Forwards Test of Integrated Control Sys at Davis-Besse Nuclear Power Station to Determine Integrated Control Sys Response When Power Lost & Subsequently Restored, on 860317,resolving NRC Question Re Rancho Seco Dec 1986 Event
ML20212M795
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/26/1986
From: Gordon Skillman
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20212M797 List:
References
NUDOCS 8608270169
Download: ML20212M795 (1)


Text

,

"" OWNERS GROUP 4,.e e,.u ace ,e , =s e Taa sam cewe= osa -

Tena esse veney Ause,eeny sessemense s, a oune pe.e, company osense s. a. a pienesse power t , crysees sewee 3 . Warh8agmen runsas re , suppsy me s cru paesa.or coeperessen Tasks syseem seer. asunnsspes uunny commene menshe sese M M llM ~'"'*"**""'

II Working Together to Economically Provide Reliable and Safe Electrical Power Suite 220 August 26, 1986 7910 Woodmont Avenue Bethesda, Maryland 20814 (301)951-3344 hir. Dennis hl. Crutchfield Ass.istant Director Division of PWR Licensing B U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Loss / Restoration of Power to ICS/NNI Test Results from Davis Besse

Dear hir. Crutchfield:

At the January 7,1986 meeting of the B&W Owners Group Regulatory Response Group with the NRC to review the Rancho Seco event of Deccmber 1985, the B&W Owners Group committed to the performance of tests as appropriate to determine the effects of loss and restoration of power to the Integrated Control System /Non-Nuclear Instrumentation (ICS/NNI). In a subsequent April NRC meeting on the B&W Owners Group Safety and Performance Improvement Program ICS/NNI evaluation task, the B&W Owners Group also agreed to an NRC request to provide a copy of the report for tests performed at Davis Besse.

The B&W Owners Group I&C Committee has now completed its review of the Davis Besse test report, and a copy of the report is attached for your use. It should be emphasized that the results contained I

in this report are considered representative only for the Bailey Controls Company hiodel 820 systems such as that installed at Davis Besse.

I If you have questions on this report, please call me (717-948-8494) or Larry Statler at Toledo Edison (419-249-5000 x 7788).

Sincerely, i

~

b\

l G. K. bKillnT3n j Chairman, SPIP GRS/bh l Attachment

? 00h 8600270169 860826 6 /p DR ADOCK 0500