ML20213E219
| ML20213E219 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/27/1982 |
| From: | Rubenstein L Office of Nuclear Reactor Regulation |
| To: | Purple R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0532, CON-WNP-532, CON-WNP-5321 NUDOCS 8208060114 | |
| Download: ML20213E219 (3) | |
Text
.
\\
JUL a 7133%
I:E!' ORA!.'DLU FOR:
R. Purple, Acting Assistant Director for Licensing Division of Licensing FP.Ct':
L. S. Pubenstein, Assistant Director for Core and Plant Systens Division of Systens Integration
SUBJECT:
PEQUEST FOR IrlF0PJtATI0!f Plant Iane:
til!P-2 Docket f?unher:
50-307 Licensing Stage:
Operating License Responsible Branch:
Licensing Branch lio. 2 Project l'.anager:
R. Auluck PSI Revieu Branch:
Core Performance Branch Please request that the applicant provide infomation on neasures that uill be adopted to avoid fuel rod waterside corrosion danane.
A suitable request is provided in the enclosure.
This infomation will be used to provide a revised description of the issue in the SSEP..
T Original signed L. S. Rubens @ %.
A L. S. Rubenstein, Assistant Director for Core and Plant Systens Division of Systens Integration
Enclosure:
As stated DISTRIBUTION:
cc-R. t'attson D. Eisenhut A. Schwencer CPB Rdg.,
R. Auluck LRubenstein CBerlinger R. Meyer M. Tokar
Contact:
R. Ueyer
/p
~
N X-29475 N
82080601.14 820727
)'
N GE-_AROCK OSOOO39Ly
-ec
~
- SEE PREVIOUS CONCURREriCE omec p
..D.s I..:.C P.B..
. 0s.I..:.W..
0.SJ.:.cs......n.td P.S
- RMeyer
- MTokar
- CBerlinge
....L....... '.. t e i n..........n....~.
r SURNAMEh
....=...n.....
a..
on.*a.a a..
...... / 2.%
7......~.8...............~.
/..
omny
........... ~.....
- - - _ _ _. ~.
-o.
JUL 2 71981 ENCLOSURE Request for Information on Fuel Rod Corrosion Measures In looking back at Chapter 4 of NUREG-0892 (the WNP-2 SER), we note that Section 4.2.3.1 (4) addresses the issue of waterside corrosion.
Although we do not understand the exact damage mechanism, we do understand that General Electric has a task force studying this problem and that you will meet with General Electric this summer to determine suitable preventive actions. After that meeting, please inform us of the measures that you will adopt to avoid fuel rod waterside corrosion damage in WNP-2. We would like to have this information prior to publication of the Supplement to ?!UREG-0892, which is now scheduled for October 22, 1982.
l 6
(
e lief!0RAl:Dlf' F0P.:
R. L. Tedesco
\\
FR0f::
Lester S. Rubenstein, Assistant Director for Core and Plant Systens
/
Divisonsof Systens Integration
.e
\\
/
SUCJECT:
PE00EST FOR If!F0Pl!ATI0f
/
\\
Plant ?!ame:
UtiPM
[
Docket thrnber:
50-397
/
Licensing Sta0e:
Operating License /
Pesponsible Granch:
LicensingBranchfo.2 ProjectI: anger:
R. Auluck DSI Devieu Branch:
Core Perfort.1ance Dranch
/
/
f.
Please request that the applicant provide infomation on neasures that will be adopted to avoid fuel rodmaterside corrosion danage.
A suitable question is provided in the enclosure. This infomation will be used to provide a revised description of the issue in the SSER.
/
/
\\
/
\\
/
\\
/
Lester$. Rubenstein, Assistant Pirector
/
for Core and Plant Systens Division'of Systens Integration
Enclosure:
/
\\
Di s tribu tion.
As stated
,/
Central Filef
/
CPB Reading
\\
cc:
Roger J.14ttion LRubenstein CBerlinger MTokar RMeyer-f.
.-(
i omce >
..C PB ;DS..
,,C.PB ;,0,S.[,f.,;.
,,C PJ
,,,,,qs ps I,,,,,,
Meyer MTo kar
.. L.R. u..b..e..n. s..t..e..i..n.
sunsac >
....,......f
..?(.1.?t!.......2,b..q/.z.s L..
.2.W &
om>
-.