ML20212P989

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Implementing Procedures,Including Rev 6 to EPIP 1.1, Plant Operations Manager Initial Response & Rev 16 to EPIP 1.2, Event Classification
ML20212P989
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/26/1987
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212P992 List:
References
CON-NRC-87-021, CON-NRC-87-21 VP-87-087, VP-87-87, NUDOCS 8703160449
Download: ML20212P989 (6)


Text

l Wisconsin Electnc m coune 231 W. MICHIGAN, P.O. box 2046, MILWAUKEE, WI $3201 (414)221 2345 VPNPD-87-087 NRC-87-021 February 26, 1987 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION washington, D. C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed is.one copy of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.

These revisions consist of page changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that procedures that contain names and telephone numbers are stamped "NRC ONLY, Not for Public Disclosure."

copies of affected procedures, with names and numbers deleted, are provided to assure confidentiality and facilitate your distribution to the public document rooms.

Please return the receipt forms for these copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant l

6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, fU C. W.,Fa 8703160449 DR ADOcg b

Vice President p

66 Nuclear Power PDR I f Enclosures Copies to Regional Administrator, Region III NRC Resident Inspector (without enc.)

[

s February 20, 1987 NRC - Washinston, Document Control Desk i

POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES The following revised procedures are attached and should be inserted into your manual. Please destroy the revision removed from your manual.

1.

EPIP 1.1,

" Plant Operations Manager Initial Response," Revision 6, dated 02-20-87.

2.

EPIP 1.2,

" Event Classification," Revision 16, dated 02-20-87.

3.

EPIP 1.3, "Offsite Agency Notification," Revision 3, dated 02-20-87.

I 4.

EPIP 7.2.2, "Activ,ation of Chemistry & Health Physics at. Technical Support Cen'ter/ Operations Support Center," Revision 8, dated 02-20-87.

5.

EPIP 12.1,

" Reentry Procedures for Emergency Operations," Revision 7, i

dated 02-20-87.

The following revised forms are attached and should be inserted into your manual.

I 1.

EPIP-13 (02-87) " Point Beach Nuclear Plant Status Update Form," (place after EPIP 1.3).

2.

EPIP-14, (02-87) NRC Event Notification Worksheet (place after EPIP 1.3).

j 3.

EPIP-22, (02-87) " Plant Personnel Emergency Call List," (place after Call l

List tab).

4.

EPIP-23, (02-87) "Offsite Agency Emergency Call List," (place after Call List tab).

i i

l

POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Page 2 5.

EPIP-24, (02-87) " Emergency Response Facility Telephone Directory,"

(place after Call List tab).

6.

EPIP-25, (02-87) " Wisconsin Electric Headquarters support Personnel Emergency Call List," (place after Call List tab).

7.

EPIP-32, (02-87) " Search & Rescue And Emergency Operations Checklist,"

(place after EPIP 12.1).

EPIP-32, (02-87)

(place after EPIP 12.2)

NOTE:

2 COPIES OF EPIP-32 ATTACHED.

Also attached is a revised listing of the Table of Contents and Table of EPIP forms to be inserted into your manual. Please destroy the old revisions.

Please complete the attached receipt form and return to Ms. P. A. Dent at the Point, Beach Nuclear Plant.

/s/ D. R. Stevens gah Attachments l

I FOR INFORMATION ONLY i

i

NRC - Washington, Document Control Desk POINT BEACH NUCIJAR PLANT EMERGENCY PIAN IMPLEMENTING PROCEDURES February 20, 1987 EPIP 1.1, 1.2, 1.3, 7.2.2, and EPIP 12.1, have been received by the undersigned and inserted in the Emergency Plan Implementing Procedures Manual.

Date FOR INFORMATION ONLY l

i l

l l

REQULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:4P9999999EP" DOC.DATE: 87/02/26 NOTAR17ED: NO DOCKET O FACIL: 50-266 Point Bacch Nuclocr Plcnt, Unit 1, Wincensin Electric 05000266 50-301 Point Beach Nuclear Plant, Unit 2, Wisconsin Electric 05000301 AUTH.NAME AUTHOR AFFILIATION FAY,C.W.

Wisconsin Electric Power Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Central Files version of revised emergency plan implementing procedures, including Rev 6 to EPIP 1.1 re plant operations manager initial response,Rev 16 to EPIP 1.2 re event classification & Rev 3 to EPIP 1.3.

DISTRIBUTION CODE: AX45D COPIES REC ;IVED: LTR

.[_. ENCL,l_ SIZE: _k N h TITLE: Emergency Plan or Implementie.g Procedures (Proprietary)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL PWR-A PD1 PD $ h 1

PWR-A PD1 LA Ij 1

i 1

p hj 1

COLBURN,T 1

IE/DEPER/EPD M f 1 INTERNAL: (D6[ DER h$

1 1

1 p

IE/DEPER/IRB 1

1 REG FILE 1

1 l

l l

l l

l TOTAL NUMDER OF COPIES REGUIRED: LTTR 7

ENCL 7

. _ _ - _ _ _ _.