Text
-_. -..
4 APPENDIX B
-j TO FACILITY LICENSE No. NPF-62 i
CLINTON POWER STATION UNIT NO.1 ILLINOIS POWER COMPANY 1
DOCKET No. 50-461 1
1 ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL) i April 17, 1987 l
07042 OCg 500 fz
CLINTON POWER STATION UNIT NO.1 ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL)
TABLE OF CONTENTS Section Page 1.0 Objectives of the Environmental Protection Plan.......
1-1 2.0 Enviromental Protection Issues...............
2-1 2.1 Aquatic Issues........................
2-1 2.2 Terrestrial Issues......................
2-1 2.3 Atomic Safety Licensing Board Ordered Unit 2 Issues.....
2-2 3.0 Consistency Requirements...................
3-1 3.1 Plant Design and W ation...................
3-1 3.2 Reporting Related to the NPDES Permits and State certification.........................
3-2 3.3 Changes Required for Coupliance with Other Envirorsnental Regulations.........................
3-2 4.0 Envirorsnental Conditions...................
4-1 4.1 Unusual or Inportant Envitustal Events..........
4-1 4.2 Enviromental Manitoring...................
4-1 5.0 W nistrative Proceares..................
5-1 5.1 Review and Audit.......................
5-1 5.2 Records Retention......................,. 5-1 5.3 (hangds in Envi4wstal Protection Plan...........
5-1 5.4 Plant, Reporting Requirements.................
5-2
1.0 OBJECTIVES OF THE ENVIRONMENTAL PROTECTION PLAN The Environmental Protection Plan (EPP) is to provide for protection of non-radiological environmental values during oaeration of the nuclear facility.
The principal objectives of the EPP are as follows:
(a)
Verify that the Plant is oierated in an environmentally acceptable manner, as established by the Final Environmental Statement-Operating License Stage * (FES-OL) and other NRC environmental impact assessments.
(b)
Coordinate NRC requirements and maintain consistency with other Federal, State, and local requirements for environmental protection.
(c)
Keep NRC informed of the environmental effects of facility construction and operation and of action taken to control those effects.
4 Environmental concerns identified in the FES-OL which relate to water quality' matters are regulated by way of Illinois Power's (the licensee s) NPDES permit.
- Final Environmental Statement related to the operation of Clinton Power Station, Unit No. 1.
NUREG-0854, hay 1982 (FES-OL).
t ;
i 1-1
- 2. 0 ENVIRONMENTAL PROTECTION ISSUES environmental impactsIn the FES-OL dated May 19 Clinton Power Station 82, the staff considered associated with the environmental concernsidentified which requir d Certain environmental ioperation of the the e
environment.
study or license ssues were and to assure adequate protectionconditions to resolve of the 2.1 Acuatic Issues (a)
Effluent limitations contained in the effective NPDES permit isand aquatic mon NRC will re1y on thisIllinois Environmental P sued by theequirements are rotection Agency (ILOO36919 as they inv,olve water qu l agency for a ity and aquatic biotaregulation of these).
The (b)
One specific matters j
potential for the pathogenic thermopaquatic issue raised by th i
generation begins. hilic amoeba in Clinestablishment of en t
j conduct monitoring in ac The NRC will rely on th ton Laketic human the Illinois Departm
(
after power FES-OLs cordance with the e licensee to ent of Public Health asrecommendations
\\
of stated in the 2.2 Terrestrial Issues
\\
Steam fog from the 3
monitoring programreducing visibility over s tation 's shall be initiated to detcooling lake has th i
nearby roads cause highway safety haza dand density of cooling lak j
and bridges.
ntial of 1
NRC shall rely on the li A fog
\\
n s adjacent to theuced fog which could poteermine the local nighway safety offi iin cooperation with the Ill r
i censee to
(
conduct a fog monitoringcooling lake.ially nt
\\
inois Department of Trans The als c
\\
as program stated in the FES-OLportation and
\\
\\
\\
\\
\\
2-1 w--"'-
O 2.3 Atomic Safety Licensing Board Ordered Unit 2 Issues In the event of harmful effects or evidence of trends toward irreversible damage to the environment due to the Unit 2 excavation, the NRC will be provided with a detailed analysis of data and proposed course of action to alleviate the problem.
