Progress Rept & Annotated Bibliography Prepared in Response to ASLB 860606 Memorandum & Order (Progress Rept & Notice of Available Documents).Certificate of Svc Encl.Related Correspondence
ML20212P510
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/27/1986
From: Bachmann R
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
References
CON-#386-561 OL, NUDOCS 8609030163
Download: ML20212P510 (15)


Text

_

t

.f g / LE N 50coan5ro=**u-00LKETED U61957/86 UNITED S' TATES OF AMERICA NUCLEAR REGULATORY COMMISSION ~2 .

BEFORE TIIE ATOMIC SAFETY AND LICENSING SQARDr MudIAb f DOCKt.ilhG & SERVICf.

BRANC4 In the Matter of )

)

TEXAS UTILITIES ELECTRIC ) Docket Nos. 50-445 COMPANY, et _al.

) 50-446 d (Comanche Peak Steam Electric )

Station, Units 1 and 2) )

NRC STAFF PROGRESS REPORT AND ANNOTATED BIBLIOGRAPHY I. PROGRESS REPORT 4 This progress report is prepared in response to the Licensing Board's " Memorandum and Order (Progress Report and Notice of Available Documents)" dated June 6,1986.

1. REVIEW OF REVISED PORTIONS OF CPRT PROGRAM PLAN Applicants have submitted four new or revised sections to the CPRT Program Plan since SSER 13 was issued. The review progress of each is as follows

ISAP III.a.1 (Rev. 4), Hot Functional Testing Data Packages.

Accepted by the NRC staff with no comments. (Letter, Noonan to Counsil, July 31, 1986) 8609030163 860027 DE"T""9"ED ORIGINAL PDR ADOCK 05000445 G PDR Certified By b A. Ob9 f

l i

ISAP VII.b.1 (Rev. 2), Onsite Fabrication.

Accepted, subject to comments. (Letter, Noonan to Counsil, July 31, 1986)

ISAP VII.a.9 (Rev. 0), Receipt and Storage of Purchased Material and Equipment.

Staff review shows that this new ISAP does not address all of the original concerns of the staff. Applicants advise it will be revised.

Revision has not been received as of the date of this progress report. (Letter, Noonan to Counsil, July 31, 1986)

Appendix E to Program Plan, CPRT Procedure for the Resolution of Discrepancies Identified by the CPRT (Rev. 2).

Under review. Review expected to be completed 9/86.

2. PROGRESS OF REVIEW OF ISAP RESULTS REPORTS .

To date, ten results reports have been submitted for staff review.

I.a.3, Butt Splice Qualification.

Under review . A request for additional information is being prepared.

I.a.4, Agreement Between Drawings and Field Terminations.

Review resumed based on Applicants' submission of a revision to the results report regarding further sampling, dated 8/11/86.

I

I.a.5, NRC's Vendor Installed Amp Terminal Lugs.

Recently received. Under review for need for additional information.

i I.b.3, Conduit to Cable Tray Separation.

Evaluation is expected to be issued 9/86.

j II b, Concrete Compression Strength.

Evaluation is expected to be issued 9/86.

III.a.4, Traceability of Test Equipment.

! Recently received. Under review for need for additional information.

i III.d. , Preoperational Testing.

Evaluation is expected to be issued 9/86.

VII.a.4, Audit Program and Auditor Qualification.

A request for additional information is being prepared.

VII.a.5, Periodic Review of QA Program.

Recently received. Under review for need for additional information.

VII.b.2, Valve Disassembly.

Evaluation is expected to be issued 9/86.

i I

w m ,. w..,,,__nn.., ,,.,m,.-,--_ nn-..,n,. .n,,,,

- - - , - - , - - , , ,m..,,,.. ,..,m,--,,,,,~,,_.,,,,.,-_-,,..n,n,_,.,,,,,,-,,m,p..,.. ,_---.n.-m,.

