ML20213E145

From kanterella
Jump to navigation Jump to search
Forwards Proposed Agenda for Multiplexer Design Review Meeting to Discuss Open Item Re Standby Svc Water Sys Reported in SER Section 7.3.2.4
ML20213E145
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/1982
From: Rosa F
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
CON-WNP-0510, CON-WNP-510 NUDOCS 8205200323
Download: ML20213E145 (2)


Text

. .: -- .s

!ockeh LnIcarn 02Ionu.L MAY 0 61962 50 -F9 Certified 27,. s

-}'a7 MEMORAt!DUM FOR: Albert Schwencer, Chief, Licensing Branch #2 Division of Licensing FROM: Faust Rosa, Chief, Instrumentation a Control Systems Branch Division of Systems Integration

SUBJECT:

WNP MULTIPLEXER DESIGN REVIEW MEETING AGEf!DA Plant flame: WNP-2 f r%

Docket No.: 50-397 ,, 7 f*mc?N Licensing Stage: OL ,

'/ .-

' ' q; \

~

Responsible Branch: LB #2 ,

Project !!anager: R. Auluck -

ICSB Peviewer: J. Rosenthal 'S Review Branch: ICSB  :~1 Review Status: SSER - 2 ,'

~

Attached is the proposed agenda for the forthcor '.ig multi Texer disis' review meeting. This meeting will address the ;;en itemmported Section 7.3.2.4 of the WNP-2 SER, Standby Ser'.' .e Water System.

cri -in:a Ir.c re s .. o ~

Faust Rosa, Chief Instrumentation & Control Systems Branch Division of Systems Integration cc: T. Speis T. Dunning DISTRIBUTION:

C. Rossi Docket File f J. Joyce ICSB Reading File l G. Gunes J. Rosenthal (PF) i F. Rosa WNP-2 Subject File

Contact:

J. Rosenthal, ICSB X29459 ~

y/f' x .

8205200323 820506 7

~ger --- ADOCKy0 e - -

i l

crnce , ICSB/gl CS.B/DI. .

I

.{. j.

su,scoty JRos/hthal.:!ct CERos.si.

,1, .ICSB/Dg(qFRosa.,,,h,,,, J. . .

51..$, .182 !-

. 5l. .f . . B.R . . . 51. .f 182.

4' *i ' '

l NRC FORM 318 (10-801 NRCM 0240 OFFICIAL RECORD COPY.

f,,... . -

.~

AGENDA - REMOTE MULTIPLEXING SYSTEM APPLICATION TO WNP-2 (1) Provide a complete list of components (pumps, valves) whose actuation, interlock, or status indication is dependent on the proper operation of each 1-E multiplexer.

(2) For the components cited above, describe means of remote or local control (other than cutting wires or jumpering) which may be employed should the multiplexer fail.

(3) Describe the multiplexer pre-operational test program.

(4) Describe test and/or hardware features employed to demonstrate fault tolerance to electro-magnetic interference.

(5) Describe interconnection, if any, of the 1-E multiplexer to non-lE devices such as the plant computer.

(6) Describe on-line test and/or diagnostic features which may be employed including operator alarms / indicators and their location (7) Describe the multiplexer power source (s).

(8) Describe the dynamic response to momentary interruption of A/C power.

(9) Describe the applicability of the current proposed plant technical specifications to the 1-E multiplexers.

(101 Describe hardware architecture of the unit field multiplexer, central control unit, and control room multiplexer.

(11) Describe firmware architecture.

. - - . - - - ~ . . - - - --

.J