4 1
k 6
i
)
2-2
4 o
i 3.0 CONSISTENCY REQUIREMENTS i-t i
3.1 Plant Design and Operation l
The li.censee may make changes in plant design or operation or perform tests or experiments affecting the environment provided such changes, tests or experiments do not involve an unreviewed environmental question, and do not involve a change in the EPP.*
Changes in plant design or operation and performance of tests or experiments which do not affect the environment are not subject to the requirements of this EPP.
Activities governed by Section l
3.3 are not subject to the requirements of this section.
Before engaging in additional construction or operational activities which may affect the environment, the licensee shall prepare and record an environmental evaluation of such activity if the activity has measurable environmental effects which are not confined to onsite areas previously disturbed during site i
preparation and plant construction.
When the evaluation indicates that guch activity involves an unreviewed environmental question, the licensee shall provide a written evaluatien of such activities and obtain prior approval from the Nuclear Regulatory Commission.
When such activity involves a change in the EPP, such activity and change to the EPP may be implemented only in accordance with an appropriate license amendment as set forth in Section 5.3 of this EPP.
A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns (1) a matter-which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL as modified by staff's testimony to the Atomic Safety and Licensing Board, supplements to the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Boards or (2) a significant change in effluents or power level or (3) a matter not previously reviewed and This provision does not relieve the licensee of the requirements of 10 CFR 50.59.
3-1
cvaluated in the documents specified in (1) of this Subsection, which~may have a significant adverse environmental impact.
The licensee shall maintain records of changes in plant design or operation and of tests and experiments carried out pursuant to this Subsection.
These records shall include a written evaluation which provide bases for the determination that the change, test or experiment does not involve an unreviewed environmental question nor constitute a decrease in the effectiveness of this EPP to meet the objectives specified in Section 1.0.
The licensee shall include as part of the Annual Environmental Operating Report (per Subsection 5.4.1) brief descriptions, analyses, interpretations, and evaluations of such changes, tests and experiments.
j 3.2 Reporting Related to the NPDES Permits and State Certification Modification to 'the NPDES percit or the State certification pursuant to Section 401 of the Clean Water Act shall be reported to the NRC within 30 days following the date the modifi'ed permit is reissued.
If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.
The NRC shall be notified of modifications proposed by the licensee to.the effective NPDES permit by providing NRC with a copy of the proposed modification at the same time it is l
suimitted to the permitting agency.
The notification of a licensee-initiated modification shall include a copy of the requested modification submitted to the permitting agency.
The licensee shall provide the NRC with a copy of its application for reissuance of the NPDES permit at the same time the application is submitted to the permitting agency.
3.3 Changes Required for Compliance with Other Environmental 1
Regulations j
Changes in plant design or operation and performance of tests or experiments required to achieve compliance with other Federal, State, or local environmental regulations are not subject to requirements of Section 3.1.
l 3-2
4.0 ENVIRONMENTAL CONDITIONS 4.1 Unusual or Important Environmental Events j
Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related i
to station operation shall be recorded and promptly reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone, telegraph or facsimile transmissions followed by a written report per Subsection 5.4.2.
The following are examples:
excessive bird impaction events, onsite plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, significant fish kills, increase in nuisance organisms or conditions and unanticipated or emergency discharge of waste water or chemical substances.
4.2 Environmental Monitoring Environmental monitoring programs are conducted in accordance with the guidance and controls of agencies outside the Nuclear Regulatory Commission (NRC).
The NRC has recognized these agencies (Illinois Environmental Protection Agency, Illinois Department of Public Health, and Illinois Department of Transportation) as the authorities having jurisdiction in Section 2.0 of this EPP.
Therefore, no specific environmental monitoring is required by the NRC under this EPP.
i 4-1
5.0 ADMINISTRATIVE PROCEDURES 5.1 Review and Audit The licensee shall provide for review and audit of compliance with the EPP.
The audits shall be conducted inde7endently of the individual or groups responsible for performing t:ae specific activity.
A description of the organization structure utilized to achieve the independent review and audit function and results of the cudit activities shall be maintained and made available for inspection.
5.2 Records Retention The documentation listed below shall be made and retained in a manner convenient for review and inspection by the NRC.
This documentation shall be retained as indicated below and made available to the NRC upon request.