3. IE INSPECTION OF TERA DESIGN ADEQUACY PROGRAM IE inspection report 50-445/85-17, 50-446/85-14 dated January 21, 1986 documented IE's ' team inspection of the Design Adequacy Program (DAP), specifically with respect to scope, review checklists and personnel qualifications. The DAP is covered in DSAPs VIII through XI, and includes both self-initiated and external source issue reviews. During May and July 1986, IE followed up on the above inspection and inspected TERA's in-process reviews under DSAPs VIII through XI. The team inspections occurred at the four TERA locations: Bethesda, CPSES site, Berkeley and San Jose, and involved approximately four weeks (440 man-hours) of inspection.

The intent was to evaluate whether 1) the TERA review samples were representative, such that areas reviewed could be extrapolated to areas not reviewed, and 2) the TERA reviews had adequate depth.

Inspection reports are currently being prepared.

In parallel with the above technical inspections of DAP implementation, IE also inspected the implementation of TERA's DAP Quality Assurance Program. Inspection reports will be issued, i

The Applicants' July 30, 1986 Progress Report indicates that the Applicants are currently considering the development of

comprehensive corrective action plans to resolve preliminary findings (Discrepancy / Issue Resolution Reports) and their implications.

i Future IE inspections will focus on corrective actions, and therefore will be dependent on these developments.

w - e, g , .- --- - - , - ~ . - - - . - - - - - - - - - . - - -,- ~- - -- - - + - + - - , . - - - - , -,--.r~ -- -- -- , . -

O

4. REGION IV PROGRESS Region IV's inspection of the CPRT Program and Issue-Specific Action ' Plan implementation is currently being conducted 'in the following three areas:

o Results Reports and Issue-Specific Action Plans (ISAPs) o ISAP VII.c Construction Reinspection / Documentation Review Plan o CPRT Onsite QA/QC Activities I

I Region IV's completion of inspection activities related to the results reports and ISAP VII.c is dependent on the CPRT schedule.

Region IV has completed approximately 70% of the planned inspection of the ISAP VII.c construction reinspection activities. Region IV inspections of ISAP VII.c are concentrating on the Evaluation Research Corporation (ERC) overview inspections and documentation reviews. Evaluations of Applicants' submitted results reports are in preparation.

Since September 15, 1985, Region IV has received allegation cases from seventeen sources. One case was closed in NRC Inspection Report 50-445/85-18 and 50-446/85-15; seven other cases have been

(

! closed but are pending issuance of inspection reports and closure I with allegers. One case was referred by Region IV to the Applica:lts by letter dated May 30, 1986. The remaining cases are I

pending further information and/or inspection.

1 __ ._

5. STAFF COMMENTS ON CASE PROGRESS REPORT In its Progress Report filed August 11, 1986, CASE makes the following assertions:

Discovery of the Staff is essentially halted due to the Staff decision to require compliance with the requirements of 10 CFR II2.720(h) and 2.744 as a prerequisite to further discovery. Many outstanding FOIA requests by the Government Accountability Project relating to issues relevant here are unanswered and require perfecting appeals and court challenges.

Progress Report at 4. The Staff believes that the foregoing statement mischaracterizes its position on discovery. The Staff has made no across-the-board decision to insist that CASE comply with '

the requirements of 10 C.F.R Il 2.720(h) and 2.744 as a prerequisite to future discovery of the Staff. The Staff, as a general matter, continues to be willing to go forward with voluntary discovery without invoking those regulations based on its assessment of each individual request.

l l

l t . - _ _ _ --- __ _ . .- . _ _ _ _ ______

II. ANNOTATED BIBLIOGRAPHY The- following annotated bibliography is a computer-generated report prepared from the NRC's document control system. It lists all documents originated by NRC that have been sent to TUGCO relating to Comanche Peak that were indexed during the period June 6, 1986 to August 26, 1986, inclusive, b Since the Board instructed the parties "to err on the side of inclusiveness" (June 6, 1986 Memorandum, p. 3) and since the computer-generated list is not amenable to a sharper focus, it should be noted that the listing of any particular document does not constitute a determination by the Staff of the document's relevance to either the OL or CP extension proceedings.

In addition, the Board should be aware that it (as well as the parties) is now (since June 1986) on the service list for all Comanche Peak documents originated within the Office of Nuclear Reactor Regulation and will be placed on standard distribution for all Comanche Peak documents originated by NRC Region IV as of the date of this filing.

