ML20213E084
| ML20213E084 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/11/1982 |
| From: | Johnston W Office of Nuclear Reactor Regulation |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0489, CON-WNP-489 NUDOCS 8203220499 | |
| Download: ML20213E084 (1) | |
Text
4
- 7 r
v y~
/
-?
o
- .s MAR 1 1 1962 DISTRIBUTION
WNP-2 File Docket flo. 50-397
%\\
g os N."
MEMORANDUM FOR: Robert L. Tedesco, Assistant Director Of m Q..tD for Licensing g
Division of Licensing d,a ep,,,;,7/ggghZ
~<aif'?r..%
e 11 FROM:
William V. Johnston, Assistant Director ccN 5 Materials & Qualifications Engineering N
Division of Engineering
- /hl M* p h l y
SUBJECT:
GDC 51 COMPLIANCE: WASHItlGTON PUBLIC POWER SUPPLY; WASHINGTON NUCLEAR PROJECT fl0. 2 Plant flame: Washington Nuclear Project tio. 2 Suppliers: General Electric; Burns & Roe Licensing Stage: OL Responsible Branch & Project Manager: LB #2; R. Auluck Reviewer:
J. Halapatz Completion Date: Open Description of Task: Draft SER Input: GDC 51 Compliance Review Status:
Inactive The memorandum, Noonan to Tedesco, dated March 28, 1981, subject: "GDC 51 Compliance: Washington Public Power Supply (WPPS) Nuclear Project 2,"
identified information required by MTEB to assess the compliance of the l
materials of the containment pressure boundary of the Washington Nuclear Project No. 2 with the requirements of GDC 51.
l Because this information has not yet been made available to MTEB, our i
review is currently in an inactive status.
u/ & 4 William V. Johnston trector 8203220499 820311 liaterials & Qualifications Engineering W
ADOCK 05000397 45 Division of Engineering cc:
R. Vollmer D. Eisenhut A. Schwencer W. Hazelton C. Cheng R. Auluck l
J. Halapatz
Contact:
J.gHalapatz gyg g
,.f(f..--
r EB jD
.EB DE:A E
o-DE:MTEB v
l l
r I t mcWJHalapatz:aj. Wk zelton
- ton, WJohn on 'j-i i
i ingBC i
"M 3/d /82;
- 36)/82 3M182 j.3/P/82
, l, l
u, C N.O s
..e..
c, 7;c,4;,g7;cg; 3;py v:. :_3u