Text
..
The Light NE f 11ouston Lighting & Power EO. Box 1700 liouston, Texas 77001 (713) 228-9211 August 29, 1986 ST-HL-AE-1734 File No.: G4.2 Mr. Vincent S. Noonan, Project Director PWR Project Directorate w5 U. S. Nuclear Regulatory Commission Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Additional Information Concerning the ACRS Report on South Texas, Units 1 & 2 -
Diesel Generator Fuel Oil Piping Vibration Testing
References:
(1) NRC letter to HL&P, V. S. Noonan to J. H. Goldberg, June 13, 1986, ST-AE-HL-90916 (2) HL&P letter to NRC, J. H. Goldberg to V. S. Noonan, June 27, 1986, ST-HL-AE-1697
Dear Mr. Noonan:
In our letter of June 27, 1986 (reference 2), Houston Lighting & Power Company (HL&P) committed to submit a test plan and schedule for vibration testing of the diesel generator fuel piping system between the diesel engine and fuel oil storage tank. This commitment is in response to the ACRS recommendation to perform tests to determine the effect of diesel engine vibration on the fuel oil piping (reference 1).
In accordance with our commitment, the test plan for vibration testing of the diesel fuel oil piping is attached.
The test plan lists piping lines that will be monitored for vibration.
Since there are minor differences in pipe routing, we plan to provide a test for all three diesels on Unit 1.
The test plan also includes the test acceptance criteria and type of instrumentation being used to perform the vibration test.
Since the layout of the diesel generators and associated fuel oil piping is the same for both of the South Texas Project (STP) units, the results of the testing and any required modifications on Unit 1 will also be applicable to Unit 2.
Therefore, testing will not be performed on Unit 2.
The tests will be completed in the fourth quarter of 1986. Any required modifications for Unit 1 will be completed in the first quarter of 1987 and by Unit 2 fuel load for Unit 2.
Li\\NRC\\zw.
k G609030030 860029 (h0 0
PDR ADOCK 05000499 3
A PDR i
i
Ifouston Lighting & Power Company ST-HL-AE-1734 File No.: G4.2 If you should have any questions on this matter, please contact Mr. M. E. Powell at (713) 993-1328.
Very truly yours, I
I M. R. Wipenburg Manager, Nuclear een ng HEP /bl Attachments:
Test Guideline for Vibration Testing of Diescl Generator Fuel Oil Supply Lines for South Texas Project Unit 1, August, 1986 Ll\\NRC\\zw.
Houston Ughting & Power Cannpany ST-HL AE-1734 File No.: G4.2 Page 2 cc:
Hugh L. Thompson, Jr., Director Brian E. Berwick, Esquire
+
Division of PWR Licensing - A Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S. Nuclear Regulatory Commission P.O. Box 12548, Capitol Station Washington, DC 20555 Austin, TX 78711 Robert D. Martin Lanny A. Sinkin Regional Administrator, Region IV Christic Institute Nuclear Regulatory Commission 1324 North Capitol Street 611 Ryan Plaza Drive, Suite 1000 Washington, D.C.
20002 l
Arlington, TX 76011 l
Oreste R. Pirfo, Esquire i
N. Prasad Kadambi, Project Manager Hearing Attorney l
U.S. Nuclear Regulatory Commission Office of the Executive Legal Director 7920 Norfolk Avenue U.S. Nuclear Regulatory Commission Bethesda, MD 20814 Washington, DC 20555 Claude E. Johnson Charles Bechhoefer, Esquire Senior Resident Inspector /STP Chairman, Atomic Safety &
c/o U.S. Nuclear Regulatory Licensing Board Commission U.S. Nuclear Regulatory Commission P.O. Box 910 Washington, DC 20555 Bay City, TX 77414 Dr. James C. Lamb, III M.D. Schwarz, Jr., Esquire 313 Woodhaven Road Baker & Botts Chapel Hill, NC 27514 One Shell Plaza Houston, TX 77002 Judge Frederick J. Shon Atomic Safety and Licensing Board J.R. Newman, Esquire U.S. Nuclear Regulatory Commission Newman & Holtzinger, P.C.
Washington, DC 20555 i
1615 L Street, N.W.
Washington, DC 20036 Citizens for Equitable Utilities, Inc.
c/o Ms. Peggy Buchorn Director, Office of Inspection Route 1, Box 1684 and Enforcement Brazoria, TX 77422 U.S. Nuclear Regulatory Commission Washington, DC 20555 Docketing & Service Section Office of the Secretary l
T.V. Shockley/R.L. Range U.S. Nuclear Regulatory Commission l
Central Power & Light Company Washington, DC 20555 P.O. Box 2121 (3 Copies)
Corpus Christi, TX 78403 Advisory Committee on Reactor Safeguards H.L. Peterson/G. Pokorny U.S. Nuclear Regulatory Commission City of Austin 1717 H Street P.O. Box 1088 Washington, DC 20555 Austin, TX 78767 J.B. Poston/A. vonRosenberg City Public Service Board P.O. Box 1771 San Antonio, TX 78296 Ll\\NRC\\ZW.
Revised 5/22/86