ML20213E687
| ML20213E687 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/16/1983 |
| From: | Sheron B Office of Nuclear Reactor Regulation |
| To: | Noonan V Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0676, CON-WNP-676 NUDOCS 8312020040 | |
| Download: ML20213E687 (1) | |
Text
RSD P/F: WNP-2 NOV 161983 TCollins R/F BSheron WHodges TCollins MEliORAllDUM FOR:
Vincent Noc.an, C.ief. Equipment Qualification Branch, DE FROM:
Brian W. Sheron, Chief, Reactor Systems Branch, DSI
SUBJECT:
JUSTIFICATION FOR INTERIM OPEPATION OF WNP-2 PRIOR TO COPFLETION OF THE SEISMIC QUALIFICATION PROGRAM
Reference:
Letter from G.C. Sorensen to the Director, NRR,
" Nuclear Project 2 Equipment Seismic Qualification",
dated November 4,1983 The reference letter provided the WPPSS justification for operation of WNP-2 prior to completion of the seismic qualification program for certain equipment.
Reactor Systems Branch has reviewed the justifications for those components which are part of the high pressure core spray (HPCS) system. We conclude that for those seismic events in which the HPCS system would be called into service, an alternate safe shutdown path is available. This path uses the automatic depressurization system (ADS) in conjunction with the residual heat removal (RHR) system, and cannot be disabled by a single active failure.
Interim operation is therefore acceptable provided that both the ADS and RHR systems are fully qualified for seismic phenomena.
Origin 3ISIlliti%
Brian W. Shares Brian W. Sheron, Chief Reactor Systems Branch Division of Systems Integration cc:
R. Mattson i
R. W. Houston l
R. Auluck l
RSB Section B Members y
X 8322020040 831116 S
v2 M __ADOCK 05000397 J
4F-
\\
o,.m.T 0SITRSB]' DS S
DS :RSB
~ ' ~ ~ ~
~ ~ ~ ~ ~ ~ - ~ ~ ~
. -.- TCollins/bg! WHodges
. L w...........
Sh n
11h//83
il1/lT83
'f1//g83'
~
om, L.,.:
-wc 2n n m scv om OFFICI AL RECORD CCPY c
1