Discusses Facility Confirmatory Piping Analysis Program. Program Will Verify That Applicant Has Correctly Modeled Piping,Used Computer Codes & Accounted for Piping as-built Condition.Request Addl Info from Applicant
ML20213D092
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/31/1979
From: Bosnak R
Office of Nuclear Reactor Regulation
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
CON-WNP-0289, CON-WNP-289 NUDOCS 8001290280
Download: ML20213D092 (2)


Text

. _.

1 m

~

kRhk l59. File - M. Groff DEC 01 DSS:MEB Rdg. File MEMORANDUM FOR:

L. S. Rubenstein, Acting Chief Light Water Reactors Branch #4, DPH FROM:

R. J. Bosnak, Chief Mechanical Engir.eering Branch, DSS

SUBJECT:

MEB CONFIRMATOR'I PIPING ANALYSIS FOR WPPSS NUCLEAR PROJECT NO. 2 MEB has recently instituted a pr) gram of performing an independent confima-tory piping analysis for each plint undergoing OL review. For WNP-2 this analysis will be performed )y our contract personnel at the Energy Technology Engineering Center (ETEC). The purpose of this independent analysis will be to verify that the subject piping system meets the applicable ASME Code stress criteria. We do not intend to resolve i

differences between our calculated stresses and those of the applicant unless unusually large discrepancies are found, or unless Code criteria are not met.

This program will allow MEB to verify on a sampling basis that the applicant has correctly modeled its piping, has correctly used its computer codes, and has adequately accounted for the piping's as-built conditicn.

In order to proceed with our analysis, we will require certain information to be supplied by the applicant. Upon receipt of this infomation, ETEC will evaluate it to determine if additional infomation or clarification is required. Following the initial review we hope to schedule a site visit to acquaint the ETEC personnel with the plant and more specifically the piping system under review. At that time we can discuss the piping analysis with the applicant's design engineers and obtain any additional information required.

Therefore for the 10" MS(18)-2 SRV Otscharge line starting at the MS-RV-1 A Relief valve as shown on WPPSS FSAR figure 3.2-2, the applicant should 1

transmit the following information to ETEC:

Contact:

A. J. Cappucci, DSS:MEB, X27538/72 e

.O goo'

,.__.,.___7

.,_._______,.4,

,.,,.m..

2-DEC 311979 L. S. Rubenstein a

1.

piping layout and isometric drawings sufficient to nodel the systen 2.

support drawings with support and hanger spring rates 3.

the piping design specification 4.

valve weights and CG's 5.

appropriate response spectra 6.

appropriate anchor point movements 7.

any design change notices not yet incorporated into the piping or support drawings (Later DCN's should be forwarded as received).

Send.the above information to:

Mr. L. J. Auge, Manager Facilflty Design Engineering Energy Technology Engineering Center P. O. Box 1449 Canoga Park, CA. 91304 As our analysis proceeds, we will also require the applicant to provide certain of its analytical results for comparative purposes, such as the ASME Code required Design Reports.

Please forward this request to the applicant. We do not expect this issue to delay our input to the Safety Evaluation Report and will include our conclusions in a supplement.

R. J. Bosnak, Chief Mechanical Engineering Branch Division of Systems Safety cc:

R. Mattson, DSS J. Knight, DSS S. Varga, DPM J. Stolz, DPM -

R. Baer DPM

0. Parr, DPM M. Lynch, UsM F. Cherny, MS H. Brammer, DSS MEB Menbers L. J. Auge, ETEC D. Vassallo, DPM W. Pike, HPA A. J. Cappucci, DSS Omcc). kh DSS:

DSS:ME g g

suRNauc). AJCappucc.i.:Jh.HLBramm.er.

..RJBos n.a k oarc >..12/31/79..