Therefore, the Board will be able to read in full any document listed in the bibliography.

Respectfully submitted,

~

Richard G. Bachmann Counsel for NRC Staff Dated at Bethesda, Maryland this 27th day of August,1986 1_/

It should be noted that there is a delay between the issuance of documents and the actual indexing onto the document control system. Thus the list may not contain all documents sent through August 26, 1986. Later-dated documents will appear in subse-quent bibliographies.

f

, - - . , , , . . . - . _ . , - , - - . , . , - , , , _ , . - . , , _ . . , , , - .---,.n , . , , , - - . - , - - - - - - - - - . , , , _ , . - - - - , . . . . ,

\' .

. I/26/86 PAGE 1 U. S. NUCLEAR REGULATORY COMMISSION

. DCS PARTIAL RECORD FORMAT REPORT 1

8606160018 Forwards NUREG-0797,SSER 13 re operation of facility, i

i FROM: NOONAN,V.S. PWR Project Directorate 5 T08 COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860609 AVAIL: POR Opp. DOCUMENT TYPE: CLNTU FPAC 8606160018

TASK: ODID: FORMAL REPT NO:

! DOCKET NO: 05000445 05000446 FICHE: 36551 293 36551 296 HIDSI 8606200283 Requests esteolishment of detailed audit program, master scheoule for Overview Quality Team reviews & audits &

proceoural controls for timely resolution of overview Quality Team matters oy Senior Review Team,per SSER 13.

FROM NOONAN,V.S. PWH Project Directorate 5 TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860609 AVAIL: POR 4pp. DOCUMENT TYPE: CLNTU FPAct 8606200283 TASK ODID: FORMAL REPT NO:

i DOCKET NO: 05000445 0500044o FICHE: 36643 013 36643 016 RIOS 8606170161 Ack receipt of 660514 Itr responding to IE Bulletin 85-003

Grants 2-month extension to finalire response to Item 1(e).

3 FROM WESTERMAN,T.F. Region 4, Office of Director TO COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ;

ISSUED: 860611 AVAIL: POR 2pp. DOCUMENT TYPE: CLNTU FPAct 8606170161 TASh: ODID: IEB-85-003 FORMAL REPT NO DOCKET No: 05000445 05000440 FICHE: 36543 339 36543 341 RIUS: IE01 i 8606250176 Forwards 850313 Investigation Rept 50-445/85-09 re Technical I

Review Team concern raisea on 840808 re regenerated training record.util requested to review & evaluate controls l to ensure program & proceaure adequacy, j FROMt HUNTER,D.R. Region 4, Office of Director T03 SPENCE,M.D. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860611 AVAIL: PDR 1p. DOCUMENT TYPE CLNTU FPAct.86062500421 TASK! ODID: FORMAL REPT NO:

l FICHE 36824 237 36824 237 HIDS DOCKET NO: 05000000 0500044S 8606200057 Requests into re status of results rept for ISAP I.a.4 &

plans for reporting developments in future.Out-of= scope observations produced during execution of ISAP I a.2 may l have some bearing on ISAP I.a.4 results rept, FROM NOONAN,V.S. PWH Project Directorate 5 T08 COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities DOCUMENT TYPE: CLNTU FPAct 8606200057 ISSUED: 860613 AVAIL: P0R 6pp.

l TASK 00I03 FORMAL REPT Not DOCKET NO: 05000445 05000446 FICHEt 36651 237 36651 242 RIDS:

, 8/26/86 PAGE 2 U. S. NUCLEAR REGULATORY COMMISSION

. OCS PARTIAL RECORD FORMAT REFORT

8606190258 Ack receipt of e60516 Itr informing NRC of steps taken to correct violations noted in Insp Repts 50-445/A5-14 &
50-446/85-11

, FROM: JOHNSON,E.H. Region 4, Office of Director TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 960616 AVAIL: POR 2po. DOCUMENT TYPE: CLNTU FPAC 8606190258.

