 1. RESOLUTION OF TMI ACTION ITEM-III.D.3.4 D. SEABROOK'
- 1. RESOLUTION OF SINGLE FAILURE CRITERIA FOR CONTROL ROOM HABITABILITY SYSTEMS PRIOR TO EXCEEDING 5%
POWER
- 2. EVALUATION OF AS-BUILT CONTROL ROOM VENTILATION SYSTEM BY ARGONNE NATIONAL LABORATORY III. SUPPORT TO REGIONS A. REGION I SEABROOK CONTROL ROOM EVALUATION; ANL EVALUATION B. REGION II OBSERVATION OF A REFUELING OUTAGE TEST OF THE BOTTLED AIR SYSTEM TO DETERMINE COMPLIANCE WITH DESIGN BASIS FOR THE NORTH ANNA CONTROL ROOM C. REGION III ZION TIA ON CONTROL ROOM VENTILATION INCIDENT'AND COMPLIANCE WITH GDC 19 D. REGION V RESTART OF RANCH 0 SEC0; EVALUATION OF' CONTROL ROOM VENTILATION SYSTEM.
...