Submits Status Rept & Accepted Resolution of Crosby Safety/ Relief Solenoid Valve Concern,Reported Per Part 21 on 810812.Plants Affected by Solenoid & Seal Replacement Program ListedML20213E316 |
Person / Time |
---|
Site: |
Susquehanna, Columbia, River Bend, LaSalle, 05000000, Zimmer, Hartsville |
---|
Issue date: |
12/30/1982 |
---|
From: |
Baer R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
---|
To: |
Crews J, Gagliardo J, Robert Lewis, Spessard R, Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
References |
---|
CON-WNP-0561, CON-WNP-561 NUDOCS 8302020363 |
Download: ML20213E316 (7) |
|
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20217M5311999-10-25025 October 1999 Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20202F6101998-07-16016 July 1998 Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20202F6341998-04-16016 April 1998 Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record Encl ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20202F6681998-03-19019 March 1998 Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy ML20202F6751998-03-18018 March 1998 Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant ML20202F6921998-03-18018 March 1998 Requests to Be Informed If Review of Util Audit Will Be in Insp Rept ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20202F7191998-03-0202 March 1998 Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta ML20202G4101998-02-18018 February 1998 Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March ML20202G5011998-02-0505 February 1998 Requests Status of Updating Ltr Re Alleger Caller 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20217M5311999-10-25025 October 1999 Notification of 991103 Meeting with Util in Rockville,Md to Discuss Licensee Analytical Approach in Design of Pipe Supports at Plant ML20217C9051999-10-12012 October 1999 Forwards SER Input Approving License Request for Amend to Plant,Units 1 & 2.Licensee Proposal to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20237D9821998-08-11011 August 1998 Notification of Licensee Meeting W/Util on 980915 to Discuss Status of LaSalle Unit 1 & Performance Improvement & Restart Plans for LaSalle Unit 2 ML20237D9751998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20237D9721998-08-11011 August 1998 Notification of Cancelled Licensee Meeting W/Util on 980903 to Discuss Effectiveness of Performance Improvement Initiatives & Progress Toward LaSalle Unit 1 Restart ML20202F6101998-07-16016 July 1998 Discusses Green Package Containing,In Part Corp Auditing Rept Numbers 739459-97,dtd 971015,redacted , 739459-1-97,dtd 971201,redacted & 739459-2-98, ,redacted ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20202F6341998-04-16016 April 1998 Forwards Info from Very Vocal Alleger Caller Re RI-97-A-0145 Ltr.Allegation Disposition Record Encl ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20202F6681998-03-19019 March 1998 Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy ML20202F6751998-03-18018 March 1998 Forwards Reply to RI-98-A-0007,RI-97-A-0145 & RI-97-A-0282 Re Plant ML20202F6921998-03-18018 March 1998 Requests to Be Informed If Review of Util Audit Will Be in Insp Rept ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20202F7191998-03-0202 March 1998 Forwards Drafts to Be Used Before Replacing Originals Re SSES A-145 Colta ML20202G4101998-02-18018 February 1998 Informs Alleger Caller That Info Requested Will Be Incorporated Into Next Insp Rept & Should Be Received by mid-March ML20202G5011998-02-0505 February 1998 Requests Status of Updating Ltr Re Alleger Caller 1999-09-01
[Table view] |
Text
.' 'o UNITED STATES
, ,, . c NUCLEAR REGULATORY COMMISSION n IN f
[
- J-- .C WASHINGTON, D. C. 20555 -
9 / p, A , j7NF l g .,- ( p .r1 O
,_ L, 7EPF,05 14 0 i
' /'" OESTP l I DEC 3 01982 .t ML
/ ,.
at FILE lhh' (g hJ ,g (
MEMDRANDUM FOR: R. W. Starostecki, Director,l ivisicn of Project &
Resident Progrcms, RI R. C. Lewis, Director, Division of Project & Resident Programs, RII p .'L. Spessard. Director, Division of Project & Resident Programs, RIII '
J. E. Gagliardo, Acting Director, Resident, Reactor Project & Engineering Programs, RIV J. L. Crews, Director, Resident, Reactor Project &
Engineering Programs, RV FROM: R. L. Baer, Chief, Engineering and Technical Support Branch,DEQA,IE
SUBJECT:
STATUS REPORT AND ACCEPTED RESOLUTION OF CROSBY SAFETY / RELIEF SOLEN 0ID VALVES On August 12, 1981, General Electric reported under 10 CFR Part'21 a concern pertaining to the subject valves. Wyle Laboratories discovered during an environmental qualification test that the valves were unable to actuate with the minimum available DC voltage during a postulated loss-of-coolant accident.
