V DISTRIBUTION DM8 PSRB Reading DHFS R/F Docket flo. 50-397 DLZiemann GRMazetis W0Long CCT 12 1983 MEMORANDUM FOR:

A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:

Dennis L. Ziemann, Chief Procedures and Systems Review Branch Division of Human Factors Safety

SUBJECT:

WNP-2 INITIAL TEST PROGRAM

Reference:

(a) Letter from G. C. Sorensen to A. Schwencer dated September 8,1983 In reference (a), WPPSS forwarded an operations analysis and technical specifications changes to support single-loop operation of WNP-2.

Reference (a) did not identify any FSAR Chapter 14 "Ir.itial Test Program" changes which may be necessary to support single-loop operation. He are concerned, both with the absence of this information and the possible last-minute test program changec which could occur for single-loop operation.

To preclude future delays in startup, we recommend that WPPSS be cautioned that the WNP-2 operating license will be conditioned to require NRC prior approval of deviations from the FSAR Chapter 14 (through Amendment 20) test program, and therefore, initial test program changes, if necessary, should be identified and evaluated promptly.

Original sig.,33 by:t Dennis L. Zier.nn Dennis L. Ziemann, Chief Procedures and Systems Review Branch Division of Human Factors Safety cc:

R. Auluck h.

valualu44 tsa t u r a eF ADOCK 05000397 es

~

1

1. 3 l\\

W.....FVd.S..RD......

R B.....D..H FS...:.P..S.R..B omer>

suame >. W.0.L9.n g.;.a.h.,,,,

..G R,

,,,,1:,i s.,,,,,,p,LJ,i,e.MQD...

..l.0Il'M8.a.......l.0/..\\V.83......10/.i.Y/.83....

om>

Lac roeu ats oo-so) Nacu a2e OFFICIAL RECORD COPY uccem-m.wa 1

DATEL:

_ Uc to rier IL, i JS Yrt!n' T CPET DISTRIBUTION:

Local PDR*

fiRC PDR*

PRC*

fiSIC*

  • (w/ ir. coming)

LB!2 File RAulucL EHyltor.

P0'B rien/Tilova k DEisenhut/RPurple fiJambor HDenton/ECase ELJordan, DE0A:IE JMTaylor, DRP:IE Paton, OELD e

October 18, 1983 617

~

MEMORANDUM FOR:

J. B. Martin, Regional Administrator

'g O.

Region V FROM:

H. R. Denton, Director Office of Nuclear Reactor Regulation

SUBJECT:

LIST OF DOCUMENTS CONCERNING WNP-2 ON QA, QC AND DESIGN DEFICIENCIES Per your request dated Octcber 7,1983, we have searched our Branch files for documents concerning QA, QC and design deficiencies at WNP-2 and find that most of these documents are in the Central Files. Attached is a list of additional documents which are not in the Docket Files.

If you have any questions, please call R. Auluck, WNP-2 Project Manager, at (FTS) 492-8547.

w awn li.1 f ects H. R. Denton, Director Office of Nuclear Reactor Regulation

Attachment:

As stated l

i l

l

  • SEE PREVIOUS PAGE FOR CONCURRENCES DL:LB#2/PM
  • DL:LB#2/BC
  • DL: AD/L
  • DL:DIR*

h NRT/)

RAuluck:pt ASchwencer TMNovak DGEisenhut E Case HRLYnton 10/}/83 10/14/83 10/14/83 10/14/83 10/14/83 10/

83 l

(

O 7

h PDR

o Guy H. Cunningham, ELD to H. R. Denton, dated October 14, 1982,

" Commission Decision on Wf:P-1 and WNP-2 CP Extension Hearing Petitions."

Daily Highlight, dated February 28, 1983, " Board Decision on Request for Hearing Filed by the Coalition for Safe Power."

R. Auluck to T. Novak, dated October 20, 1982, " Commission Decision on WNP-2 CP Extension Hearing Petition."

K. L. Leu to R. Auluck, dated October 15, 1982, " Containment Out-of-Roundness."

K. C. Leu to R. Auluck, dated December 27, 1982, "WNP-2 Containment Out-of-Roundness."

P. Witley to R. Auluck, dated April 16, 1982, " Containment Out-of-Roundness."

Report dated April 20, 1983, "WNP-2 Design Reverification Status Meetirg."

Report dated November 10, 1982, "UNP-2 Plant Verification f*eeting with NRC."

