ML20213E572

From kanterella
Jump to navigation Jump to search
Forwards NRR Input to SALP for Aug 1982 - Jul 1983.Overall Rating of Category 2 Assigned
ML20213E572
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/22/1983
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To: Mattson R, Speis T, Vollmer R, Vollner R
Office of Nuclear Reactor Regulation
References
CON-WNP-0641, CON-WNP-641 NUDOCS 8308290537
Download: ML20213E572 (2)


Text

,

AUS 2 2 1983 RAul uc k C.*

MEMORATIDU'1 FOR: Themis P. Speis, Director Division of Safety Technology Roger J. Mattson, Director Division of Systems Integration Richard H. Vollmer, Director Division of Engineering Hugh L. Thompson, Director Division of Human Factors Safety THRU:

A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:

R. Aul uck, Project Manager Licensing Branch No. 2 Division of Licensing

SUBJECT:

NRR INPUT TO SALP - NNP-2 A2tached is a draft of the NRR input for the SALP for Washington Public Power Supply Systen, Project No. 2, for the period August 1,1982 to july 31, 1933. This draft report is based partly upon input solicited from selected staff personnel who have had subs tantial contact and involvement with ilNP-2's licensing activities.

Please review the draft evaluation and provide any comments you feel appropriate.

All comments received by August 2 6, 1983 will be considered in the final report.

C'". : ' a a c R. Auluck, Project Manager i

Licensing Branch No. 2 Division of Licensing l

Attachment:

l As stated l

Y Nb 8308290537 830822 WF ADOCK 03000397 W

w l

.m DLT

...+.Y. 42/BC l

l o".cz :,l..D L :

i PM

m.... i.

.l.

, l,

su m ue)

.I...c,k ;,pt,,

AS'c hwe,n cer, om >l. 8/..t.683.......

8@as,

,,,,,,,,,l.,

.j,

.j.

L 0

.1

.h SYSTEMATIC ASSESSMENT OF LICEhSEE PERFOR".ANCE FACILITY: Washington Public Power Supply System Nuclear Project No. 2 LICENSEE: Washington Public Power Supply System APPRAISAL PERIOD: August 1,1982 through July 31,1983; Cycle 4 FUNCTIONAL AREA:

Licensing Activities PROJECT MA"AGER:

Rajender Auluck Analysis During this appraisal period, the staff was involved, along with the applicant, in resolving the open items related to the issuance of operating license for WNP-2.

During this period three supplements to the WNP-2 Safety Analysis Report were issued.

Advisory Committee on Reactor Safeguard's ( ACRS) sub-committee neeting was held in September 1982 and the full committee met in October 1982.

Washington Public Power Supply System (WPPSS) has demonstrated a high degree of management control and involvement in achieving resolution of licensing issues.

Management involvement v.as particularly evident in addressing the NRC concerns in the emergency planning program and the requirements for the emergency response capability.

The approach of the licensee to the resolution of technical issues from a safety standpoint is technically sound in almost all cases.

This was particularly evident in the auxiliary systems area where the licensee justificd the deviation in resolving the issue of " Tornado-missile protection for diesel generator exhaust."

In. response to NRC initiatives, the licensee provided timely responses with acceptable resolutions.

Delays were experienced in few cases.

Personnel in the key positions of licensing activities are knowledgeable and professional.

During the meetings with the NRC, the applicant has provided the appropriate technical and management level personnel to make the meetings produ:tive.

Conclusions Based on the evaluation for a number of significant licensing activities, an overall rating of Category 2 is given to Washington Public Power Supply System with regard to their project No. 2.

The licensee has been characterized as being knowledgeable, cooperative, technical competent and responsive in the area of licensing activities.

-