ML20213G399
| ML20213G399 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/12/1987 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8705180269 | |
| Download: ML20213G399 (1) | |
Text
_ _ _ _ - _ _ _ _ _ _ _ _
Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 m
R. P. Mcdonald Alabama Power Senior Vice President the southem electre system 10CFR50.59 May 12, 1987 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 1 Annual 10CFR50.59 Report Correction In our annual report required by 10CFR50.59 for 1986, which was submitted by letter dated March 31, 1987, PCR/PCN 86-3675 was inadvertently listed as having been completed for Unit 1.
However, this design change was not implemented in 1986 and therefore should not have been included in the report for 1986.
If there are any questions, please advise.
Respectfully
- itted,
(<j R. P. Mcdonald I
Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford l
8705180269 870512 L
PDR ADOCK 05000348 R
_