N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01/02/87 COMPLETED BY A.Tetzlaff TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period DEC 86 l notes l
3. Licensed Thermal Power (MWt) 3250 l l
4. Name Plate Rating (Gross MWe) 1152 l l-
5. Design Electrical Rating (Net MWe) 1030 l l
6. Maximum Dependable Capacity (GROSS MWe) 1056 l l
7. Maximum Dependable Capacity (Net MWe) 1020 -----------------------
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For.Rostrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 8760.0 105192.0
12. No. of Hrs. Reactor Was Critical 744.0 7536.4 75825.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744.0 7466.0 74318.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2194212 21636825 216632508
17. Gross Elect. Energy Gen. (MWH) 714840 6918330 70895870
18. Net Elect. Energy Gen. (MWH) 687558 6650074 68197231
19. Unit Service Factor 100.0 85.2 72.0
20. Unit Availability Factor 100.0 85.2 72.0
21. Unit Capacity Factor (MDC Net) 90.6 74.4 64.8
22. Unit Capacity Factor (DER Net) 89.7 73.7 62.5
23. Unit Forced Outage Rate 0.0 14.8 8.6
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

The Cycle IX - X RefueMne is scheduled en_gttart in Junn 1987.

Enrfmnes.d duration is 60 days.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 336h 5Oh15 DO von

\\D

.~

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 01/02/87 COMPLETED BY A.Tetzlaff TELEPHONE 616-465-5901 MONTH DEC 86 AVERAGE DAILY AVERAGE DAILY DAY POWER Ll'NEL DAY POWER LEVEL 1

913 17 920 2

918 18 922 3

918 19 922 4

917 20 921 5

917 21 920 6

916 22 920 7

917 23 920 8

917 24 924 9

920 25 919

.10 919 26 922 11 982 27 919 12 1003 28 020 13 921 29 920 14 921 30 919 15 920 31 919 16 921

\\

i

,m.

-.wn

,-.,-._,n._n

- 5,

-i IMEKET NO.

50-315 i

UNIT Silll~lllOWNS ANilPOWEN NEI)lN'llONS D.C. Cook - Unit 1 UNIT NAME l-6-87 HATE COMP 3.ETEin hY B.A. Svensson HI PORT MON HI December, 1986 1El.I' PIN)NE 616/465-5901 j

i 1

g w

=

g

.$ E

'h j if }

1.icensee E-e, gg Cause & Causedive

]

N. i.

Dale g

gg j(

., g g livene g3 g'i Ausius in g3 g2 -

M HeghHe

  • wi O Pseveste Recussence H

6 NONE There were no unit shutdowns or significant power reductions

~

during the month. The unit has 3

i operated at a nominal 90% power limit administratively imposed to minimize steam generator tube degradation.

1 l

1 1

1 l

l I

i i

2 3

4 1

1: l'inceJ licasmi:

Meshuit:

Enlnble G-Insecucilinis i-5: Silicilnical A I!quigunent I;ailme (Emplain)

Ihnual fus Piepasatiews ofl>asa il Maintenance air Tes!

2 &nual Sesam.

liniiy Slicess few l.icensee C Refueling 3 Automatic Stians.

Even: Hegun s II.f Rl l ile INilHI G-D Regulasiuy Resliicilim

-l Oihes Ilimplaini 0161) 17 Ope asus Isaining & Ikenw l naminaI6 wi i

1 Asiminisisalive 5

i G Opesatiinial 1:: ess Ilimplaint hlnhs I Smic Simwe

]

pl/lil it Ollies (linplain) 1 i

l i

, let.

DOCKET NO:

50-315 UNIT NAMES.

D. C. Cook Unit 1 COMPLETED BY:

W. H. Kirchoff TELEPHONE:

(616) 465-5901 DATE:

-January l8, 1987-PAGE 1 of-11

' MONTHLY OPERATING ACTIVITIES - DECEMBER 1986 4

HIGHLIGHTS:

' With the exception for a' power increase to'100% to perform. core flux mapping, the unit operated the entire month at the' nominal-

~

490% power ~ limit, which has been. administratively imposed to minimize steam generator tube degradation.

Gross electrical generation-for the month of December was 714,840 MWH.

SUMMARY

12-11-86 At.0600, a power ascension was starte'd reaching.

100%~at 1053.

To allow Nuclear Section to perform Flux Mapping for.Incore/Excore cross calibration.

12-12-86 At 1816, a power reduction was begun. reaching.90%

at 2252.

r i

l m

1

.. _.. _... _ _ _ _ _. _.. ~. _. _,.. _ _ _ _ _ _ _ _ _.. _ _ _ _. _..__

~

i 4

Q' DOCKET NO.

50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE l-9-87

- COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE-1 of 1 MAJOR SAFETY-RELATED MAINTENANCE r

DECEMBER, 1986

' I&C-1

'After'the operability run of the Unit 1 CD diesel generator the CD diesel generator started on it's own and had to be tripped locally.

The problem was investigated and it was found that relay 19 DGCD, which controls the starting air valve 1, was defective.

The defective relay was replaced and the CD diesel was proven operable.

1 I&C-2 When attempting to synchronize the Unit 1 AB Diesel Generator to the AB bus, the start voltmeter 243 ABEP indicated a maximum

' of 60 volts on all switch positions including the "off" position.

This would not allow synchronizing diesel to the bus due to the 1__

bad indication.

r A broken relay on the voltage regulator board was found to be the cause for the low voltage readings. The broken relay was replaced and 1-AB diesel generator was declared operable.

I&C-3 ASCO solenoid valves for non-essential service water containment isolation valves, WCR-925, WCR-927, WCR-933 and WCR-935 were 4

found to be continuously venting off at the solenoid's exhaust vent.

The internal parts to the ASCO solenoid valves were found not to function properly. The ASCO solenoid valves were rebuilt using ASCO parts kits.

Proper operation of valves WCR-925.

WCR-927, WCR-933 and WCR-935 was verified following the solenoid valve repair.

{