DISTRIBUTION:
JAN 2 21979 gi n u,
NRR Rdg. File = M. Groff DSS:MEB Rdg. File Y
Docket !10.: 50,S F MS No.: 05-11 MEMORANDUN FOR:
S. A. Varga, Chief Light Water Reactors GRanch 94. OPM FROM:
R. J. Bosnak, Chief Mechanical Engineering Branch, DSS SU2 JECT:
FINAL FIRST ROUND QUESTIONS OF FSAR Plant Name: }lPPSS Huclear Project No. 2 Licensing Stace: OL Docket t'o.:
50 397 Responsible Project Manager:
- h. D. Lynch Responding Technical Reviewers: FSAR Sectior 3.6, R. J. Xiessel FSAR Section 3.9, F. C. Ct.erny FSAR Section 3.10. R. M. Stephens Cescription of Response: Final first rcund question': of FSAR Revie.4 Status: Awaiting Infomation The Mechanical Engir.eering Branch has completed its review of Sections 3.6. 3.9, and 3.10 of the FSAR.
Adequate responses to the attached requests for infomation are required before we can complete our review of 6thesubject soplication.
It should be nnted that several sections and figures of the FSAR (subh as Sections 3.6.1.6 through 3.6.1.10, 3.6.1.20, and 3.6.2.3.4.4.b and c and Figures 3.5-11.through 3.6-36 and 3.6-38 through 3.6-40) are indicated as "later." We have posed questions as to when this infomation will be presented. We may, of course, have to pose additional questions in these areas should our review, following subnittal by the applicant, indicate the need for them.
A comparisen of the attached first round questions with those asked on Susquehanna SES Units 1 & 2 (63-337) and on Grand Gulf Nuclear Statio Units 1 t,2 (50-41r,) will be prepared and forwarded to you following conplation of the Grand Gulf review.
421401 L 2 )(h r
y,3,: Fw tuctc:9.f (';,
Ed C RLW.7 n x y -,.
e
, u.a t'echanical Engineerinc Granch
-Civisien or Systtmrsa fety sv.maae >
onea (RCPORM 318 (9 74) NRO4 0240
- w. e. novenmue=, enewtiese erreese sore - ese ea4
gg 2 2 373
= 82-cc w/att:
R. J. Mattson 055
- 0. Vassal 19, DFM J. Knight, 055 F. Cherny, OSS M. Qy Lynch, OPM R. Frahm, OSS R. J. Xiessel 055 S. N. Hou, OSS R. M. Stephens DSS H. Bramer, DSS cc w/o att:
R. Boyd, OP!t W. Pike, MPA Contacts:
FSAR Section 3.G, R. J. Kiessel, MR, X27530/72 FS,*R Saction 3.9, F. C. Cherpy, NRR, X27538/72 FSAR Section 3.10, R. M. Stephens, NRR, X27538/72 l
l OSS:MEB[l@ _ 05):MEB OSS)4EB 055:!s8 [
0*AkB
.RJthss[b5 MdGEne sedP"..,,,,,,f,c[h e r n v '
[qinak,_,
eva a e
- u/9ns.. _1/D179 RL7L79
-.1d379 1LL9 aa'e - MC PORM lie (9 7a) NRCM 0240 W u. a. eeve==us=,,.., no on,icae sere. ese.ese}}