R. H. Engelken to H. R. Denton, dated October 5, 1982, "Self-initiated Evaluation of Washington Public Power Supply, Unit 2."

J. L. Crews to T. M. Novak, dated April 6, 1983, "WNP-2 Independent Design Verification Program."

R. F. Heishman to G. Bagchi, dated August 2, 1983, " Rigid Conduit Connections to Electrical Equipment Enclosures at WNP-2."

K. C. Leu to G. Lear, dated July 13,1983, "WNP-2 Construction Problem and its Potential Impact on the Licensing Schedule."

l J. M. Taylor to R. Vollmer, dated July 1, 1983, "WNP-2 Component Support Design and Construction."

D. M. Sternberg to A. Schwencer, dated February 13, 1983 "FSAR Amendment No. 27, WNP-2, Docket No. 50-397."

l F. Rosa to 8. J. Youngblood, dated April 17, 1981, "WNP-2 Cable' Separation Criteria."

l

5. Rhow to M. Srinivasan, " Trip Report on Site Visit of L:f.P-2 (May 1982)."

.p e t %,

E..

UNITED STATES

[ Q, yi NUCLEAR REGULATORY COMMISS!GN

.%, J ),'

s g % &l,i f f WASHINGTON, D. C. 20555 7

p

+....

\\

FROM:

J.

MARTIN, REGION V ORIG. DUE DATE: 6 TICKET NO: 6 DOC DATE:

10/07/83 e

TO:

DENTON/DEYOUNG

' y;71 NRR RCVD DATE:

10/11/83

\\

    • YELLOW **

f FOR SIGNATURE OF: DENTON DESC:

CC:

DENTON/ CASE j

FUNCHES q

l 1.

VOLLMER REFERRED TO: DL DATE: 10/11/S3 r

2.

MATTSON CONTACT: 6 l

3.

THOMPSON 4.

SPEIS d'

fo[L

/

5.

GRACE 6.

SNYDER

/sY ' *7 L.

yl

~

(.. l

[#

l

~

./

.dd j

[pg3,e/v

,/'s:, -

PLEASE REVIEW THE DUE DATE IMMEDIATELY:

IF THE DUE DATE DOES NOT ALLOW ADEOUATE REQUESTS FOR REVISION OF YELLOW TIME TO RESPOND TO THIS TICKET, YOU MAY TICKET DUE DATES MAY BE MADE, WITH REQUEST A REVISED DUE DATE. THE REQUEST JUSTIFICATION, THRU THE WEEKLY WITS MUST INCLUDE A VALID JUSTIFICATION AND UPDATE UP TO ONE WEEK AFTER ASSIGN-BE MADE THROUGH YOUR CORRESPONDENCE CO-MENT BY NRR MAIL ROOM. THE NEW DUE ORDINATOR TO THE NRR MAIL ROOM (KAREN DATE, IF APPROVED BY NRR MAILROOM, BOWMAN OR MELANIE GARVER).

WILL BE USED TO TRACK DIVISION COR-RESPONDENCE COMPLETION SCHEDULES.

PLEASE DO NOT HAND CARRY CONClJRRENCE PACKAGES TO DIRECTORS OFFICE WITHOUT FIRST GOING THRU THE NRR MAIL RCOM.

M

,3. %,

N

~

./

UNITED STATES

!f NUCLEAR REGULATORY COMMISSION

' (

k... c/c' \\

' ld ['i:

REGloN V E.[j 8450 MARIA LANE. SUITE 210 TM g,,

WALNUT CREEK, CAttFORNI A M596

[

OCT 7 1993 (

IA yV MEMORANDUM FOR:

H. Denton, Director Office of Nuclear

' \\c 9 s

Reactor Regulation R. C. DeYoung, Director, Office of Inspection

~ )

~]

and Enforcement FROM:

J. B. Martin, Regional Administrator

SUBJECT:

QUESTIONS AND REQUEST FOR DOCUMENTS CONCERNING WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WNP-2) BY REPRESENTATIVE JIM WEAVER The subject request was made by Representative Weaver in a letter to Chainnan Palladino dated September 28, 1983, a copy of which was provided tc you by EDO on October S.1983 (Principal Correspondence Control No.13616).

Region V has the lead assignment in responding to Representative Weaver.

Your assistance is necessary in our efforts to prepare a proper response.

