ML20213E580
| ML20213E580 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/30/1983 |
| From: | Liaw B Office of Nuclear Reactor Regulation |
| To: | Thomas C Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0645, CON-WNP-645 NUDOCS 8309060633 | |
| Download: ML20213E580 (2) | |
Text
_
AUG 3 0 1983 MEMORANDUM FOR:
Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing FROM:
B. D. Liaw, Chief Materials Engineering Branch Division of Engineering
SUBJECT:
PROOF AND REVIEW 0F WASHINGTON NUCLEAR POWER UNIT 2 TECHNICAL SPECIFICATIONS The Materials Engineering Branch, Division of Engineering, has reviewed j
Sections 4.0.5, B4.0.5 and 3/4.4.6 on pages 3/4.4-16 thru 3/4.4-19 of the WNP-2 Technical Specifications dated June 23, 1983.
These specifications are acceptable, except as noted below:
1.
Curves A, B and C, in Figure 3.4.6.1-1, are to be effective for the first three effective-full power years (EFPY) only.
2.
Curves A', B' and C', in Figure 3.4.6.1-1, are to be effective for ten effective-full power years (EFPY).
3.
The withdrawal schedule for the Reactor Vessel Material Sur-veillance Program in Table 4.4.6.1.3-1 must be revised to be in accordance with ASTM E-185-82.
ASTM E-185-82 requires that Capsule 1 be withdrawn at 6 EFPY and Capsule 2 be withdrawn at 15 EFPY.
4.
The pressure-temperature limit curves in Figure 3.4.6.1-1 do not comply with the closure flange pressure temperature safety margins in Paragraph IV.A.2 of Appendix G, 10 CFR 50, which became effective on July 26, 1983.
We will be sending to all licensees / applicants a generic letter informing them of the revised regulatory requirements.
In accordance with that letter, the pressure-temperature limit curves in Figure 3.4.6.1-1 may require revision.
Contact:
B. J. Elliot 2H41-R309060633 830830 7k
{
W ADOCK 05000397 CF'
'[) -
n
/
r Cecil 0. Thomas '
MG 3 0 1983 These comments have been coordinated with Mr. Donald R. Hoffman of your staff.
Origi.1:! :.; :d S-/
B. D. Lian B. D. Liaw, Chief Materials Engineering Branch Division of Engineering cc:
R. Vollmer D. Eisenhut W. Johnston E. Sullivan S. Pawlicki D. Brinkman D. Hoffman A. Bournia B. D. Liaw C. Cheng W. Hazelton R. Klecker B. Elliot M. Hum DISTRIBUTION:
N MTEB Reading Files MTEB RE-1-1 WNP 2
\\
,N DE;{, TEB,'ni' 3\\
..a w Dif/fb
' DEiMTEB DE:MTEB DE:MTEB B. Ellio't:aj M. Hum C Cneng W. Harelton B. D' Liaw
~
8/23/ 3 8/)y/83 8
0 /83 8/ '. u /83 8/ m ;/83
.