Reviews Items 27 & 28 from Re Justification for Interim Operation.Acceptable Basis Exists for Interim Operation Until Actual Qualification Documentation Can Be Obtained
ML20213E630
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/19/1983
From: Muller D
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
References
CON-WNP-0662, CON-WNP-662 NUDOCS 8310260360
Download: ML20213E630 (1)


Text

\\

<3

-3 To DXSTRIBUTION N

AEB R/F FAkstulewicz TQuay Plant File AD/RP RF Docket I'c.:

50-397 OCT 101983 ilEi!0RANDUll FOR:

James Knight, Assistant Director Ccnponents and Structures Engineering Division of Engineering FRCit:

Daniel R. I!uller, Assistant Director for Radiation Protection Division of Systens Integration

SUBJECT:

JUSTIFICATIOff FOR IitTERIli OPERATI0ft, WPPSS flVCLEAR PROJECT #2 tie have reviewed your letter dated October 5,1983 and conclude that only items 27 and 28 are applicable to the Accident Evaluation Branch review responsibility.

He have reviewed the justifications provided for these components and conclude that they previce an acceptable basis for interin operation until actual qualif'ication documentation can be obtained.

Original signed by Daniel R. Muller _.

Daniel R. fiuller, Assistant Director for Radiation Protection Division of Systens Integration cc:

R. flattson V. Iloonan R. LaGrar.ge A. Masciantonio 8310260360 831019 J,

P W ADOCK 05000397 DSI:AEBMl,,DSI:AEB DSIjAEB_

.DS,,I,: AD/RP,,, l,

f omer)

F. A.kst.ulewicz'.. TQuay T,,,N ' LGHuhian; DMu_lJpy......l'.

suanaue>

.r

.. 7.j.

.. l.0!]{f83,.10!jj/83 10,/,,G/,83 IQ

/,,3 DATE )

,.--....7-.-...-

OH1C p L RE C O_a D C O P Y m-

-