ML20213E410
ML20213E410 | |
Person / Time | |
---|---|
Site: | Susquehanna, Columbia |
Issue date: | 04/15/1983 |
From: | Perch R Office of Nuclear Reactor Regulation |
To: | Carter J, Case E, Harold Denton Office of Nuclear Reactor Regulation |
References | |
CON-WNP-0584, CON-WNP-584 NUDOCS 8304260010 | |
Download: ML20213E410 (1) | |
Similar Documents at Susquehanna, Columbia | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20202F6101998-07-16016 July 1998 Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted ML20202F6341998-04-16016 April 1998 Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record Encl ML20202F6681998-03-19019 March 1998 Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy ML20202F6751998-03-18018 March 1998 Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant ML20202F6921998-03-18018 March 1998 Requests to Be Informed If Review of Util Audit Will Be in Insp Rept ML20202F7191998-03-0202 March 1998 Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta ML20202G4101998-02-18018 February 1998 Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March ML20202G4871998-02-0505 February 1998 Requests Status of Updating Ltr of Alleger Caller ML20202G5011998-02-0505 February 1998 Requests Status of Updating Ltr Re Alleger Caller ML20202G6291998-01-16016 January 1998 Responds to 980115 Telcon with G Jones & M Urban Re Current Status of PP&L Internal Investigation ML20202G5901998-01-11011 January 1998 Forwards Info Re Diagnostic Plant Control Operator (Pco) Interest in Radiological Waste Control Room Panel Test Computer Point ML20202G6081998-01-0909 January 1998 Forwards Info Re Diagnostic Interest in Radiological Waste Control Room Panel Test Computer Point ML20202G6411998-01-0505 January 1998 Informs That D Vito & C Anderson Will Be Sending Status Ltr to Alleger Caller ML20202G6731997-12-11011 December 1997 Responds to Telcon with G Jones Discussing Delay in Completing Corporate Audit Re Allegation ML20202H1621997-12-0505 December 1997 Partially Deleted Ltr Re Conversation with One of Two Allegers,Informing That Status Ltr Being Work on & Should Be Received by End of Month ML20202G7121997-11-20020 November 1997 Informs That on 971105 NRC Attended Meeting with PP&L Mgt Representative from PP&L Corporate Auditing to Discuss Set of Four Related Issues Involving Operator Performance & Equipment Panel Testing ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20202G8091997-09-19019 September 1997 Forwards Status Rept on 970919 Allegations 97-A-0049 & 97-A-0145 ML20202G8291997-08-21021 August 1997 Informs That Alleger Called in Reference to Topics Contained in RI-97-A-145 ML20202G8571997-07-30030 July 1997 Responds to Monthly Allegation Status Meeting ML20202H1941997-07-17017 July 1997 Partially Deleted Ltr Re Followup Calls on 970624 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20202H2451997-06-25025 June 1997 Partially Deleted Ltr Re Summary of Info Provided by Allegers ML20202H0731997-06-25025 June 1997 Forwards Current PP&L Corporate Auditing Investigation Re Several Ongoing Investigations at SSES Site ML20202H0781997-06-20020 June 1997 Informs That Fewell Spoke to Two Individuals & Conversation Being Documented & Placed on an Allegation Receipt Form ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20136A6811996-11-25025 November 1996 Partially Withheld Memo Re Director Decision 96-18 Re Petition Filed by P Blanch on 940413 ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20059M6601993-11-15015 November 1993 Forwards Revised Task Action Plan for Evaluation of Loss of SFP Cooling Events & Estimate of Staff Resources Required to Complete Action Plan Tasks ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20127B5191990-07-0303 July 1990 Clarifies Region I Ofc View of Allegation RI-89-A-0072, Adjustment of Molded Case Circuit Breakers (MCCB) at Susquehanna ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl 1999-04-14 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20202F6101998-07-16016 July 1998 Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted ML20202F6341998-04-16016 April 1998 Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record Encl ML20202F6681998-03-19019 March 1998 Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy ML20202F6751998-03-18018 