ML20213E642
| ML20213E642 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/25/1983 |
| From: | Houston R Office of Nuclear Reactor Regulation |
| To: | Knight J Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0666, CON-WNP-666 NUDOCS 8311030310 | |
| Download: ML20213E642 (1) | |
Text
I3' E,M 3 Q7 YQ SJ T7 T
Tj c (
C t 4-
.w 0 07 2 s 1933 MEi10RAf1DUi1 FOR:
James P. Knight, Assistant Director for Components & Structures Engineering, DE FR0t4:
R. W. Houston, Assistant Director for Reactor Safety, DSI
SUBJECT:
JUSTIFICATION FOR INTERIM OPERATION, UPPSS NUCLEAR PROJECT ti0. 2 In your memorandum of October 5, 1983, you requested that we review the WitP-2 justification for interim operation using safety related electrical equipment which are not fully qualified for the environmental conditions which may be created by selected accidents.
The Containment Systems Branch (CSB) has reviewed the list of equipment attached to your memorandum and conclude that none are within the revien responsibility of the CSB; therefore, no opinion regarding the bases for interim operation is being provided by the CSB.
N-M [7.:f ?]
.i: ::';C R. W. Houston, Assistant Director for Reactor Safety Division of Systems Integration cc:
V. ficonan A. Scnwencer R. Auluck A. i4asciantonio distribution central file csb rdg file rs rdg file wbutler
..I g31o23 AtacK05000g7 op
Contact:
F. Eltawila, CSB:DSI, 294Ee s
"' ')j..CSB ;.DSgf.f..C.SB ;.DS.FEltawita:nmJKudriq.\\g?
....GS.B.: DS I.
'JSjDpIA
.',, f.
l J.
WBu tler 16(ouM6n l
c m veyi l@f 783 "" 10 6
'lD 7f 8 T "I0g("/E3"
]'
our)
/
- roau m.o ac. o:" "
OFFICI Ai_ RECORD COPY
- .5 30 au-x> "
w
-