l
?
OPERATING DATA REPORT Dockct No.:'
50-309 Dato:
06/Jan/87 Completed By:
WILLIAM LIZOTTE Telephone:
207-882-6321 1.' Unit Name.......................................
Maine Yankee l
- 2. Reporting Period................................
December 1986
- 3. Licensed Thermal Power (MWt)....................
2630
- 4. Nameplate Rating (Gross MWe)....................
864
- 5. Design Electrical Rating (Not MWe)..............
825
- 6. Maximum Dependable Capacity (Gross MWe).........
850
- 7. Maximum Dependable Capacity-(Net MWe)...........
810 8.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHAN8ES
-9. Power Level to Which Restricted, if Any (Net MWe)
NO RESTRICTIONS
- 10. Reasons for Restrictions, if Any:
1 THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744.00 8.760.00
- 12. Number of Hours Reactor Was Critical...........
744.00 7.791.17 100.128.89
- 13. Reactor Reserve Shutdown Hours..................
O.00 O.00 O.00
- 14. Hours Generator On-1ine..
744.00 7.695.03 97.339.e9
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.~ O0
- 16. Gross Thermal Energy Generated (MWH)........
1.920.708.00 19.256.631.00 221.257.312.00
- 17. Gross Electrical Energy 72.701.010.00 Generated (MWH)........
642.910.00 6.461.290.00
- 18. Net Electrical Energy Generated (MWH)........
622.405.00 6.241.756.00 69.428.071.00
- 19. Unit Service Factor......
100.00 87.84 78.51
- 20. Unit Availabilty Factor..
100.00 87.84 79.26
- 21. Unit Capacity Factor l
(Usi ng MDC Net)........
103.28 87.97 70.86 i
- 22. Unit Capacity Factor (Using DER Net)........
101.40 86.37 69.01
- 23. Unit Forced Outage Rate..
0.00 1.97 6.49
- 24. Shutdowns Scheduled Over Next 6 Months Date Type Duration i
3/28/87 REFUELING OUTAGE 3/28/87-5/10/87
'25.
If Shutdown at End of Report Period, Estimated Date of Startup:
N/A 8703160030 861231 34 PDR ADOCK 05000309 R
%6 i
il'
...... ~...... -
?
e AVERAGE DAILY UNIT POWER LEVEL FOR DECEMBER 1986 Docket No.:
50-309 Unit:
Maine Yankee Date:
02/Jan/87, Completed By:
WILLIAM LIZOTTE Telephone:
207-882-6321 D _y Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net) 1 828 16 852 2
658 17 855 3
561 18 856 4
842 19 853 5
852 20 854 6
856 21 852 7
850 22 854 8
853 23 856 9
853 24 852 10 856 25 855 11 853 26 852 i
l 12 854 27 852 t
13 855 28 853 i
14 851 29 854 l
15 852 30 854-31 857 l
I t
1 t
.w...L
.a.. :...::
- -. -.. =
9 UNIT SHUTDOWNS AND POWER REDUCTIONS Dockst No.:
50-309 FOR DECEMBER 1996 Unit:
Maine Yankee Date:
06/Jan/87 Completed By:
WILLIAM LIZOTTE Telephone:
207-902-6321 i
Page:
1 of 1 l
Number L.R.
to 35%
i Date 861202 Type (1)
F Duration (Hours)
O R;ason (2)
F Method (3) 4 LER #
86-000-0 System Code (4)
AA Component Code (5)
BLOWER-Z THE CONTROL ROOM BREATHING AIR TRAINS PROVIDED INADEQUATE Ccuse and VENTILATION.
Corrective Action CHECK VALVES WERE REPLACED.
i l
l
- 1. TYPE:
- 2. REASON: (cont)
- 4. SYSTEM CODE:
j (F)orced F-Administrative Exhibit G-Instructions l
(S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for
- 2. REASON Licensee Event Report A-Equipaent Failure 3.. METHOD:
(LER) ~ File (NUREG.0161)
D-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
l l
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination i
I n
?-
b j
Docket No 50-309
. Unit Name Maine Yankee Date:
02/Jan/87 Completed by:
J.M. Taylor Telephone:
207-882-6321 Report Months December, 1986 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE At the begining of the month, the plant was at 97% power due to the use of motor driven main feedwater pumps.
On December 2nd, power was reduced to 35% due to an inadequate flow rate in both control room breathing air trains.
On December 3rd, the turbine driven main feedwater pump was returned to service.-
On December 3rd, power was increased to 97%.
On December 4th, power was increased to 99%.
On December 5th, power was increased to 100%.
l l
Power remained at 100% for the remainder Gf the month.
l l
f MAIRE HARHEE ATOMICPOWERCOMPARUe avavg,ay,?n"e%,
1 h
(207) 623-3521 e
January 8, 1987 MN-87-01 GDH-87-05 Office of Resource Management United States Nuclear Regulatory Commission Hashington, D.C.
20555 Attention: Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for December, 1986.
Very truly yours, HAINE YANKEE ATOMIC POWER COMPANY 0/./9 N G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/hbg Enclosure cc: Mr. Ashok C. Thadani Mr. Richard H. Vollmer Mr. Pat Sears Mr. Cornelius F. Holden d
s 8375L-GDH j
d,
-