TASK: 0010: FORMAL REPT NO 00CAET NO: 05000445 0500044e FICHE: 36605 321 36605 347 RIOS: IE0:

t 8606230331 Ack receipt of d60506 Itr informing NRC of steps taken to correct violations noted in Insp Rept 50-445/86-02. Add 1 info i needed within 20 days ce change to interim fuel storage plan.

FROM: JOHNSON,E.H. Region 4, Office of Director TO: COUNSIL,n.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860618 AVAIL: P0R 2o0 DOCUMENT TYPE: CLNTU FPAC: 8606230331 TASK: ODID: FORMAL REPT NO:

00CnET NO: 05000445 FICHE 36636 260 36636 261 RIDS: IEOs 8606260288 Requests identification of changes made in Rev 2 to App E of Comanche Peak Review Team Program Plan forwarded by 860606 Itr. Info requested within 30 days to complete evaluation.

l FROM: NUONAN,V.S. PAH Project Directorate 5 TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas utilities

, ISSUED: 860619 AVAIL: POR 4po. DOCUMENT TYPE: CLNTU FPAC 8606260288 TASK: 00I0: FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE 36788 311 36788 314 HIDS:

8606260069 Requests continuation of periodic meetings on Comanche Peak Review Team activities.4eetings should be scheduled about

10 work days following filing of progress repts.

! FROM N 0 0 i1 A a , V . S . PWR Proj ect Directorate 5

TO: COUNSIL,W.G. Texas utilities Electric Co. (formerly Texas Utilities ISSUED: 860620 AVAIL: POR 400 DOCUMENT TYPE: CLNTU FPAC 8606260069 TASK 0010: FORMAL REPT NO:

DOCKET NO: U5000445 05000446 FICHE: 36783 217 36783 220 RIOS:

1 86062o0075 Informs of Commission approval of proposed rule re relief

! from GDC 4 requested in 85031d & 0715 Itrs. Final rule

  • published on 860411 & mod to 40C 4 made NRC action on l

exemption reauest unnecessary.PSAR review requested.

FROM: NOONAN,V.S. PWR Proj ect Directorate 5 TO COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860620 AVAIL: PDR 500 DOCUMENT TYPE: CLNTU FPAC: 8606260075 TASK ODID: FORMAL REPT NU l 00CKET NO: 05000445 05000446 FICHE 36783 232 36783 236 RIOS:

. - . , _ . _ __- __ . . _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . ~.__ _ _.__.__ ._ .. __ _ _ _ _ _

. 8/26/86 PAGE 3 U. S. NUCLEAR REGULATORY COMMISSION

. DCS PARTIAL RECORD FORMAT REPORT 8607020017 58 Generic Ltr 86-11 to all nonoower reactor licensees re distribution of products irradiated in research reactors.Svc list enc 1 FROM: MIRAGLIA,F.J. Division o'f Pressurized Water Reactor Licensing - B (pc TO: Atlantic City Electric Co.

ISSUED: 860025 AVAIL: POR 2500 DOCUMENT TYPE: CLNTU FPAC: 8607020017 TASK GL 86-11 0010: FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE: 36946 198 36946 222 RIDS:

8607010266 Grants util request for extension of time to respono to 860502 notice of violation 6 proposed imposition of civil penalty. Response now due on 800804 FROM: TAYLON,J.M. Director's Office, Office of Inspection and Enforcement TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 8o0626 AVAIL: POR lo. DOCUMENT TYPE: CLNTU FPAC: 8607010266 d

TASK ODIO: EA-06-009 FORMAL REPT NO:

DOCnET NO: 05000445 0500044o FICHE 36837 219 36837 219 RIDS:

8607070492 Ack receipt of e60523 Itr informing NRC of steps taken to correct violations noted in Inso Reots 50-445/85-13 &

50-446/85-09 FROM: J0MNSON,E.H. Region 4, Office of Director TO: C0dNSIL,d.G. Texas utilities Electric Co. (formerly Texas utilities ISSUE 0; 860o27 AVAIL: POR 2po. DOCUMENT TYPE: CLNTU FPAC: 8607070492*

TASK: ODID: FORMAL REPT NO:

DOCKET NO: 05000445 05000440 FICHE: 36902 136 36902 142 HIDS: IE01 8607030269 58 Generic Ltc 86-12 to all non-power reactor licensees autnorized to use highly enriched U fuel re criteria for unique purpose exemption from conversion from use of highly enriened U fuel.Svc list encl.

