Addresses Util 830803 Request to Defer Installation of Qualified Source Range Monitors Until First Refueling Outage.Delay Needed to Find & Qualify Replacement Per Reg Guide 1.97.Deferral to 850331 Acceptable
ML20213E619
Person / Time
Site: Columbia 
Issue date: 10/05/1983
From: Houston R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0659, CON-WNP-659, RTR-REGGD-01.097, RTR-REGGD-1.097, RTR-REGGD-737 NUDOCS 8310180030
Download: ML20213E619 (2)


Text

.

e k del Q R 397 OCT 51983 ME"0RA!10Ti FOR: Thonas f!. t'ovak, Assistant Director for Licensing Division of Licensing FR0ft:

R. Hayne Houston, Assistant Director for 9eactor Safety Division of Systens Integration

SUBJECT:

HilP-2 SOURCE RA!:0E tiO!!ITOR 011ALIFICATIO!!

plant t!are: HflP-2 Docket !!o.:

50-397 Licensing Status: OL Responsible Branch: LB.52 Drsn=;3 g.,4,,

Project l'anager:

R. Auluck Reviet Branch:

ICSB G rtin ed 27 5

y~--

pCCd Review Status:

Inconplete The purpose of this nerorandun is to address the applicant's rnquest to defer installation of qualified source range nonitors (SRf's) until the first refueling outage. The SF"s are required to be qualified in accord-ance with Pegulatorv Cuide 1.97 Rev. ? (R.G.1.97 Rev. 2 - Instrorentation for Light-Water-Cooled ifuclear power Plarts to Assess Plant and Environs Conditions During and Following an Accident).

F.G.1.97 %v. 2 lists neutron flux as a Type M. Cateqory 1 variable (i.e., infermtion that in-dicates whether plant safety functions are being acceplished; the associ-ated instrunentation nust he seisnically.and environnentally qualified, powered fron Class IE sources, cmply with the single failure criterion, etc.). The anplicant has stated that the existing SP't instrurent channels cannot be completely qualified and that an acceptable replacement doas not exist in industry. The deferral is necessary to allow adequate time to find and quality a suitable replacerent. The applicant has enviitted to provide qualified SR!is (see FSAR Section 7.5.7.2.3.0).

The staff has allowed delays for implenentation of specific P.C.1.97 Rev. 2 instrurentation itens if adequate,iustification for the delays and connitnents to install the qualified instru-:entation within a reascnable tine are received fron the applicant. nased on our review of the apnli-cant's submittal (letter G02-83-693 dated August 3,1983) we find their propnsal to defer installation of fully qualified SRf:s to be acceptable.

However, the fully qualified SR"s (i.e., qualified and installed in accord-ance with R.G.1.97 Rev. P. guidelines) should he installed and operation.

al by !! arch 31, 1095 consistent with the goal of final qualification of

Contact:

R. ':endall ICSB X2M51 100030 G31005 7-- f )

,8310 Os Ow =347 Car a >

m---.~.

~.--.....---..-....

- - - - - - - - - - - - - - -. - - - ~ ~ - - - - ~ ~ - - - ~

- - ~ ~ - - - ~ ~

6 p$

~~ '

T. Novak electric equinnent in Section 50.49 of In CF" Part so as vended by Federal Register '/o1.13 Mo.15 Friday,.lanuary 21, 1903 ftules and Regitla tions.

This amendaant contains the final rule for " Environmental Dualification of Electric Equiptwnt Important to Safety for !:nclear Dover olants."

"e are approving deferral to f4rch 31, l'135 instead of the first refueling outage t:ecause it is not clear whether the outage would fall within this date.

E

/

R. Hayne Mouston, Assistant Director for Reactor Safety Division of Systens-Integration cc:

R. !'attson DISTRIBUTION:

A. Schwencer Docket File R. Auluck ICSB R/F

1. Capra R. Kendall (PF)(2)

C. Rossi F. Rosa AD/RS Rdg.

J. Joyce WNP-2 S/F

\\ "

_t c,, enl ICSB/DSI \\]

ICSB/DS pB/D

'ICSB/DSI. '

DRS/.Dk l

. h 5 t..

O FR05 aHo.uth

" * '" " ' )

,}, /,,g,,/8,3,,,,1,0/3,,,/ 83, f.,,.10/.[/,83..

. ) 0/.../83g...

..N...I./83 I

0 OFFICIAL RECORD COPY cre. ora.u w s coc2.a

.il

yd%,

Q

~27 Ei$

1],

"~

s CCT E 19 33 DISTRIRUTION:

See attached page

~

Docket No. 50-397 MEMORANDUM FOR:

A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:

R. Auluck, Project Manager Licensing Branch No. 2, DL

SUBJECT:

FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

DATE & TIME:

Friday, October 14, 1983 8:30 AH LOCATION:

Room P-114 Phillips Builtjing Bethesda, MD PURPOSE:

Discussion of CAT findings in the Civil and Structural Construction area.

