ML20213E606

From kanterella
Jump to navigation Jump to search
Agrees That Newly Revised STS Should Be Used as Basis for Inservice Snubber Surveillance Requirements for Plant Rather than Proof & Review Tech Specs
ML20213E606
Person / Time
Site: Columbia 
Issue date: 09/19/1983
From: Bosnak R
Office of Nuclear Reactor Regulation
To: Thomas C
Office of Nuclear Reactor Regulation
References
CON-WNP-0652, CON-WNP-652 NUDOCS 8309270064
Download: ML20213E606 (1)


Text

_

y b,.

Q

-1 43

.4

.- A

.~

Dl5TRiBili10N:

Document Cobi DeddN SEP 1 91983

MEB~Redding File ~

-~

!!Ef'ORANDUtl FOR:

Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing FR0ti:

Robert J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering

SUBJECT:

PROOF AND REVIEW CF WNP UNIT 2 TECHNICAL SPECIFICATI0tlS Our staff has reviewed the subject Technical Specifications. We agreed with D. Hoffman of your staff that the newly revised Standard Technical Specificaticns should be used as the basis for inservice snubber surveillance requirements for the subject plant rather than the subject Technical Specifications. We are also in agreement that the subject Technical Specificatiens content on the requirements for pressure isolation valves should follow the guide lines set for the revision of the Standard Technical Specifications as modified by the ccoments in the memorandum from Bosnak to Themas, "MEB Coments on Draft BWR/4,5, and 6 Standard Technical Specifications", dated October 5,1982.

" Original Signed by R. J. Bosnak" Robert J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering cc:

H. Brammer F. Cherny D. Hoffman H. Shaw

Contact:

H. Shaw, DE:MEB, x24420 k

ADOCK05000397[f.

G309270064 930919 SF W

-P

. p.E.:.HE B.....

.... D E.; M E,

,,,.,DE :ME,f,,

'"*>.SHaw 1,b,.

,,,HB, rammer

, RB,ospa,k,.

.gs/8(,,,,,,,,,9/g[83 9

o=>

,,,,,,g,,y83 9

ac roxu aia no.somacu o24o OFFICIAL RECORD COPY

  • u.s. cao us3-422u

-