FROM: MIRAGLIA,F.J. Division of Pressurized Water Reactor Licensing - B (PC.

TO: Atlantic City Electric Co.

ISSUED: 860703 AVAIL: POR 23pp. DOCUMENT TYPE: CLNTU FPAC: 8607030269 TASK: GL 86-12 00!D: FORMAL REPT N0:

DOCKET NO: 05000000 0500044S 05000446 FICHE: 37064 001 37064 023 RIDS:

8607180040 Forwards request for addl info to continue review of util results rept for ISAP VII.b.2, " Valve Disassemoly."

FROM N00NA4,V.S. PdH Project Directorate 5 TO: CodNSIL,h.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860715 AVAIL: POR 500 DOCUMENT TYPE: CLNTU FPAC: 8607180040 TASK ODID: FORMAL REPT NO:

DOCKET NO: 05000445 05000400 FICHE: 37084 253 37084 257 HIDS:

1 O. 3. NUCLEAR REGULATORY COMMISSION DCS PaRIIAL RECORO FORMAT REPORT I

b;
q 8607210130 Informs of NRC intent to conduct licensing & senior operator requalification exams at facility during 860922-1003. Lists of required ret matis & space requirements enel.

FRON: GAGLIARDO,J.E. Region 4, Office of Director TO: SCOTT,A.B. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 960715 AVAIL: POR 7po. DOCUMENT TYPE: CLNTU FPAC: 8007210130 TASK: 00I0: FORMAL REPT NO:

DUCKEl NO: 05000445 FICHE: 37087 007 37087 013 RIUS: IE42 8307220373 Ack receiot of 660618 Itr informina NRC of steps taken to correct deviations noted in Inso Rept 50-445/86-05.

Implenentation of corrective actions will be examined during future insp.

FROM: JudNSON,E.H. Region 4, Office of Director TO: C0JmSIL,n.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860/16 AVAIL: POR 200 DOCUMENT TYPE: CLNTU FPAC: 8607220373*

TASn ODIO: FORMAL REPT NO:

DOChET N3: 05000445 FICHE: 37157 062 37157 073 RIus IE01 8607220392 For.ards inso Reots 50-445/66-16 & 50-446/86-13 on e60609-13.No violation or oeviation noted.

FROM: JOHNSUN,E.ri. Region 4, Office of Director To: C o .l N S I L , a . G . Texas Utilities Electric Co. (formerly Texas utilities ISSUEJ: 860/10 AVAIL: POR 200 DOCUMENT TYPE: CLt.TU FPAC: 8607220392*

TASA: 00I): FOR. MAL HEPT NO:

DOCKEI N3: 05000445 0500044o FICHE: 37156 348 37156 354 HIDS: IE35 i

8607220392 01 Forwards inso Repts 50-445/86-16 & 50-446/86-13 on 860609-13.No violation or deviation noted.

f FROM: JOHNSON,E.H. Region 4, Office of Director TO: C00NS1L,W.G. Texas Utilities Electric Co. (formerly Texas Utilities

ISSUED
660718 AVAIL: POR 200 DOCUMENT TYPE: CLNTU FPAC: 8007220392*

TASn 0013: FORMAL REPT NO:

DOCKET ND: 05000445 FICHE 37156 348 37156 349 Rips: IE35 8608080157 Forwards Inso Pepts 50-445/86-11 & 50-446/86-09 on 860505-08.No violation or deviation noted. Areas for improvement to SAFETEAM program identified during 850826-29 insp. Corrective actions dtd 8o0514 acceptanle.

