ML20213E527
| ML20213E527 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/05/1983 |
| From: | Noonan V Office of Nuclear Reactor Regulation |
| To: | Thomas C Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0625, CON-WNP-625 NUDOCS 8308150102 | |
| Download: ML20213E527 (1) | |
Text
.
Central File EQB Rdg. File AUG 0 51983 MEMORANDUM FOR:
Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing FROM:
Vincent S. Noonan, Chief Equipment Qualification Branch Division of Engineering
SUBJECT:
PROOF AND REVIEW OF WASHINGTON NUCLEAR PROJECT 2 TECHNICAL SPECIFICATIONS Our staff has reviewed the subject Technical Specifications, our preliminary comments were resolved with D. Hoffman of your staff and we are in agreement with the Technical Specifications content in our area of review.
Although our review of the WNP-2 purge and vent valve system has not been completed, the contents of the Technical Specifications in this area are what we would expect to see at the end of our review.
When our review of the purge and vent valves has been completed we will inform D. Hoffman of the results of our review.
,g-g % k W ) 4 Vincent S. Noonan, Chief Equipment Qualification Branch Division of Engineering cc:
G. Bagchi J. Jackson
}
D. Hoffman M
}
9308150102 830805 W
ADOCK 05000397 n
_GP CONTACT-J j
hEk. Jackson,NRR 27930
,/
n0
~ > m.,
t, i
omca t. i...D.E : E,QB,.
..j,BE.:,B_
..DE;
/
sun - o 4.4.a.c.k s.9.n./.w <A B.<i.
h.i.
..ySNjern 8/,.4....... /.83 8/
.. /.8 3..8../.... b...../.8. 3 om>
. ~.....
4
- o
\\
\\
AUG 5 1923 i
Docket Nos. 50-460/397/508/509/513 i
i MEMORANDUM FOR: Robert L. Fonner, Attorney l
Regulations Division OELD l
FROM:
William 0. Miller, Chief License Fee Management Branch, ADM
SUBJECT:
STATUS OF APPLICATIONS BY THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM We are in the process of billing the Washington Public Power Supply System (WPPSS)fortheindefinitepostponementforWNP-4. Since no operating license application was tendered for WNP-5, no fees can be charged for the cancelled Unit No. 5.
We have checked the status for the other three pending applications by WPPSS. As a result of this checking, we find the following to be the status for WNP-1, -2 and -3.
l 1.
WNP-1 and -2 are still undergoing operating license reviews per conver-sations with the assigned Licensing Assistants and Project Managers for these cases. There is no letter on file for cancellation or indef-inite postponement of these cases. Consequently, we have no basis to bill WPPSS at this time.
2.
WPPSS filed an application dated May 25,1982, for an operating license for WHP-3.
By letter dated July 12,1983 (copy attached). WPPSS infomed ONRR that the Executive Board adopted a resolution on July 8 calling for an immediate construction delay until an assured source of funding for I
continued construction can be obtained. This letter also stated that "The Supply System will attempt to preserve the capability for a reason-ably efficient restart during the next 3 to 9 months by retaining the key class 1 contractors," and that they "...will continue to seek to re-move the impediments preventing further financing of WNP-3 in order to resume project construction activities."
Section 170.12(b) on license fees states that "the review of a project is completed when a permit or license is issued, or an application for a permit or license is denied, withdrawn, suspended, or action on the application is postponed. "
acceice
0805 GP ADOCK 05000397 Op 0FF10t >
f SURNAhig h.
7-D ATE b.
a Robert L. Fonner,
AUG 5 1983 Your review of the July 12, 1983 letter from WPPSS for a determination as to whether it constitutes a postponement for billing purposes is requested. We understand that at this point the Division of Licensing is continuing their review of the OL application.
Onginal Signed by'
- h. o. 3nuer William 0. Miller, Chief License Fee Management Branch Office of Administration
Enclosure:
WPPSS Ltr. 7/12/83 cc: w/o encl:
M. Duncan, LB-4 R. Auluck, LB-2 E. Hylton, LB-2 A. Vietti, LB-3 J. Lee, LB-3 DISTRIBUTION w/o encl:
Regulatory Dockets C. J. Holloway, LFMB R. M. Diggs, LFMB l
D. Weiss, LFMB LFMB Reactor Files (5)
LFMB R/F l
l l
f t
oma i e L DM LFMB: DM LFM"B:ADM l
l
~.........
mn3mq. RM iggs:rmf; CJHoll way : WOMiller l
i ourp ! 8/,
/85[8/[785'8/k,/83 '
[
y
,