(a)
Records of modifications to plant structures, systems, and components determined to potentially affect the continued (life of the plant) krotectionoftheenvironmentecords, procedures, data, and logs relating to this E (b) years).
(c)
Preope, rational environmental monitoring records, procedures, data and' logs (5 years).
(d)
All other records and logs relative to the environmental aspects of plant operation (5 years).
5.3 Changes in Environmental Protection Plan Requests for changes in the EPP shall include an assessment of the environmental impact of the proposed change and a supporting justification.
Implementation of such changes in the EPP shall not commence prior to NRC approval of the proposed changes in the form of a licensee amendment incorporating the appropriate revision to the EPP.
l 5-1
+
5.4 Plant Reporting Requirements 5.4.1 Routine Reports An Annual Environmental Operating Report describing implementation of this EPP for the previous year shall be su)mitted to the NRC prior to May 1 of each year.
The initial report shall be submitted prior to May 1 of the year following issuance of the operating license.
The period of the first report shall begin with the date of issuance of the operating license for Unit One.
The Annual Environmental Operating Report shall include:
(a)
A list of EPP noncompliances and the corrective actions taken to repedy them.
(b)
A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection'3.1 which involved a potentially significant unreviewed environmental issue.
(c)
A list of nonroutine reports submitted in accordance with Subsection 5.4.2.
(d)
Any results and/or as'sessments for the environmental monitoring programs described in Subsection 2.0 of this EPP
~
which were submitted to the respective regulatory agencies during the annual reporting period.
If harmful effects or evidence of trends towards irreversible damage to the environment are observed, the licensee shall
)
provide a detailed analysis of the data and a proposed course of action to alleviate the problem.
j In the event that some results are not available by the report due date, the report shall be submitted noting and explaining the missing results.
The missing data shall be submitted as soon as possible in a supplementary report.
1 5-2 l
l.
5.4.2 Nonroutine Reports A written report shall be submitted to the NRC within 30 days of occurrence of a nonroutine event.
The report shall (a) describe, analyze, and evaluate the event, including extent and magnitude of these impact and plant operating charact. eristics, (b) describe the probable cause of the event, (c) indicate the action taken to correct the reported event, (d) indicate the corrective action taken to preclude repetition of the event and to prevent similar occurrences involving similar components or systems, and (e) indicate the agencies notified and their preliminary responses.
Events reportable under this subsection which also required reports to other Federal, State, or local agencies shall be reported in accordance with those reporting requirements in lieu of the requirements of this subsection.
The NRC shall be provided with a copy of each report at the same time it is submitted to thg other agency.
l 5-3
[
UNITED STATES
[
NUCLEAR REGULATORY COMMISSION r,
,y WASHINGTON. D. C. 20555
\\...+/
April 17, 1987 APPENDIX C i
ANTITRUST CONDITIONS FACILITY OPERATING LICENSE NO. NPF-62 Illinois Fower Company (IP) is subject to the following antitrust conditions:
(1) Definitions (1)(a)
" Licensee" means IP and includes each present or future wholly-owned subsidiary of IP and any successor to it; (1)(b)
" Neighboring electric system" means (i) a financially responsible business corporation, not-for-profit corpo-ration, rural electric cooperative, municipal corporation organized under the laws of the State of Illinois, company, association, joint stock company, firm, partnership, or person owning or operating, or proposing bona fidely and in good faith to own or operate, facilities for the generation, transmission or distribution of electricity f.or bulk power supply, (ii) whose facilities are or will be located in the State of Illinois, (iii) whose facilities are interconnected, or are proposed to be interconnected, for the purpose of carrying out one or more of the transactions referred to herein with facili-ties of the Licensee (provided that any) proposed inter-connection shall be lawful and feasible, and (iv) which is or will be a public utility under the laws of the State of Illinois or the Federal Power Act and is or will be providing electric service under a contract or rate schedule on file with and subject to the regulation of the Illinois Commerce Commission or the Federal Power Comnission. The requirement that a neighboring electric system shall be a public utility does not apply to a rural electric cooperative or a municipal corporation but will apply to a rural electric cooperative or a municipal corporation if at a future date it 1s included within the definition of "public utility" under the j
Illinois Public Utilities Act or under a similar act.
