y SEP 1 1983 DisTpinuTimi-RAul uck
!!El10RANDUM FOR:
Darrell G. Eisenhut, Director Division of Licensing THRU:
Th omas H. Novak, Assistant Director
~ for Licensing Division of Licensing A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:
Raj Auluck, Project Manager Licensing Branch No. 2 Division of Licensing
SUBJECT:
NRR INPUT TO SALP - WNP-2 Ue have completed the NRR input for the SALP for Washington Public Power Supply System (WPPSS), Project No. 2.
A copy of the SALP report is attached.
An overall rating of Category 2 is given to UPPSS with regard to their Project No. 2.
This was based upon input solicited from selected staff personnel who have had substantial contact and involvement with UNP-2's licensing activities.
The draft was also reviewed by the NRR Division Directors.
OrQinal ci2r.ed by:
Raj Auluck, Project Manager Licensing Branch No. 2 Division of Licensing
Attachment:
SALP report cc:
D. M. Sternberg R. T. Dodds N
3[k' 8309120251 830901 p ADOCK 05000397 "UP' N-n DL:LBg/R4' DL 27BC UL: U/^ '
omen suan*w q(~ 4.1%c k..:.pt..
.. A5 c h enc er.
.d.
k.
om dB/31./.83...8hg/83..
$Il.83..
\\
OFFICIAL RECORD CC?Y
= r: e.
a n
.nc rosu my :n..acu ma J
~
SYSTEMATIC ASSE55P.ECT OF L3 CENSE'E PEP.F03 MAN'.E i
FACILITY: Washington Public Power Supply System Nuclear Project No. 2 LICENSEE: Washington Public Power Supply System i
APPRAISAL PERIOD:
August 1,1932 through July 31,1933; Cycle 4 F'JNCTIO"AL AREA:
Licensing Activities PP.CJECT R;*;AGER:
F.sjender Auluck Analysis During this appraisal period, the staff was involved, along with the applicant, in resolvir g the open items related to the issuance of operating license for W"P-2.
During this period three supple:ents to the WNF-2 Safety Analysis Fsport were issued.
Adviscry Cer i;:ee cn Reactor Safeguard's (ACRS) sub-cc mittee teeting was held in Septe bar 1982 and the full committee met in 0:tober 1932.
Washington Public Power Supply System (ilFPSS) has demonstrated a high degree of management control and involverei.t in achieving resolution of licensing issues.
Management involvcment was particularly evident in addressing the NRC concerns in the emergency planning program and the i
recuirements for the emergency response capability.
The apprcach of the licensee to the resolution of technical issues from a.
cafety standpcint is te:hnically stund ir alcest all cases.
This.ca s 4
particularly evident in the auxiliary systems crea where the liccnsee justified the deviation in resolving the issue of "Tornad,o-missile protection for diesel generator exhaust."
4 I
In response to NRC initiatives, the licensee provided timely respohses with acceptable resolutions.
Delays were experienced in few casas.
' Personnel in the key positions of licensing activities are knowledgcable l
and professional.
During the meetings with the NRC, the applicant has-provided the appropriate technical and management level personnel to cake the'cettings productive.
i' I
Conclusiens Based on the evaluation for a number of significant licensing activities, i
an overall rating of Category 2 is given to Washington Public Power Supply System with regard to their proje:t No. 2.
The lice see has been 5:
i characterized as being knowledgeable, cocperative,, technical competent and responsive in the area of licensing activities.