FROM: JOHNSON,E.H. Region 4, Office of Director TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860731 AVAIL: POR 200 DOCUMENT TYPE: CLNTU FPAC: 8608080157*

l TASK 0010 FORMAL REPT Not DOCKET wo: 05000445 0500044o FICHE 37419 222 37419 228 RIOS: IE01 l

. 8/26/86 PAGE 5 U. 3. NUCLEAR REGULATORY COMMISSION

. OCS #ARTIAL RECuRu FORMAT REPORT 8608140187 Forwards comments ce review of three ISAPs re hot functional testing, receipt b storage oi purchased matl & onsite fabrication forwarded w/860513 ltr.

FROM: NOONAN,V.S. Pan Project Directorate 5 TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860731 AVAIL: POR 6pp. DOCUMENT TYPE: CLNTU FPAC: 8608140187 TASn: 0010: FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 37517 057 37517 062 RIUS:

8608200412 Informs that notice of 860821 meeting & agenda will be sent to util & intervenor,oer d60806 telcon.NRC proposal on grouping by disciplines of Comanche Peak Response Team results subj to litigation will be discussed.

FROM: NOONAN,V.S. PAR Project Directorate 5 TO: C0JNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 86000b AVAIL: POR 40o. DOCUMENT TYPE: CLNTU FPAC: 8608200412 TASK: UDI): FORMAL REPT NO:

DOCKET NO: 05000445 05000440 FICHE 37600 131 37600 134 RIOS:

8608150067 Ack receipt of e60616 Itr informing NRC of steps taken to correct violations noted in Inso Reots 50-445/85-16 &

50-446/85-13. Requests aadi into on Item A of notice of violation re failure of design review process.

FROM: J O H N S 'J N , E . H . Region 4, Office of Director TO: C0dNSIL,n.G. Texas Utilities Electric Co. (formerly Texas utilities ISSUED: 860612 AVAIL: POR 2po. DOCUMENT TYPE: CLNTU FPAC: 8608150067*

TASK: 00I0: FORMAL REPT NO:

00CnET NO: 05000445 0500044o FICHE: 37512 205 37512 231 RIDS: IE01.

8608160282 Ack receiot of e6u506 & 0707 Itrs informing NRC of stems taken to correct violations noted in Inso Rept 50-445/86-02 FROM: JOHNSON,E.H. Region 4, Office of Director TO: COUNSIL,n.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860813 AVAIL: POR 2o0. DOCUMENT TYPE: CLNTV FPAC: 8608180282*

i TASK: 00I03- FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 37526 223 37526 225 RIDS: IEOs 8608150140 Forwards SER on Tu! Diesel Generator Owners Group finaings &

recommendations stemming from program addressing operational i

& regalatory issues ce aiesel generator sets used for standoy emergency power for review.

FROM: N00NANav.S. Pnd Project Directorate 5 TO: C0JNSIL,d.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 860615 AVAIL: POR 500 DOCUMENT TYPE: CLNTU FPAC: 8608150140 TASK ODID: FORMAL REPT NO:

DOCKET NO: 05000445 050004.40 FICHE: 37520 221 37520 262 HIUS:

_ _ - - - _ - _ - _ - _ ~ - _ , _ - _ _ _ _ - - - _ - _ _ - _ - - - _ - _ _ _ - - _ _ - - - _ _ , _ _ . . - . - _ _ _ _ _

6/26/86 PAGE 6 U. 3. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPOR1 8606250347 Forwards Sateguards Inso Rept 50-445/86-23 on 860722-24 No violations or deviations notec.

' FROM: JOHNSON,E.H. Region 4, Office of Director TO: COUNSIL,W.G. Texas Utilities Electric Co. (formerly Texas Utilities ISSUED: 660818 AVAIL: POR 3po. DOCUMENT TYPE: CLNTU FPAC: 8608250347s TASK 0010: FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: HIDS: IE0c 4

I I

-. - --,_,-,n-- - - - - , - . , - - , . , _ , , . - - - - - . - - - - . . , , , . - - , , , - - . . . , . , - . . , .- - . - - - , _ , , . _ , . - . ----..w-,- - - . - - . = - . .-,.---r__-- . . - -