(The definition of neighboring electric system includes systems
.which meet the above requirements either now or in the future.);
l l
2-(1)(c)
"Cests" means all operating and maintenance expenses, capital costs and a reasonable return on investment which are properly applicable to the particular
~
transaction and the facilities involved in the transaction; (1)(d)
" Neighboring entity" means a neighboring electric system owning or operating, or proposing bona fidely and in good faith to own or operate, facilities for the generation of electricity for bulk power supply; (2) The broad purposes of any interchange or other arrangement for bulk power supply transactions between the Licensee and a neighboring electric system are to improve the reliability and quality of service, to avoid the duplication of facilities, and to minimize costs. Any such arrangements will involve planning by the parties and should be technically and economically feasible and practical.
The arrangement should also be reciprocal as nearly as may be although it is recognized that, in any particular arrangement, the benefits may not be equal or identical for each party and that a smaller electric system may realize benefits which are greater than those realized by a larger system. No party should be obligated to enter into an arrangement if it would realize no net benefits from the arrangement, or if the arrangement would result in net burdens to the party. The policies herein expressed cannot be implemented unilaterally by the Licensee. If an arrangement between the licensee and a neighboring electric system is to be successful and is to operate in the public interest, it must be negotiated and performed in good faith and with full cooperation by the parties to it. No party should capriciously reject a proposal submitted by another party and the Licensee and neighboring electric systems sfnuld'give reasonable consideration to proposals made by each other; (3) The Licensee will interconnect with any neighboring entity in order that the parties may seek and realize all benefits practicable to be effected through the coordination and development of their respective systems and in carrying out various interconnection services and transactions. The Licensee will assist to the fullest extent feasible j
any neighboring entity in the coordination of reserves through the sale and purchase of emergency energy and maintenance power upon tems that will provide for the full compensation of the Licensee's costs. No party shall be required to provide emergency energy or maintenance power if to do so will impair the supplying party's ability to render adequate and reliable service to its customers or to discharge its prior comit-ments, if any, to other electric systems.
(4) The Licensee and the neighboring entity shall each provide sufficient capacity (which may include firm contracted-for-capacity) in its system to enable it to carry its planned-for-peak demand plus an adequate reserve. An adequate minimum reserve requirement shall be mutually detemined from time to time as a percentage of planned-for-peak demand
l '
(unless other wise agreed) and shall take into account such reserve criteria as the nature of the respective systems and planned-for-peak demand required in order to assure reliability of service and an equitable sharing of reserve responsibility. Each party shall provide such amount of spinning reserve as shall avoid the imposition of an unreasonable demand on the system of the other party. However, such spinning reserve requirement shall not exceed the minimum installed reserve requirement.
If over a reasonable period, a party has failed to deliver emergency energy, or if a party has appeared to make excessive j
calls for emergency energy, th.e parties shall jointly study the matter for the purpose of determining the adequacy or inadequacy of the reserve ganerating capacity and transnission facilities being provided to meet the requirements of the interconnected systems and of detemining the manner of correcting any deficiencies; (5) The agreement for the interchange arrangement between the Licensee and a neighboring entity will not include restrictive provisions which would preclude a party from engaging in interconnection and coordination arrangements with others, but may include appropriate provisions to assure (1) that the Licensee receives adequate notice of such additional interconnection or coordination (ii) that the parties will jointly consider and agree upon such measures, if any, as are reasonably necessary to protect the reliability of the interconnected systems and topreventundueburdensfrombeingimposedonanysystem,and(iii)that Good industry the Licensee.will_Je fully compensated for its costs (if not unreasonably practice as developed in the area from time to time restrictive) will satisfy this provision; (6) Interconnections will be available for a neighboring electric system on any of theticensee's installed transmission and subtransmission facilities if the proposed interconnection is technically and economically feasible and the Licensee is fully compensated for its costs. Interconnections will not be limited to low voltages when higher voltages are available from the Licensee's installed. facilities in the area where the interconnection is desired. Control a'nd telemetering facilities shall be provided as required for the safety and reliability of the interconnected systems; (7) The Licensee will afford an opportunity to participate to any neighboring electric system that makes a timely request therefor in the ownership of, or purchase of unit participation power from, Clinton Power Station Unit 1, and any additional nuclear generating unit which the Licensee may construct, own, and operate and which in the application filed with the Comission, or any successor agency, is scheduled for consnercial operation prior to January 1, 1989, to a reasonable extent and on reasonable tems and conditions and on a basis that will fully compensate the Licensee for its costs incurred and to be incurred and that will not adversely affect the financing of such power station. The request shall be deemed timely with respect to Clinton Power i
Station Unit 1, if received by June 30, 1974, and with respect to any additional generating unit if received within a reasonable period of time from a planning and operating standpoint after the public announcement by the Licensee of the proposed installation
)
of any such unit. As a pa.rt of any arrangement that may be reached.
