ML20213E630
| ML20213E630 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/19/1983 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Knight J Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0662, CON-WNP-662 NUDOCS 8310260360 | |
| Download: ML20213E630 (1) | |
Text
\\
<3
-3 To DXSTRIBUTION N
AEB R/F FAkstulewicz TQuay Plant File AD/RP RF Docket I'c.:
50-397 OCT 101983 ilEi!0RANDUll FOR:
James Knight, Assistant Director Ccnponents and Structures Engineering Division of Engineering FRCit:
Daniel R. I!uller, Assistant Director for Radiation Protection Division of Systens Integration
SUBJECT:
JUSTIFICATIOff FOR IitTERIli OPERATI0ft, WPPSS flVCLEAR PROJECT #2 tie have reviewed your letter dated October 5,1983 and conclude that only items 27 and 28 are applicable to the Accident Evaluation Branch review responsibility.
He have reviewed the justifications provided for these components and conclude that they previce an acceptable basis for interin operation until actual qualif'ication documentation can be obtained.
Original signed by Daniel R. Muller _.
Daniel R. fiuller, Assistant Director for Radiation Protection Division of Systens Integration cc:
R. flattson V. Iloonan R. LaGrar.ge A. Masciantonio 8310260360 831019 J,
P W ADOCK 05000397 DSI:AEBMl,,DSI:AEB DSIjAEB_
.DS,,I,: AD/RP,,, l,
f omer)
F. A.kst.ulewicz'.. TQuay T,,,N ' LGHuhian; DMu_lJpy......l'.
suanaue>
.r
.. 7.j.
.. l.0!]{f83,.10!jj/83 10,/,,G/,83 IQ
/,,3 DATE )
,.--....7-.-...-
OH1C p L RE C O_a D C O P Y m-
-