- 00LKETED USNRC

~

UNITED STATES OF AMERICA '86 SEP -2 N1:23 NUCLEAR REGULATORY COMMISSION -

4 F

BEFORE THE ATOMIC SAFETY AND LICENSING BOARI(O {E ggpp[

BRANCH In the Matter of )

, )

TEXAS UTILITIES ELECTRIC ) Docket Nos. 50-445 COMPANY, et _al. _

) 50-446

)

(Comanche Peak Steam Electric )

Station, Units 1 and 2) )

ii CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF PROGRESS REPORT AND ANNOTATED BIBLIOGRAPHY" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 27th day of August,1986:

Peter B. Bloch, Esq. , Chairman

  • Mrs. Juanita.Ellis Administrative Judge President, CASE Atomic Safety and Licensing Board 1426 South Polk Street U.S. Nuclear Regulatory Commission Dallas, TX 75224 Washington, DC 20555 Renea Hicks, Esq.

Dr. Kenneth A. McCollom Assistant Attorney General Administrative Judge Environmental Protection Division 1107 West Knapp P.O. Box 12548, Capital Station Stillwater, OK 74075 Austin, TX 78711 l

Nicholas S. Reynolds, Esq.

l William A. Horin, Esq.

. Elizabeth B. Johnson Bishop, Liberman, Cook, Administrative Judge Purcell & Reynolds Oak Ridge National Laboratory 1200 17th Street, N.W.

P.O. Box X, Building 3500 Washington, DC 20036 Oak Ridge, TN 37830 Joseph Gallo, Esq.

Dr. Walter H. Jordan Isham, Lincoln & Beale Administrative Judge Suite 840 881 W. Outer Drive 1120 Connecticut Avenue Oak Ridge, TN 37830 Washington, DC 20036

, _ . _ . . . , . _ . _ . , , . _ . - , . - . _ , , , . _ , , _ , , . _ , , ,_ y7_,,__.-. _._.,-~% _ . , . _ . , _ , _ , , , _ . - ~ _ , . _ _ _ _ . _ . . _ _ _ . - _ , _ _ - _ .

e Billie Pirner Garde Mr. W. G. Counsil Citizens Clinic Director Executive Vice President ,

Government Accountability Project Texas Utilities Generating Company 1901 Que Street, N.W. 400 North Olive Street, L.B. 81 Washington, DC 20009 Dallas, TX 75201 William L. Brown, Esq. Anthony Z. Roisman, Esq.

U.S. Nuclear Regulatory Commission Trial Lawyers for Public Justice 611 Ryan Plaza Drive, Suite 1000 2000 P Street, N.W. , Suite 611 Arlington, TX 76011 Washington, DC 20036 Robert A. Wooldridge, Esq. Lanny Alan Sinkin Worsham, Forsythe, Samples Christic Institute a Wooldridge 1324 North Capitol. Street 2001 Bryan Tower, Suite 2500 Washington, DC 20002 Dallas, TX 75201 James T. McGaughy GDS Assoc. Inc.

Mr. James E. Cummins 2525 Cumberland Parkway, Suite 450 Resident Inspector / Comanche Peak Atlanta, GA 30339 Steam Electric Station c/o U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board P.O. Box 38 Panel

  • Glen Rose, TX 76043 U.S. Nuclear Regulatory Commission Washington, DC 20555 William H. Burchette Esq.

Mark D. Nozette, Esq. Atomic Safety and Licensing Appeal Heron, Burchette, Ruckert Board Panel

  • a Rothwell U.S. Nuclear Regulatory Commission Suite 700 Washington, DC 20555 1025 Thomas Jefferson Street, N.W.

Washington, DC 20007 Docketing and Service Section*

Ofnce of the Secretary Robert D. Martin U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Roy P. Lessy, Jr. , Esq.

Wright & Talisman, P.C.

Robert A. Jablon, Esq. Suite 600 Spiegel & McDiarmid 1050 17th Street, N.W.

1350 New York Avenue, N.W. Washington, DC 20036-5566 Washington, DC 20005-4798 Thomas G. Dignan, Esq.

Ropes a Gray 225 Franklin Street Boston, MA 02110 Richard G. Bachmann Counsel for NRC Staff

- _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _