ML20213F641

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation of Rev 2 to Vol 3 of, XN-NF-80-19(P), Exxon Nuclear Methodology for Bwrs, Thermex:Thermal Limits Methodology Summary Description. Rept Acceptable
ML20213F641
Person / Time
Issue date: 11/10/1986
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ward G
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20213F643 List:
References
NUDOCS 8611140361
Download: ML20213F641 (2)


Text

-_

- November 10, 1986 Mr. Gary N. Ward, Manager Reload Licensing Exxon Nuclear Company, Inc.

P. 0. Box 130 Richland, WA 99352

Dear Mr. Ward:

SUBJECT:

ACCEPTANCE FOR RE.ERENCING OF LICENSING TOPICAL REPORT XN-NF-80-19(P), VOLUME 3, REVISION 2, " EXXON NUCLEAR METHODOLOGY FOR BOILING WATER REACTORS. THERMEX: THERMAL LIMITS METHODOLOGY

SUMMARY

DESCRIPTION" We have completed our review of the subject topical report submitted by the Exxon Nuclear Company (ENC) (issue date September 1986). We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the rcport.

We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that ENC publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an _A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, ENC and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely,

.~ ,

G.C. Lira Gus C. Lainas, Assistant Director p Division of BWR Licensing f;I

Enclosure:

As stated $11%$ $$$N PDR Gd C

OFC kn F:DB SB  :  :  :

DBL:RSB y p DBL:RS) -_ g) :: ...__

DBL:RSB ...:._

.....:......._.___:... 7-_____:..__________:.....__---..:______ ----

NAME :PtiCC0Y:jh :LPHILD 7__: MWH0DG S :GL  :  :  : :

.....:..y.g_____:_. ________:.. ________:__) ... ____:..._________:_ .________ :._______ __

DATE : M /86 : /7/86  : /lD/86 : /fh/86  :  :  :

OFFICIAL RECORD COPY

.c. ,

DISTRIBUTION 163 RSB R/F W. Houston T. Speis A. Marinos ,

PDR DCS W. Hodges-G. Lainas A. Marinos L. Phillips I- M. McCoy M. McCoy R/F RSB Members 4

4 i

i i

o

- -- -- ---- --+ -,- - , ,,, - -- -- , --