ML20213G072
| ML20213G072 | |
| Person / Time | |
|---|---|
| Site: | University of Michigan |
| Issue date: | 11/03/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kerr W MICHIGAN, UNIV. OF, ANN ARBOR, MI |
| Shared Package | |
| ML20213G074 | List: |
| References | |
| NUDOCS 8611170312 | |
| Download: ML20213G072 (2) | |
See also: IR 05000002/1986002
Text
y
,
NOV 3
1986
Docket No. 50-2
University of Michigan
ATTN:
Dr. William Kerr, Director
Michigan Memorial - Phoenix
Project
Phoenix Memorial Laboratory
Ann Arbor, MI 48105
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. Patterson
and T. Ploski of this office on Octooer 16 and 17, 1986 of activities at the
University of Michigan Ford Nuclear Reactor authorized by NRC Operating
License No. R-28 and to the discussion of our findings with you and others
of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely
"Ori."ir O
-
Shracteri
,
W. D. Shafer, Chief
Radiological Protection Branch
Enclosure:
Inspection Report
No. 50-002/86002
See Attaced Distribution
RIII
RIII
RI
R_ I
RIII [
,1
Y
gCJ
'
T
z
Patters n/lms
Ploski
Snell
er
Shafer
VD
l
f
ya
p3I
c611170312 861103
j'-
DR
ADOCK 0500
2
,
- f
.
University of Michigan
2
NOV 3
1986
Distribution
cc w/ enclosure:
L. Greger, DRSS, RIII
D. Matthews, EPB, 0IE
W. Weaver, FEMA, RV
DCS/RSB (RIDS)
Licensing Fee Management Branch
!
,
1
-