ML20212R215

From kanterella
Jump to navigation Jump to search
Mod 1,extending Contract Period for 30 Days,To Development of Testing & Analysis Methodology to Determine Functional Condition of Solenoid-Operated Valves Used in Nuclear Power Plant Safety Applications
ML20212R215
Person / Time
Issue date: 04/04/1987
From: Lefkowitz S, Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM), PENTEK, INC.
To:
Shared Package
ML20212R189 List:
References
CON-FIN-D-1711, CON-NRC-04-86-135, CON-NRC-4-86-135 NUDOCS 8704240350
Download: ML20212R215 (2)


Text

q t

V 4 C ONT A &Ei sD CODL PAGE 03 Pg&ES AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

}

e 3 AME PeDME NT /tago p ac At eom peo.

3septgteytDAft

. A E Guebai EON /5'u8e EM ASI R E Q peo S. PR OJt C t Peo ut.rpaarete,

One (1)

RES-86-135 dtd 2/17/87

e. essuto ev
7. AowiNisit RE o e v tit.ine, en.n Asem si l

U.S. Nuclear Regulatory Cornission Division of Contracts Washington, DC 20555

4. N AM L APs0 ADO R ESS OF CONT R AC10R iho.. er' vet, epon ry, E s.te.nd ZdP C de) g)

9A. AMENDMEN1 OF $0L6C41 ATION Pe3 Pentek, Inc.

ATTN: Sheldon Lefkowitz, President

^'E 1026 Fourth Avenue Coraoplis, Pennsylvania 15108 noA ugois iCATiON O, CONiR ACv0RoLR X

NRC-04-86-135 Soo DATEO LSEE RTEN 13)

CODE lF ACILITY CODE 9/30/86

11. THis ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICIT ATIONS The above runbered solicitation is emended as set forth in Item 14. The hour s'd date specified for receipt of Offers O is e.,e, d.

is oo e..

t'nded OflJrs must actnoakdae receipt of this a endment prior to the hour and date specibed in the schcitation or es amerused.by one of the following rnethods hl By competing items 8 and 15.end returnin; copies of the amendment. (b) By acknowleds:ng receipt o' th.s amendment on each copy of the ce-submitted. or act Bv secrete lette or teieg am ws.ch inciudes a reference to the soi.citat on and amendment num*;e's F ALLURE OF YOUR ACKNOWLEDG l

MENT TO BE RECEIVED AT THE PLACE DEstGN ATED FOR THE RECEIPT OF OFFERS prior To THE HOUti AND DATE sPECIFIED MAY RESULT IN REJECTION OF YOUR OF FE R. If by virtue o' this amendment you desire to change en o+fer stready submitted,such change may be made ty, seieram e-letter, proveda$ exh lef 9'am or lette' man es reft'ence to the solicitation and this s*nendment, and is re:eived proof to the openin0 hod' and date specif e.d t

12. ACCOUNisNG AND APPROPRIAl SON DAT A (1/ eve.rmd; N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTR ACT/ORDE R NO AS DESCRIBED IN ITEM 14.

A.

SCMA GE ORDE R SS PueeSUANT TO: (Speelfy..th.rst> A T HE CHANGES 5E Y FORTM IN 4 TEM 1a ARE M ADE sh 1ME CON.

y)

"i",'.**,7.*J.",0le",'sii?Ol%'il' ?EM 70"REA'ET8IEi'u'T',7oYTv OO'U"E'o"Ee'"ANots u.en., en. nee. en p >4ne.m C. TMIS $uPPkEMENT AL AGREEMENT ab ENTERED INTO PUR$UANT TO AUTHORIT Y OF s X

Mutual agreement of the parties

o. O i ME R <s,,eir,er,,.t m a ir

....n.nd. ora..,,,

uPORTANT: Contractor is not, b is required to sign this dcrument and return 3

copies to the issuing of f>Ce ice ae R.,,0N O, A-N on N uw oo,,,e A,,0N,0,..-en, w.,e r a,e.s.n...ne,.d r,.

.u.

.n,e.n.,e

.. w e, r.....s.ere re..

Modification is issued to extend contract period for 30 days at no additional cost.

The following change is hereby incorporated:

1.

Under Section F - Deliveries and Performance, Subsection F.3 - Duration of Contract Period is revised to read as follows:

"F.3 Duration of Contract Period

$042 g870404 NRC-04-86-135 PDR This contract shall become effective on September 30, 1986 as specified in Block 3 of the SF26, and shall continue to completion thereof, on an eroveed here n,all terpril 30,t*.1987. "

A s and condi no of the document referenced in item 9A or ICA, as heretofore changed,eemains unchanged and in f.it force t

  • IS A. N AME AND TIT LE OF SIGNE R (Type cr annff 16 A. N AME AND TITLE OF CONT R ACTING OF FICER (Type.e pnnt; Shel n Lefkowitz, President Elois J. Wiggins ISJ. CONT

'T ' /OFFE OR abc. DATE StGNEO 3 6 B. UNI ED 5T AT ELOS AME ICA 36C. DATE SiGNEC s

1 g

f q$ates.t.re.f herson.f th) *ssed to sc)

(5 ann.t6*e of or *rytr Offneer)

~

V W#

n.

N e

+

e WitC-04 135 Modification No. I

)

Page 2 of 2 j

i i

The contractor has agreed that in consideration of the 30-day extension-

]

the Government will receive a final report which contains more extensive data as a result of further testing and review.

t 4

4 I

i
l i,

1 A

1 4

l I

1 4

e 1

4

}

E i

i v

,,v.n,-

,=,rw-y,---,-,,,w,,-w.,,,,

---.m,-*,-

y.

,,,.m--w,

.,,w..,,

v,..+

r,

-.~,-

ye,, -,.,---. ~,y

,-.y..

,w,,,--