ML20213D436

From kanterella
Jump to navigation Jump to search
Responds to 801120 Request to Review Applicant 800819 Submittal Re Rationale for Leaving Defects in Sacrificial Shield Wall.Plan Is Acceptable
ML20213D436
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/10/1980
From: Schauer F
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
CON-WNP-0319, CON-WNP-319, CON-WPN-319, FOIA-81-223 NUDOCS 8012240106
Download: ML20213D436 (1)


Text

r Sb -5A1

{

DISTRIBUTION Central File NRR Redg. Fi.le i

SEB'Redg. Flile j

F. Schauer.)

l D. Jeng il MEMORANDUM FOR: Billy J. Youngblood, Chief S. Chan 8

E Licensing Branch No.1

,t Division of Licensing c

q

~

p

?;

r y

i i

FROM:

, Franz P. Schauer, Chief ro

.e Structural Engineering Branch Division of Engineering l

SUBJ ECT:

REVIEW OF WNP-2 SACRIFICIAL SHIELD WALL 1

As per your request of November 20, 1980, the Structural Engineering 's l

Branch has reviewed the portion of the reference material (Applicant August 19, 1980 submittal of a section discussing the rationale for i

leaving existing known defects in the sacrificial shield wall) that concerns the structural aspects of the SSW corrective action plan.

We find that the same reference, included as part of Reference 2 of the memo from Knight to Tedesco, dated November 4,1980, has previously been reviewed by us and as a result of this review, we suggested that the proposed corrective action plan for the SSW be accepted. As long as the applicant commits to, the corrective action plan we do not have further coments.

I Franz P. Schauer, Chief Structural Engineering Branch Division of Engineering l

cc:

J. Knight R. Tedesco D. Jeng M. Lynch S. Chan CONTACT: S. P. Chan, x29460 l

t i

l l

l i

G012240/CGXA g

kl l

Orricc).DE,: S EB.

DE:SEB,,

0E;SEBf,b sunNwc k.SChap tash, ~..DJeng hc

,,F,S;h au e r j

..a /86 12/[/8 12/ /80 l

12/

l

,,, g N C FORM 318 (9 76) NRcM 0240 DU S. GOVE ANMENT pntNTING OFFl@ce 1979-289 369 t