Furthermore, GE discovered in CROSBY'S Model CVG-D1, solenoid gasket material will allow steam leakage into the electrical components. This memorandum is to inform you that NRR and IE have completed their review of the proposed vendor action on the subject valves.
The NRR Environmental Qualification Branch and the IE Division of Engineering and Quality Assurance have reviewed the folicwing documents pertaining to the subject valves:
- 1. Crosby - test procedures -
- 2. Crosby - test plan for enviror. mental qualification
- 3. Crosby - qualification test report and test data 4 Crosby - quality assurance plan
- 5. Crosby - test procedure for the production assembly and testing
- 6. General Electric Field Disposition Instructions (copy enclosed).
The corrective action proposed by General Electric snd Crosby includes:
(1) replacing the existing solenoids with new ones that have a lower pickup voltage, CONTACT: Wolfgang Laudan, IE C 9 8302020363 821230 6 ADOCK 05000397 g jCJB3 3d
Multiple Addressees' DEC 3 0 gogg (2) replacing the BUNA N gaskets with.VITON E, and (3) using potting compound in the solenoid coil cavity and access routes to obtain a good moisture seal. This is acceptable to hRR and IE (see enclosed memo from V. Noonan to R. Baer, dated December 10,1982).
The following nuclear plants were identified by General Electric as being i affected by the solenoid and seal replacement program:
Hanford 2 ,- Zimmer 1 Susquehanna 1 & 2 -
Hartsville
- ;j LaSalle 1 & 2 River Bend 1 This closes Part 21 No. 81-486-000 8/12/81.
! $. W Robert L. Baer, Chief Engineering and Technical Support Branch Division of Engineering and Quality Assurance Office of Inspection and Enforcement
Enclosures:
- 1. GE Field Disposition Instruction 138-57434
- 2. - herr.o Noonan to Baer dated 12/10/82
, cc: R. DeYoung, IE I J. Sniezek, IE J. Taylor, IE l U. Potapovs, RIV l V. Noonan, NRR l
l l
l 4
Enclosure 1
- .7)Cdd -
E/.i-rf?aY -- sw g ~
kg*p.Sh- FD1No.
[hQ '
C. "" fl 5,q
.w- - '. REVISION O l
{ ELD DisPoslTION INSTRUCTION M, SHEET 1
OF f DATE OF ISSUE pre >E:T 1.a Sall e UNIT issued SY PD & RO EDU3PMEVT MSS SRV IMF-2 SOLENOID PILOT ASSY (CROSBY) DATE N~M~D 8 ECN/lR/DDR/F DDR
,;,t ya B21-F013 g4y DESCRIPTION OF TASK
- 1. PURPOSE The Crcsby Sdef f Rehe! Vekelm)Y solenoid IMF-2 is to be installed on all 18 SRVs (54 total solenoids). Crosby will supply field service personnel to supervise installation - ref. MR #YC593 Rev. O.
- 2. REOUIRED DOCUMENTS Hone. Crosby field service will deliver the GE approved Installation Instructions,
- 3. All IMF-2 equipment is pre-shipped to Site. "0" rings and lubricant will be hand carried by Field Service Rep. .
Procedure is contained in 2 above. G.E. QC to observe at least on an audit basis. The removed solenoidsare to be kept by Site or returned to G.E. San Jose.
APPRDVALS DATE APPRDVALS DATE Twis Louiput.wt is sarcTv stuvro gets O~
Q4 ggg sarrTv eumcTion es AFFtcTro Ovts E* j
'/ ~/ s FIELD WORK ORDER NO. j gQ,g'o,",",ET 3 - g, Au _ lL- ygs g No Q sr L
\
N/
OtSTRIBUTION CODE TDI TASK COMPLETED DATE ti - En , INTERNAL EXTERNAL
? M SEQU^i'CO**"O' l
l
/E /L _ /_
~
_-*>er-um v a -4 4 /_ _ _ . __ _ _ _
J V A LV E a GAGE CO M P A N Y r- CR O S BY C FT O S 8 Y J wRENTHAW, M A S S.
t^
( ENGINEERING PROCEDURE TITLE: INSTALLATION INSTRUCTION for Crosby IMF-2 Solenoid Pilot Valves.
G EN ER AL h ELECTRIC NUCLEAR ENERGY SUSINESE GROUP
- % vbWYL DATE p(ROVEDc b //Y /- /
VPF NO.
2Oh$N TR ANSMITTAL NO.