.126f. /.79 12/J[/79X NRC FORM 318 f9 761 NRCV 0240 DRS GOVE RN"EN[opsN RING OFFICEt 1979-249469

~

,'3,,3

/

0, UNITED STATES y

g NUCLEAR REGULATCRY COMMISSION E

WASHINGTo rJ. D. C. 20555

,e January 3,1980 Docket No.: p MEMORANDUM FOR:

L. S. Rubenstein, Acting Chief, Light Water Reactors d Branch No. 4, DPM FROM:

M. D. Lynch, Project Manager, Light Water Reactors Branch No. 4, DPM

SUBJECT:

FORTHCOMING MEETING WITH WPPSS TO DISCUSS NRC VIEWS ON QA/QC INSPECTORS Date & Time:

Friday, January 4, 1980 1:00 p.m.

Location:

Room P-3200, Phillips Building, Bethesda, Md.

Purpose:

The meeting was called at the request of WPPSS to discuss the NRC's views on the inclusion of QC inspectors in the union of the craftsmen whose work is being inspected. Based on this discussion, WPPSS will then decide whether to file a brief in a pending NLRB case.

Participants:

NRC WPPSS M. D. Lynch G. Sorenson W. Haass A. Sastri J. Gilray M. Witherspoon W. Paton, Esq.

D. Rooney, Esq.

7 g

M. d. Lynch W 5 ject Manager Light Water Reactors Branch No. 4 Division of Project Management cc: See next page.

l c,-

,,, i u v v-(

m.

f

/",

+

Washington Public Domr Supply System ccs:

Joseph B. Knotts, Jr., Esq.

Mr. Neil 0. Strand Debevoise & Liberman Washington Public Power Supply Systc.a 1200 Seventeenth Street, N. W.

P. O. Box 968 Washington, D. C. 20036 Richland, Washington 99352 Richard Q. Quigley, Esq.

Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Nicholas Lewis, Chainnan Energy Facility Site Evaluation Council 820 East Fifth Avenue Olynpia, Washington 98504 Mr. O. X. Earle Licensing Engineer P. O. Box 968 Richland, Washington 99352 I

(

f

~

REGE.AT0iiY DBd?lTd.E C

/

February 1, 1980 I

Docket lio. 50-397 g

HE110RAliDUM FOR:

G. W. Reinmuth, Assistant Director, Division of Reactor Construction Inspection, IE FR0t1:

James B. Henderson, Division of Reactor Construction Inspection, IE

SUBJECT:

FORTHCOMING MEETIt'G WITH UPPSS Data and Time:

Wednesday, February G, 1930 9:00 a.m.

Location:

Hearing Room, 5th Floor E/W Towers Bethesda, Maryland

Purpose:

To discuss. WPPSS proposed corrective actions on nonconformances t

in construction of " sacrificial shield," for WPPSS Ho. 2, quality problems with pipe whip restraints, and flDTT for certain structural elements.

Participants:

HPPSS f

R. Foley, et. al.

l flRC I

l L. Rubenstein, D. Lynch, T. Bishop, J. Henderson, R. Shewmaker, et. al.

4

~

James 8. Henderson Division of Reactor Construction Inspection IE e

l1)JJ

L

. fa L J 34r&52 r y, Y Y '

'd 1

'a >

..RC I:.IE..........

evanaies >

..JBHenderson..

n avi*. 2/1180:.fn....

Nac romu 31s (9 76) NROd 0244

  • u o. **vaaamear 'amvme *,, ice i a e re no e. v e e

l

1EETI!iG fiOTICE DISTRIBUTI0ti i

Docket Files I

hRC PDR I

Local POR H0enton ECase DEisenhut WGannill BGrimes RVollmer l

LShao J1111er l

TIppolito l

RReid i

Vtioonan i

GKnighton DZiemann ASchgencer 03 avis PCheck l

Glainas RClark FPagano IIHaller l

OELD OSD(3)

CThayer ACRS (16) flRC Participants SSheppard i

Project Manager TERA I

i i

vnc = >

WE88 AE88 M nata k M FORM 318 (9 76) NRCM 0240

  • v.s. eeve=====v paines=e erwece s s e te - se e - s e e 1

-..m.

._