ML20213D105

From kanterella
Jump to navigation Jump to search
Notification of 800206 Meeting W/Util to Discuss Problems Re Const of Sacrificial Shield.Shield Is No Longer Cylindrical & Is of Questionable Structural Quality.Util Is Proposing Higher than Normal Temps to Compensate
ML20213D105
Person / Time
Site: Columbia 
Issue date: 02/04/1980
From: Knight J
Office of Nuclear Reactor Regulation
To: Pawlicki S, Schauer F
Office of Nuclear Reactor Regulation
References
CON-WNP-0290, CON-WNP-290, FOIA-81-223 NUDOCS 8002270427
Download: ML20213D105 (1)


Text

__

b. YUak L,J.w D.Y I.iYY FEB 4 1930 r)~ Y NOTE TO:

F. Schauer, Chief, Structural Engineering Branch, DSS

5. Pawlicki, Chief, Materials Engineering Branch, DSS FROM:

J. P. Knight, Assistant Director for Engineering, DSS

SUBJECT:

WPS-2 Jim Henderson called me today to ask that, if at all possible, a representative from the Structural and Materials Branch attend a meeting with the WPS-2 applicant on Wednesday, February 6, at 9:00 a.m. in the licensing hearing board room on the 5th. floor, B/W Towers.

The applican' has had so many The background for the meeting follows:

t problems constructing the sacrificial shield that I & E has talked them into stopping work. Jim Henderson fears that the proposed fixes will result in sufficient changes to characterize an unreviewed safety problem.

It seems that the shield is no longer cylindrical and in addition to being distorted is of questionable structural quality.

In addition there are large A-36 structural elements with what Jim describes as pretty high NDTT: the I

applicant is apparently proposing some scheme for maintaining higher than l

nomal temperature to compensate.

As always in these situations, there will be heavy pressure to review the proposed fixes so that the applicant can continue construction. This kind of problem deserves our best shot to define the scope of the effort i

necessary for a competent review. Please let me know if you can not cover the meeting with a staff member of sufficient seniority to speak for the branch and following the meeting please give me your assessment of the matter and an estimate of the review effort needed, if you detemine that step to be necessary.

t r

ori ginal S1;;ned By:

ma. wem J. P. Knight, Assistant Director for Engineering Division of Systems Safety cc:

F. Schroeder DISTRIBUTICN:

J. Henderson Docket File R. Bosnak NRR Rdg. File R. Jackson DSS:AD/

'k

/

00227y7 X4 M. Lynch l{ van E

?AD W Ovvice >.

suRNRMe)..J P Kn, ', g,ht :j n oATE > 22.f. 81, N3C FORM 388 (9 76) NRCM O240 DU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369