PRINTS TO I
1-W..n.
d Greenlaw s&f 4/21/82
- ....- . APPROVAL-OIRECTOR OF ENGINEERING DATE CROSBY VALVE 8 GAGE COMPANY D AT E -
N AM E TITLE SIGgTUR E April 21, 1982 PREPARED BY D. olmsted s Proj.
L. Thompson Prin. Engineer ]gj April 21, 1982 APPROVED BY QA Manager April 21, 1982 J. J. Greene APPROVED BY APPROVED BY ,
I-11116 0
( '
~
,1 ~ . PROCEDURE N O.l REV.
_7' ' {. [? .2 I SHEET NO. OF '
5 e, . J
/~ CROSBY V A LV E B GAGE COMPANY CF10SBY j wRENTHAW , MASS T
Scope j This procedure is to be followed for all field installations of Crosby IMF-2 Sole-noid Pilot Valves manufactured to QAP-3325 on the Crosby HB Dual Function Safety Ralief Valve Actuators.
1
- 2. Reference l i
2.1 Crosby Quality Assurance Plan QAP-3325.
2.2 Crosby Data Sheet DS-A-63790, Sheet 4 of 4.
2.3 Crosby Data Sheet DS-C-66181.
- 3. Handling and Cleaning 3.1 The pilots should remain in the protective plastic bag until ready for instal-lation. Particular care should be exercised to avoid damage to the "0"-Ring scaling surface ("0"-Ring No's 10 and 23 on DS-A-63790).
3.2 Af ter removal from the plastic bag, the sealing surface should be wiped clean with a soft, lint free cloth, using Isopropyl alchohol if necessary. Care must be taken to avoid any contamination of the pilot pneumatic feed holes on the scaling surface or the pilot vent hole in the top cover (Pc. No. 9 on DS-C-66181).
(
3.3 The protective plastic cap on the connector (Pc. No. 36 on DS-A-63790) should remain in place until the cable end connector is installed.
- 4. Removal of Existine Pilots 4.1 Bend down cl.c tabs on all pilot mounting screw locktabs (No. 14 on DS-A-63790, four (4) per pilot) until flat on the pilot bach surface.
4.2 Remove the four (4) mounting screws (Pc. No. 40 on DS-A-63790) and locktabs while holding the pilot in place.
4.3 Remove the pilot from the main valve by first sliding sideways to ensure that the two (2) "0"-Rings rer.ain in place and then pulling straight out.
4.4 Remove, clean and inspect the "O"-Rings for reuse. If the "0"-Rings are damaged or have taken a permanent set, they cust be replaced.
4.5 Inspect and wipe clean if necessary, the main valve "0"-Ring seating surfaces.
I-11116 0
\
PROCEDURE NO. l REN.
2 SHEET OF
> 1
. _. -. J ?
I CROSBY V A LV E B GAGE COMPANY CF10SBY j wRENTHAM , MAS $
I Renoval of Existing Pilots (Continued) 4.5 (Continued)
CAUTION l Ns DO NOT PUSH ON THE PISTON POPPET (PC. 19 ON DS-A-63790) s 4.6 Insert and clean the counting screws and locktabs.
I
- 5. Installation of New Pilots l
5.1 Lightly lubricate the two (2) "0"-Rings with Parker Super-0-Lube and position l them on the mair. valve cartridge essembly. Wipe off any excess 0-Lube. i 5.2 Lightly lubricate the mounting screw threads with "Never-Seec" and place the screws and locktab washers in the four (4) mounting holes in the IMF-2 Pilot.
The locktabs should have the long tab preber.t to fit the edge of the pilot as ,
l shown on DS-A-63790.
5.3 Place the pilot onto the main valve so that the screws are aligned, and hand tighten all four (4) screws. Care must be taken to avoid excess side to side slippage or separation of the sealing surfaces to ensure the the "O"-Rings re-main properly positioned.
( 5.4 Torque the mounting screws to 120 inch-pounds using standard torquing tech-niques.
5.5 Bend up one (1) tab of each locktab washer until flush with one (1) flat on the hex head mounting screw, taking care not to damage the aluminum pilot block surface.
- 6. Records A record shall be made by the installing personnel of the IMF-2 serial numbers and the actuator and valve serial number upon which each pilot is installed and this record shall be included in the Field Service Report.
1 l
l 1
I 1-11116 0
\ '
PROCEDURE NO. REV.
3 SHEET OF
.., s
\
~~
_J (
CROSBY V A LV E & GAGE CO M P A N Y
' "* F3Yy WRENTHAM, MASS
[ , , ,g D ATE R E ASON FOR REVISION CUSTOMER APPROVAL 4/21/82
/ I-11116 0
(
PROCEDURE NO.l REY.
I- 4 SHEET OF