ML20212R382
| ML20212R382 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 04/16/1987 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 8704270145 | |
| Download: ML20212R382 (1) | |
Text
M b:ptsIV David W. Cockfield Vice President, Nuclear April 16, 1987 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555
Dear Sir:
TROJAN NUCLEAR PLANT Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 (Generic Letter 87-02)
On March 24, 1987 Portland General Electric (PCE) received a copy of Generic Letter 87-02 dealing with the verification of seismic adequacy of mechanical and electrical equipment in operating reactors. Generic Letter 87-02 required a written response within 60 days from its receipt.
Inasmuch as PGE did not receive this letter until March 24, approximately two weeks after other licensecs, it is proposed that our response to this letter be submitted by May 23, 1987. This proposed delay in our response was discussed with Mr. Chan of your staff.
Sincerely, c:
Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Kish, Director State of Oregon Department of Energy Mr. R. C. Bare NRC Resident Inspector Trojan Nuclear Plant Ok 8704270145 870416
'0 FDR ADOCK 05000344 PDR p
121 S.W Salmon Street. Porttard. Oregon 97204