with respect to such participation, the Licensee will interconnect with and deliver any power to which the neighboring electric system may be entitled under such arrangement at a delivery point or points on the Licensee's system on a basis that will fully compensate the Licensee for its costs; (8) TheLicenseewillsellbukkpowertoanyneighboringelectricsystem in accordance with rates,:tems and conditions which fully compensate the Licensee for itt. costs, and which do not restrict use or resale except as may be necessary to protect the reliabil'ty of the Licensee's system, and as are accepted or approved by the appropriate regulatory body or bodies. The Licensee shall not be required to make any such sale if the Licensee does,not have available sufficient generation to provide the requested service or if the sale would impair the Licensee's ability to render adequate and reliable service to its customers or to discharge its prior comitments, if any, to other electric systems; (9) The Licensee will work wiiih neighboring electric systems to fac'ilitate the exchange of bulk power by transmission over its transmission facilities between or among two or more neighboring electric systems and between any neighboring electric system and any other electric system engaging in bulk power supply outside the Licensee's service area between whose facilities the Licensee's transmission lines and other transmission lines would form a continuous electrical path, provided that.(1) pemission to utilize such other transmission lines has been obtained by the proponent of the arrangement, and (ii) the arrangements reasonably cain be accomodated from a functional and technical standpoint.
Such transmission shall be on terms that fully compensate the Licensee for its costs. Any neighboring electric system requesting such transmission arrangements shall give reasonable advance notice of its schedule and requirements. The Licensee shall not be required to enter into any arrangement which would impair system reliability or emergency transmission capacity, it being recognized that while some transmission facilities may be operated fully loaded, other transmission facilities may be for emergency use and operated either unloaded or partially loaded; j
(10) The Licensee shall include in its planning and construction programs sufficient transmission capacity as required for the transactions referred to in paragraph (9), provided any neighboring electric system gives the Licensee sufficient advance notice as may be necessary to accomodate its requirements from a functional and technical standpoint and that such neighboring electric system fully. compensates the Licensee for its costs. The Licensee shall not be required to construct transmission facilitiss if it finds construction of such facilities infeasible, or if its costs in connection therewith would exceed its benefits therefrom, or if it finds such facilities would impair system reliability or emergency t
transmission capacity; l
I
i (11)(a)
This statement of policy is not intented to affect in any way the franchises, certificates of public convenience and necessity, '
i i
or other rights of the Licensee or of any neighboring electric systen to render electric service in the State of Illinois; (11)(b) hothing herein shall be construed as a waiver by the Licensee of its right to contest whether or not and the extent to which a particular factual situation may be covered by this statement 4
of policy or preclud! the Licensee from contesting an alleged act of unf air competiticn; (11)(c)
The Licensee shall r! cognize that the carrying out of some of the policies exorested herein in particular circumstances may not he in tF: mutual interest of the Licensee and a neighboring electric system. Nothing herein is intended to preclude the Licensee and a neighboring electric systen from reaching an agreement which extends, varies or supplements the provisions
.cf the foregoing paragraphs in a manner not inconsistent with the broad purposes ' expressed in paragraph 2 and applicable law; (11)(d)
The Licensee does not intend by this statement of policy to become a connon carrier; and (12) The foregoing policies are to be implemented and applied in a manner consistent with Federal, State and local laws, regulations ard orders..All stes, charges, conditions, terus and practices are and will be subject to the acceptance or approval of any i
regulatory agencies or courts having jurisdication over them.
To the extent that such action may at the time be required in order to effect any such changes, the Licensee and any neighboring electric system affected by any of the foregoing policies reserve j
the right of recourse to the appropriate forum to seek such changes therein as may at the time be appropriate in accordance with law, the public interest, or good industry practices.
., f.
4
.-