Text

November 4, 1986

[hh Qh '

N Distribution ocket File Docket Nos. 50-335 50-389 Local PDR PBD-8 Reading ETourigny PKreutzer MEMORANDUM FOR: Roger Walker, Director DCrutchfield Division of Reactor Projects JStolz Region II GKnighton FMiraglia FROM: Ashok C. Thadani, Director ISpickler PWR Project Directorate #8 JDonohew Division of PWR Licensing-B FSchroeder File 3.7b

SUBJECT:

TRANSFER OF LEAD RESPONSIBILITY, MPA-63, 64, 65 AND 68 (EMERGENCY RESPONSE FACILITIES AND IMPROVED METEOROLOGICAL CAPABILITY) FOR ST. LUCIE UNITS 1 AND 2 The purpose of this memorandum is to transfer the lead responsibility for completing the above MPAs to Region II. Based on phone conferences with the above licensee, the emergency response facilities and the improved meteoro-logical capability for the subject facility are complete. The next required action is your scheduling and conduct of inspection for these items. In this regard, Mr. D. Mathews, EPB/I&E, is in the process of developing the required inspection program.

Following the inspection, Region II may need to seek NRR assistance to close out any outstanding items.

Oric' nal cLyed, byt:

Acht k I%hni Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B

/ 17' PBD-8:

s

P PE
D:DRP ]RII PBD-8: PBD-8:  :

PKeedzter ETourig jch AThadani hew ISpickler RWalker 1D/g/86 f 10/k/86 10//6 /86 )/q/86 10/2086l 10/ /86

\/

e 8611130421 861104

{DR ADOCK 05000335 PDR ,

l II

Distribution Docket File Docket Nos. 50-335 NRC PDR 50-389 Local PDR PBD-8 Reading ETourigny PKreutzer MEMORANDUM FOR: Ro er Walker, Director DCrutchfield Div ion of Reactor Projects JStolz Regio II GKnighton FMiraglia FROM: Ashok C. adani, Director ISpickler PWR Project Directorate #8 JDonohew Division of 'R Licensing-B FSchroeder File 3.7b

SUBJECT:

TRANSFER OF LEAD ' RESPONSIBILITY, MPA-63, 64, 65 AND 68 (EMERGENCY RESPONSC\ FACILITIES AND IMPROVED METEOROLOGICAL CAPABILITY) FOR ST. LUCIE UNITS 1 AND 2 The purpose of this memorandum is to transf the lead responsibility for completing the above MPAs to Region II. Base on phone conferences with the above licensee, the emeroency response faciliti s and the improved meteoro-logical capability for the subject facility are h mplete.

Q The next required actionisyourschedulingandconductofinspectio\fortheseitems. In this regard, Mr. D. Mathews, EPB/I&E, is in the process o developing the required inspection program.

Following the inspection, Region II may need to seek NR assistance to close out any outstanding items.

Ashok C. Thadani, Direc r PWR Project Directorate Q Division of PWR Licensing-1

\

PBD-8: PBD-8: PBD-8: BWD-1: PBPE: D- tRII PKreuzter ETourignyjch AThadani JDonohew ISpickler 'a er~7 10/ /86 10 /86 10/ /86 10/ /86 10/ /86 pN/86