ML20212N009
| ML20212N009 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/28/1987 |
| From: | Loignon V, Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Barry L NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8703120309 | |
| Download: ML20212N009 (5) | |
Text
Director, Office.of Resource Management February Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V. C. SUMER I DATE 3/ 2/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 FEBRUARY 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
880 17.
878 2.
880 18.
878 3.
880 19.
878 4.
879 20.
878 5.
878 21.
877 6.
878 22.
877 7.
878 23.
878 8.
880 24.
837 9.
878 25.
804 10.
879 26.
803 11.
879 27.
802 12.
879 28.
790 13.
869 l
14.
866 15.
878 l
16.
878 i
l M
8703120309 870228 PDR ADOCK 05000395
/
R PDR gh\\
r d
Director, Office of Resource Management February Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET N0.
50/395 UNIT V. C. SUMER I DATE 3/ 2/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period:
_ February 1987 Gross Hours in Reporting Period:
672
- 2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 672$b i4i6$b 2b62$5
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 672.0 1416.0 21407.2
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 1,838,160 3,815,370 56,209,690
- 10. Gross Electrical Energy (MWH) 606,500 1,257,280 18,666,739
- 11. Het Electrical Energy Generated (MWH) 581,242 1,204,035 17,787,312
- 12. Reactor Service Factor 100.0 100.0 78.9
- 13. Reactor Availability Factor 100.0 100.0 78.9
- 14. Unit Service Factor 100.0 100.0 77.2
- 15. Unit Availability Factor 100.0 100.0 77.2
- 16. Unit Capacity Factor (Using MDC) 97.7 96.1 72.5
- 17. Unit Capacity Factor (Design MWe) 96.1 94.5 71.3
- 18. Unit Forced Outage Rate 0.0 0.0 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
Refueling, March 6, 1987, 62 Days
- 20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
N/A i
Director, Office of Resource Management February Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.
50/395 UNIT V. C. SUMMER I DATE 3/ 2/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 FEBRUARY 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power NONE
Director, Office of Resource Management February Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 3/ 2/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 FEBRUARY 1987 On February 1, 1987, the V. C. Summer Nuclear Station, Unit 1 was operating at approximately 100 percent power.
On February 24, at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br />, power was reduced to approximately 92 percent to remove the 'B' main feedwater pump from service.
On February 28, 1987, the plant was operating at approximately 92 percent power.
i-l l
10CFR 50.36 na Electric & Gas Company Dan n
Columbia SC 29218 Nuclear Opsrations (803) 748-3513 SCE&G
~
March 9, 1987 Director, Office of Resource Management U. S. Nuclear Regulatory Commission MNBB 7602 Washington, DC 20555 ATTN: Mr. Learned W. Barry
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 February Monthly Operating Report
Dear Mr. Barry:
Please find enclosed the February 1987 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specification 6.9.1.10.
If there are any questions, please call us at your convenience.
rytrlyyyrs,
\\
s l
l D. A. N uman MGC: GAL: DAN /bjh l
Attachments pc:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
K. E. Nodland E. C. Roberts R. A. Stough
- 0. S. Bradham G. O. Percival J. G. Connelly, Jr.
R. L. Prevatte D. R. Moore J. B. Knotts, Jr.
W. A. Williams, Jr.
INP0 Records Center H. R. Denton ANI Library J. Nelson Grace L. N. Carter i
Group Managers R. E. Rainear W. R. Baehr S. D. Hogge l
C. A. Price NPCF l
C. L. Ligon (NSRC)
File R. M. Campbell, Jr.
A 9
h'N
/
\\
\\