ML20213F153

From kanterella
Jump to navigation Jump to search
Notifies of CRGR Meeting 74 on 850417 in Bethesda,Md to Discuss Forthcoming Proposed Rev to App J to 10CFR50, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors (Category 2 Item)
ML20213F153
Person / Time
Issue date: 04/03/1985
From: Stello V
Committee To Review Generic Requirements
To: Bernero R
Office of Nuclear Reactor Regulation
Shared Package
ML20213D984 List:
References
AB46-1-41, NUDOCS 8504050068
Download: ML20213F153 (2)


Text

-

'f f

4

@ Kle j

g UNITED STATES y

(

g NUCLEAR REGULATORY COMMISSION

~

5

-l WASHINGTON, D. C. 20555 f,

+

APR 3 1985 ime MEMORANDUM FOR:

Robert Bernero, NRR Edward L. Jordan, IE Richard E. Cunningham, NMSS Denwood F. Ross, RES Clemens J. Heltemes, Jr., AE0D Joseph Scinto, ELD FROM:

Victor Stiello, Jr., Chairman Committee to Review Generic Require [ents 4,

10BJECT:

CRGR HEFTING 10. 74 I t

The Committee to Review Generic Requi ments (CRGR) will meet on Wednesday, l.,

April 17,.1985, from 1-5 p.m. in Room 6507 MN3B. The agenda is as follows:

m.

.m

~'

1:00 - 2:00 p.m. - 5. Arlotto (r<ES) will'brisf the CRGR concerning a forth-60 ming proposed revision to.10 CFR Part 50, Appendix J, Primary Reactor Containment'l'eakage Testing for 4

'Weter-Cooled Power Reactors (Category 2 item).

2:0G'- 3:30 p.m. -

R. Burnett (NMSS) will piehent for CRGR review, the enclosed proposed revisiori to reporting requirements (for safeguards events)' contained in 10 CFR Part 73.71 (Category 2 item).

3:30.- 5:00 p.m. -

P. Norry (ADM) will present for CRGR review, the enclosed proposed rulemaking to establish retention f

periods for recordkeeping requirements in'10 CFR (Category 2 item).

If a CRGR member cagot attetid the meeting, Itic his responsibility to assure that an alternate, who is approved by the CRGRfChairman, atteitds the meeting.

p

, Persons making presentations to the CRGR are responsible foe (1) assuring that the information required for CRGR review it orovided to the Connittee (CRGR Charter - IV.8), (2) coordinating and presenting views of.other offices, (3) as appropriate, assuring that Uther offices are represented during the presentation,

.and (4) assuring that aaenda' modifications are coordinated with the CRGR contact (Walt Schwink, x28639) ahd others involved with the presentation. With regard to attendance at CRGR meetings, I reques_t that' Office Directors limit attendance of their staffs at CRGR meetings to those few senior staff needed to address the agenda item under discussion. As a :ninimum, Division Directors or higher management should attend meetings addressing agenda items under their purview.

j v

~

xA 7

~

g 3-D

u.,

SEb 3 E!

-2_

In accordance with the ED0's March 29, 1984 memorandum to the Commission con _

cerning " Forwarding of CRGR Documents to the Public Document Room (PDR)," the enclosures, which contain predecisional information will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.

s C:icin' r.U.m_i tj V. c....;

Victor Stello, Jr., Chairman Committee to Review Generic Requirements

Enclosures:

As stated cc: SECY Commission (5)

W. J. Dircks Office Directors Regional Administrators G. Cunningham P. Norry G. Arlotto R. Burnett Distribution:

VStello EFox JRoe JPhilips JHSniezck JHenry TRehm RHernan DEDR0GR staff FHebdon DEDR0GR cf RErickson PDR (NRG/CRGR)

WLittle JZwetzig Central File DFC :ROGR/S _____:e.{(D

ROGR
DED GR

_____:.._aq__k

,A,____:__________._:____________:.. _________:-----------

NAftE :WS iwfn ezek

V lo

$I85 DATE :4/2/85

4/- /85
4/

/