ML20212N087

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Feb 1987.Repts Revise Unit Shutdown & Power Reduction Tables
ML20212N087
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/09/1987
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212N090 List:
References
CON-NRC-87-025, CON-NRC-87-25 VPNPD-87-098, VPNPD-87-98, NUDOCS 8703120352
Download: ML20212N087 (1)


Text

m.

Wlsconsin Bectnc eomcouem 231 W. MICHIGAN,P.O. BOX 2046 M!LWAUKEE Wl53201 (414) 221-2345 VPNPD-87-098 NRC-87-025 March 9, 1987 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington, D. C.

20555 Gentlemen:

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of February 1987.

Please note the following correction to the monthly report for Point Beach Nuclear Plant, Unit 2, as submitted on February 6, 1987:

The " Unit Shutdown and Power Reduction" tables for that report listed entries numbered 9 and 10 for January 2 and 17, 1987, respectively.

These were the initial power reductions or shutdowns for Point Beach Nuclear Plant, Unit 2, for 1987 and should have been numbered 1 and 2, respectively.

Very truly yours, h'

~

/

C. W. Fay l

Vice President Nuclear Power Attachments copies to R. S.

Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector JN

' I 8703120352 870309

[DR ADOCK 05000266 PDR

_ - _