Forwards NRR Input to SALP for Aug 1982 - Jul 1983.Overall Rating of Category 2 Assigned
ML20213E589
Person / Time
Site: Columbia 
Issue date: 09/01/1983
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
CON-WNP-0648, CON-WNP-648 NUDOCS 8309120251
Download: ML20213E589 (2)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

~,

y SEP 1 1983 DisTpinuTimi-RAul uck

!!El10RANDUM FOR:

Darrell G. Eisenhut, Director Division of Licensing THRU:

Th omas H. Novak, Assistant Director

~ for Licensing Division of Licensing A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:

Raj Auluck, Project Manager Licensing Branch No. 2 Division of Licensing

SUBJECT:

NRR INPUT TO SALP - WNP-2 Ue have completed the NRR input for the SALP for Washington Public Power Supply System (WPPSS), Project No. 2.

A copy of the SALP report is attached.

An overall rating of Category 2 is given to UPPSS with regard to their Project No. 2.

This was based upon input solicited from selected staff personnel who have had substantial contact and involvement with UNP-2's licensing activities.

The draft was also reviewed by the NRR Division Directors.

OrQinal ci2r.ed by:

Raj Auluck, Project Manager Licensing Branch No. 2 Division of Licensing

Attachment:

SALP report cc:

D. M. Sternberg R. T. Dodds N

3[k' 8309120251 830901 p ADOCK 05000397 "UP' N-n DL:LBg/R4' DL 27BC UL: U/^ '

omen suan*w q(~ 4.1%c k..:.pt..

.. A5 c h enc er.

.d.

k.

om dB/31./.83...8hg/83..

$Il.83..

\\

OFFICIAL RECORD CC?Y

= r: e.

a n

.nc rosu my :n..acu ma J

~

SYSTEMATIC ASSE55P.ECT OF L3 CENSE'E PEP.F03 MAN'.E i

FACILITY: Washington Public Power Supply System Nuclear Project No. 2 LICENSEE: Washington Public Power Supply System i

APPRAISAL PERIOD:

August 1,1932 through July 31,1933; Cycle 4 F'JNCTIO"AL AREA:

Licensing Activities PP.CJECT R;*;AGER:

F.sjender Auluck Analysis During this appraisal period, the staff was involved, along with the applicant, in resolvir g the open items related to the issuance of operating license for W"P-2.

During this period three supple:ents to the WNF-2 Safety Analysis Fsport were issued.

Adviscry Cer i;:ee cn Reactor Safeguard's (ACRS) sub-cc mittee teeting was held in Septe bar 1982 and the full committee met in 0:tober 1932.

Washington Public Power Supply System (ilFPSS) has demonstrated a high degree of management control and involverei.t in achieving resolution of licensing issues.

Management involvcment was particularly evident in addressing the NRC concerns in the emergency planning program and the i

recuirements for the emergency response capability.

The apprcach of the licensee to the resolution of technical issues from a.

cafety standpcint is te:hnically stund ir alcest all cases.

This.ca s 4

particularly evident in the auxiliary systems crea where the liccnsee justified the deviation in resolving the issue of "Tornad,o-missile protection for diesel generator exhaust."

4 I

In response to NRC initiatives, the licensee provided timely respohses with acceptable resolutions.

Delays were experienced in few casas.

' Personnel in the key positions of licensing activities are knowledgcable l

and professional.

During the meetings with the NRC, the applicant has-provided the appropriate technical and management level personnel to cake the'cettings productive.

i' I

Conclusiens Based on the evaluation for a number of significant licensing activities, i

an overall rating of Category 2 is given to Washington Public Power Supply System with regard to their proje:t No. 2.

The lice see has been 5:

i characterized as being knowledgeable, cocperative,, technical competent and responsive in the area of licensing activities.