h Executive Offices 800 Boylston Street Boston, Massachusetts 02199 James M. Lydon Chief Operating Officer BECo Ltr. #87-009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Mr. William Kane, Director Division of Reactor Projects U.S. Nuclear Regulatory Commission 631 Park Avenue - Region 1 King of Prussia, PA 19406 Lice'nse No. DPR-35 Docket No. 50-293
Subject:
Response to Violation Identified in NRC Inspection Report No. 50-293//86-34
Dear Mr. Kane:
Attached please find our response to the violation described in NRC Inspection Report No. 50-293/86-34.
The inspection report also identified concerns in the areas of security, fire protection, response to adverse trends in emergency cooling equipment and surveillance scheduling.
Prior to issuance of this inspection report Boston Edison Company had recognized additional management attention should be applied to the security and fire protection areas. Accordingly, both the security and fire protection functions were separated from the Resource Protection and Control Group which was previously responsible for several other functions in addition to these areas.
This reorganization focuses specific management responsibility on security and fire protection by assignment of new managers (group leaders) solely responsible for oversight of each of these areas.
Response of the new Security Group Leader and his staff to several events requiring corrective action has been reviewed by upper management at Pilgrim Station.
In each case response has been thorough, prompt and complete.
Response of the new Fire Protection Group Leader (supported by the Nuclear Engineering Department) has been eqaally thorough as indicated by the positive steps which have been taken to resolve concerns on fire barrier and fire watch adequacy.
These positive steps will be discussed with Senior Regional Management on January 20, 1987 at Region 1 Headquarters.
ENCLOSURE CONTAINS Y
SAF EGUARD3 INFOnMATION UPrN SEPARAT!ON THG gd 8701300633 870120 PDR ADOCK 05000293 lll G
PDR j
i Mr. William Kane
. Pagt,2 Finally, the concerns regarding limited response to adverse trends identified in the condition of low pressure emergency cooling equipment and problems with surveillance test scheduling are receiving management attention and will be addressed in our response to Inspection Report No. 50-293/86-41.
Please do not hesitate to contact me directly should there be any further questions regarding these matters.
Very truly yodrs,
- hh M
ames M. Lydon cc: Dr. M. McBride
Attachment:
Response to NRC Violation Enclosure contains safeguards information. Upon separation this page is decontrolled ENCLOSURE CONTAINS SAFEGUARDS INfonMATIO:J UPCN SEPARATION Tld3 PAGf !G CE0calTROLL59 i