Specifically, your assistance is requested in preparing a list of the documents referred to in the next to last paragraph on page 2 of Representative Weaver's letter, e.g. "... provide a list of al_1 documents, including internal staff recorts and memoranda, on quality assurance, quality control, design deficiencies 2

~

or manacement oroblems at WPPSS 2 which were written by, sent to, or routed through NRC since 1980.

This list need _not include documents contained in the public records of NRC proceedings".

In particular, documents of the nature described above could relate, but not necessarily be limited, to the civil penalty and 50.54(f) actions of June 1980, the ongoing independent ' design review (IDVP) program and the recent CAT inspection efforts at WNP-2.

I To meet 06Fcurrent scTdiiMe for response, we need your listing of documents by COB orkOctober 14, 1983.

This request has been discussed by J. L. Crews of this ci?we #t' n...s es (R. Auluck and R. Heishman) of your staffs.

Your cooperation in this request is appreciated.

Contact:

J. L. Crews (FTS 463-3735)/P. Johnson (FTS 463-3745).

h iceoscesa31018

//gfe PDR ADOCK 05000397 A

PDR J. B. Martin Regional Administrator cc:

D. Eisenhut, NRR i

R. Vollmer, NRR R. Auluck, NRR J. Taylor IE R. Heishman, IE T. Rehm, EDO

.{-_.

ROUTitiG mig THNidf.flTTAL SLIP 10/11/83 TC: g' flame. office symbol, room nutiber, Initials Date Duilding. Agency / Post) 2.

DL 53 Y

'2.

3.

4 (L

Action Flie Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Information See Me Comment investigate Signature Coordination Justify REMARKS THIS IS A C0flTROLLED ACTI0fl DOCUMEflT BUT COULD fl0T BE ASSIGNED A Ilut1BER TODAY.

IT IS BEING FORWARDED WITHOUT A YELLOW TICKET NUf1BER DUE TO THE TIME ELEMENT IrlVOLVED.

N t

1 DO NOT use this form as a RECORD of approvals, concurrences, disposalm, clearances, and similar actions TROM: (Hame, org, symbol, Agency / Post)

Room No.-Bidg.

P-428 fiRR Mail Room l1 enon. No.

24966 5041-102 e cro i tsoo o - att-ass-(si OPTIONAL FORM 41 (Rev. 7-76)

nggcy, k

l

./.gr.n 58cgc; UNITED STATES

~ ' E "$ e < Y $

~ NUCLEAR REGULATORY COMMISSION

$.h

/, j REGloN V 0, Wh g.

1450 MARIA LANE,SulTE 210

% ~%>

,e WALNUT CREE K, CALIFo RNIA 94596 00T 71983 MEMORANDUM FOR:

fj. Denton, Director, Office of Nuclear Reactor Regulation R. C. DeYoung, Director, Office of Inspection and Enforcement FROM:

J.

B,. Martin, Regional Administrator

SUBJECT:

QUESTIONS AND REQUEST FOR DOCUMENTS CONCERNING WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WNP-2) BY REPRESENTATIVE JIM WEAVER 6

The subject request was made by Representative Weaver in a letter to Chairman Palladino dated September 28, 1983, a copy o# which was provided to you by ED0 on October 5,1983 (Principal Correspondence Control No.13616).

Region V has the lead assignment in responding to Representative Weaver.

Your assistance is necessary in our efforts to prepare a proper response.

Specifically, your assistance is requested in preparing a list of the documents referred to in the next to last paragraph on page 2 of Representative Weaver's letter, e.g. "... provide a list of all documents, including internal staff reports and memoranda, on quality assurance, ' quality control, design deficiencies, or management problems at WPPSS 2 which were written by, sent to, or routed through NRC since 1980.

This list need not include documents contained in

~

_th_e public records of NRC proceedings".

In particular, documents of the nature described above could relate, but not necessarily be limited, to the civil penalty and 50.54(f) actions of June 1980, the ongoing independent design review (IDVP) program and the recent CAT inspection efforts at WNP-2.

To meet our current schedule for response, we need your listing of documents by COB on October 14, 1983.

This request has been discussed by J. L. Crews of this office with members (R. Auluck and R. Heishman) of your staffs.

Your cooperation in this request is appreciated.

Contact:

J. L. Crews (FTS 463-3735)/P. Johnson (FTS 463-3745).

j/Q4h.

J. B. Martin Regional Administrator cc:

D. Eisenhut, NRR R. Vollmer, NRR R. Auluck, NRR J. Taylor, IE R. Heishman, IE T. Rehm, ED0