ML20212N087
| ML20212N087 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/09/1987 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20212N090 | List: |
| References | |
| CON-NRC-87-025, CON-NRC-87-25 VPNPD-87-098, VPNPD-87-98, NUDOCS 8703120352 | |
| Download: ML20212N087 (1) | |
Text
m.
Wlsconsin Bectnc eomcouem 231 W. MICHIGAN,P.O. BOX 2046 M!LWAUKEE Wl53201 (414) 221-2345 VPNPD-87-098 NRC-87-025 March 9, 1987 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington, D. C.
20555 Gentlemen:
Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of February 1987.
Please note the following correction to the monthly report for Point Beach Nuclear Plant, Unit 2, as submitted on February 6, 1987:
The " Unit Shutdown and Power Reduction" tables for that report listed entries numbered 9 and 10 for January 2 and 17, 1987, respectively.
These were the initial power reductions or shutdowns for Point Beach Nuclear Plant, Unit 2, for 1987 and should have been numbered 1 and 2, respectively.
Very truly yours, h'
~
/
C. W. Fay l
Vice President Nuclear Power Attachments copies to R. S.
Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector JN
' I 8703120352 870309
[DR ADOCK 05000266 PDR
_ - _