March 1998 Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant ML20202F6921998-03-18018 March 1998 Requests to Be Informed If Review of Util Audit Will Be in Insp Rept ML20202F7191998-03-0202 March 1998 Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta ML20202G4101998-02-18018 February 1998 Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March ML20202G4871998-02-0505 February 1998 Requests Status of Updating Ltr of Alleger Caller ML20202G5011998-02-0505 February 1998 Requests Status of Updating Ltr Re Alleger Caller ML20202G6291998-01-16016 January 1998 Responds to 980115 Telcon with G Jones & M Urban Re Current Status of PP&L Internal Investigation ML20202G5901998-01-11011 January 1998 Forwards Info Re Diagnostic Plant Control Operator (Pco) Interest in Radiological Waste Control Room Panel Test Computer Point ML20202G6081998-01-0909 January 1998 Forwards Info Re Diagnostic Interest in Radiological Waste Control Room Panel Test Computer Point ML20202G6411998-01-0505 January 1998 Informs That D Vito & C Anderson Will Be Sending Status Ltr to Alleger Caller ML20202G6731997-12-11011 December 1997 Responds to Telcon with G Jones Discussing Delay in Completing Corporate Audit Re Allegation ML20202H1621997-12-0505 December 1997 Partially Deleted Ltr Re Conversation with One of Two Allegers,Informing That Status Ltr Being Work on & Should Be Received by End of Month ML20202G7121997-11-20020 November 1997 Informs That on 971105 NRC Attended Meeting with PP&L Mgt Representative from PP&L Corporate Auditing to Discuss Set of Four Related Issues Involving Operator Performance & Equipment Panel Testing ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20202G8091997-09-19019 September 1997 Forwards Status Rept on 970919 Allegations 97-A-0049 & 97-A-0145 ML20202G8291997-08-21021 August 1997 Informs That Alleger Called in Reference to Topics Contained in RI-97-A-145 ML20202G8571997-07-30030 July 1997 Responds to Monthly Allegation Status Meeting ML20202H1941997-07-17017 July 1997 Partially Deleted Ltr Re Followup Calls on 970624 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20202H2451997-06-25025 June 1997 Partially Deleted Ltr Re Summary of Info Provided by Allegers ML20202H0731997-06-25025 June 1997 Forwards Current PP&L Corporate Auditing Investigation Re Several Ongoing Investigations at SSES Site ML20202H0781997-06-20020 June 1997 Informs That Fewell Spoke to Two Individuals & Conversation Being Documented & Placed on an Allegation Receipt Form ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20136A6811996-11-25025 November 1996 Partially Withheld Memo Re Director Decision 96-18 Re Petition Filed by P Blanch on 940413 ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20059M6601993-11-15015 November 1993 Forwards Revised Task Action Plan for Evaluation of Loss of SFP Cooling Events & Estimate of Staff Resources Required to Complete Action Plan Tasks ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20127B5191990-07-0303 July 1990 Clarifies Region I Ofc View of Allegation RI-89-A-0072, Adjustment of Molded Case Circuit Breakers (MCCB) at Susquehanna ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl 1999-04-14 |
Text
'
- C W r',u i
(,CAu--.>kods 2 3 (L'l April 15,1983 MEMORARDUM FOR: H. R. Denton, NRR E. G. Case, NRR J. Carter, NRR
~
D. Eisenhut, DL H. Thompson, DHFS R. Vollmer, DE R. Mattson, DSI T. Speis, DST J. Sniezek, IE T. Ippolito, ORAB T. Novak, DL G. Lainas, DL F. Miraglia, DL -
THRU: A. Schwenter, Chief Licensing Branch No. 2, DL FROM: R. L. Perch, Project Manager ~
Licensing Branch No. 2, DL . .
SUBJECT:
DAILY HIGHLIGHT - EXEMPTION TO REQUIREMENTS OF APPENDIX J
' 0F 10CFR50 FOR SUSQijEHANNA STEAM ELECTRIC STATION, UNIT 1 On April 14, 1983, Amendment No.13 to Facility Operating Licensing No. NPF-14, Susquehanna Steam Electric Station, Unit 1 was issued. The amendment provides an exemption from the requirements of Appendix J of 10CFR50 for the first fuel cycle when performing-local leak rate testing of Residual Heat Removal (RHR) relief valves in accordance with Technical Specification 4.6.1.2. of the Susquehanna license.
l l ,
(2tPA R. L. Perch, Project Manager Lice 9 sing Branch No. 2, DL y
1p 426001 830415
.A n nt' R 5000397 ,.
y
. - _ _ _ _ _ _ - _ _ _ _ _ _