JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE SUlHARY OF OPERATIONS December, 1986 The Cycle VII - VIII refueling outage continued into the wanth of December. At-the beginning of the month, the reactor was critical and physics testing was in progress. Power operation began at 0309 en December 2.
The generator was taken off line on December 3 to perform th 3 turbine overspeed trip test. The unit returned to power operation on Decsber 4.
The following major safety-related maintenance was performed in the month of December:
1.
FCV-122, which controls charging flow, was overhauled.
2.
The nuclear instruments were recalibrated based on data obtained during the initial power ascension.
3.
4160V breaker puffer tube design changes were completed.
- 4. ' Miscellaneous corrective and preventive maintenance was performed on diesel generators.
87o316oo74 e61231
- = ^="""!@"
g il
e,'
OPERATING DATA REPORT DOCKET NO.
50-348 DATE 1/5/87 COMPLETED BY J. D. Woodard TELEPHONE nnen899-3156 OPERATING STATUS
- 1. Unit Name: J Seph M. Farlev - Unit 1 Notes December, 1986
- 2. Reporting Period:
- 1) Cumulative data since 2,b52
- 3. Licensed Thermal Power (MW:):
12-1-77, date of 860
- 4. Nameplate Rating (Gross MWe):
commercial operation.
829
- 5. Design Electrical Rating (Net MWe):
873.4
- 6. Maximum Dependable Capacity (Gross MWe):
827.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A i
N/A
- 9. Power LevelTo Which Restricted,If Any(Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
This Month Yr to-Date Cumulative
- 11. Hours in Reporting Period 744 8,760 79.632
- 12. Number Of Hours Reactor Was Critical 744.0 7,276.4 56,909.5 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 711.8 7,216.8 55,621.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Grors The-rnal Ener;y Generted (MWH) 1,716,656 18,456,126 141,327,668 559,646 6,059,664 45,363,044
'l7. Gross Electrical Energy Generated (MhH) t l
- 18. Net Electrical Energy Generated (MWH) 528.772 5.726.616 42.724.334
- 19. Unit Service Factor 95.7 82.4 69.8 95.7 82.4 69.8
- 20. Unit Availability Factor 85.9 79.0 66.8
- 21. Unit Capacity Factor (Using MDC Net) 85.7 78.9 64.7
- 22. Unit Capacity Factor (Using DER Net) 0.0 1.6 10.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period.Estirnated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved f
INITIAL CRITICALITY 08/06/77 C 8L9 / 77 I
INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPER ATION 12/01/77 12/01/77 t
(9/77)
DOCKET NO.
50-348 UNIT 1 DATE 1/5/87 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MONIH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Me-Net)
(Me-Net) 1 0
17 827 2
150 18 826 3
173 19 830 4
165 20 831 5
292 21 833 6
619 22 834 7
759 23 830 8
817 24 830 9
818 25 833 10 815 26 834 11 824 27 828 12 829 28 832 13 836 29 833 14 834 30 833 15 832 31 836 16 829 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21
r.
g UNIT Silt 11 DOWNS AND POWER REDUCTIONS DOCKET NO.-
50-348 s.
UNIT NAME J.M.
Fa r l ev-Un i t I DAIE I/5/87 COMPLETED BY Y n. Unodard REPORT MONTil December TEl.LPilONE r 70sT R99-515L 11
-l "L.
% un 5 f
c:
ee j
3 53 I I"5#
b't 84 Cause & Cunective
-5 Ni e '
Date E
3 0
5 g oc Event g7 a3 4,, go,,,
2 y
Ob d
un u gu P8 vent Hecurscuce yis$
Hepent #
u 2
6 1
010 861201 S
27.2 C
1 N/A N/A h/A The Cycle VII - VIII refueling outage continued from 10-03-86.
011 861203 S
5.0 B
1 N/A N/A N/A Unit shut down for turbine overspeed trip test.
1 4
i J
i l
l 4
l l
I 2
3 4
l-1.used Reason:
Method:
Exhibit G -Instsuctions S. Stheihiled A l'quipment Failure (Explain) 1 -Manual fos Picpasation of Data 11 Maintenance of Test 2 Manual Scram.
Esissy Shecis fos I.itensee 1
C Hefucting 3 Aulomatic Sceam.
Event Repius (1.l?R) File INURIL D Hegidatiny Resisicaism 4-Othes (Emplaisi) 0161) j l Opesaios Tsaining A license Examination I Adminiser.asive 5
i G Opciaisonal I nos (limplain) lislobis I Same Sinuce i
l's/11) ll Othes (linplain) i i
' [..
g/
'O Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 AlabamaPower nio V ce P sident January 12, 1987 Docket No. 50-348 D' ector, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very trul,
?
gj R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) d
/ pl 7
'hs 1