PARTICIPANTS *:

NRC WPPSS D. Jeng P. Powell & WPPSS staff R. Auluck K. C. Leu l

H. Wong i

R. 00:fds I

J.: cry R. Auluck, Project Manager Licensing Branch No. 2 Olvision of Licensing cc: See next page eerSO44-031006 SJ>['

PDR ADOOK 05000397 A

PDR

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other prties to attend as observers pursuant to "Open Meeting and Statement of NRC Staff Policy", 43 Federal Rentster 28058, G/28/78.

.I

/

.3

' " ' > 9L..:.l3 f /$h -dL

.h ),h,#

'l '.. '

~ '"' " ' "

";"^"'%.k..., kw A

"" h.1. 9 (. f/ 8 3...b.f.S..c.....e. n.c..e. r...

\\.10/(0./B.3..

he reno m.,e.c, s.,co c:'

OFFICIAL PECORDTOPY

  • u 5. cao en -a c>2o

DCT 5 Gia MEETING NOTICE DISTRIBUTION:

Date:

A L PDR NSIC PRC LB#2 Reading NRC PARTICIPANTS:

E. Hylton Project Manager R. Auluck D. Jeng H. Denton/E. Case R. Auluck D. Eisenhut/R. Purple K. C. Leu T. M. Novak*

H. Wong B. Youngblood R. Dodds A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J. P. Knight W. Johnston D. Mull er T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst D. Ziemann NRR Division Directors

  • OELD Attorney y. piton E. L. Jordan, DEQA:IE J. M. Taylor, DRP:IE Phillips Suilding Receptionist **

ACRS (16)

Region y

Resident Inspector cc:

Service List l

F. Ingram, PA i

  • 0nly if participant in meeting
    • 0nly if meeting held in Bethesda 1

l l

l l

i.

WNP-2 Mr. D. Mazur Managing Director Washington Public Fower Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:

Nicholas Reynolds, Esquire Debevoise & Liberman

~

1 1200 Seventeenth Street, N. W.

Washington, D. C.

20036 Mr. G. E. Doupe, Esquire s

Washington Public Power Supply System P.0. Box 968 3000 George Washington Way qishland,'. Washington 99352 Nicholas Lew'is, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson ~, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352

~

Mr. W. G. Conn, Sr. N/M Group-Supervisor Burns and Roe, Incorporated

.'601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil U.S. NRC Resident inspector WPPSS-2 NPS

~

P.O. Box 69 Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety ?, Regulatory Frograms Washington Public Power Supply Systea P.O. Box 968, MD 650 Richland, Washington 99352 9

8

.M..)I

y%Q 7

.D

.._s:1 7

.. ; )

a g

. p ~y

~.

DCT 6 1983 DISTRIBilTIO'N:

See attached page Docket No. 50-397 MEMORANDUM FOR:

A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FP0M:

R. Auluck, Project Manager Licensing Branch No. 2, DL

SUBJECT:

FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

DATE & TIME:

Tuesday, October 18, 1983 8:30 AM LOCATION:

Room P-110 Phillips Building Bethesda, MD PURPOSE:

Seismic and Dynamic Qualification of Electrical and Mechanical Equipment PARTICIPANTS *:

NRC WPPSS R. Wright J. E. Rhoads R. Auluck W. W. Waddel J. Singh, INEL K. R. Wise e-

/*

R.' Auluck, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting and Statement of NRC Staff Policy",

43 Federal Register 28058, 6/28/78.

-631013G212-831006 PDR ADOCK 050003'?7 A

PDR

~

gB[

emer >

D,L,: LB DL

...hW..hN.1

"""> (

e9c,e,r, EATr >

10/'5 /83 T 10/ /83 ac ronu aio no.soi sacu o24o OFFICI AL RECORD COPY t u. wo ass-c.247

~'

t. s T' s.

MEETING NOTICE DISTRIBUTION:

Date:

~

s L PDR NSIC PRC LB#2 Reading NRC PARTICIPANTS:

E. Hylton Project Manager R. Auluck R. Wright H. Denton/E. Case R. Auluck D. Eisenhut/R. Purple J. Singh, INEL T. M. Novak*

B. Youngblood A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J. P. Knight W. Johnston D. Mull er T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst D. Ziemann NRR Division Directors

  • OELD Attorney W. Paton E. L. Jordan, DEQA:IE J. M. Taylor, DRP:IE Phillips Building Receptionist **

ACRS (16)

Region V

Resident Inspector cc:

Service List F. Ingram, PA

  • 0nly if participant in meeting
    • 0nly if meeting held in Bethesda

WNP-2 s

Mr. D. Mazur Managing Directcr Washington Public Power Supply System P. O. Box 968 3000 George Washington Way RichTand, Washington 99352 cc:

Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, N. W.

Washington, D. C.

20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W. G. Conn, Sr. N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety & Regulatory Programs Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352

.-