ML20212M672

From kanterella
Jump to navigation Jump to search
Transcript of 860819 Prehearing Conference in Rosemont,Il Re License for Low Level Waste Disposal Site in Sheffield,Il. Pp 1-86
ML20212M672
Person / Time
Site: 02700039
Issue date: 08/19/1986
From:
Atomic Safety and Licensing Board Panel
To:
References
CON-#386-517 SC, NUDOCS 8608270001
Download: ML20212M672 (200)


Text

- .

ORIG MAL O UlN11ED STATES l

, ] NUCLEAR REGULATORY COMMISSION l .

IN THE MATTER OF: DOCKET NO:

U. S. ECOLOGY, INC. 27-39 SC PREHEARING CONFERENCE O

LOCATION: ROSEMONT, ILLINDIS PAGES: 1-86 DATE: TUESDAY, AUGUST 19, 1986

/b 0\\

A E-FEDERAL REPORTERS, INC.

O OfficialReporters 444 North Capito1 Street Washington, D.C. 20001 l No b DOSk b$hNoo39 ~

l B PDR NATIONWIDE COVERACE

n .a w ..,. a = .. ... .,.-.c-.-..-w..~an.m......u...~~.-..~..c+. . . ~ . . . . . . - . . .

1 BEFORE THE

( \, 2 UNITED STATES NUCLEAR REGULATORY COMMISSION 3 Atomic Safety and Licensing Board Panel 4

5 6

7 Prehearing Conference In the matter of:

8 U.S. ECOLOGY, INC.

9 Sheffield, Illinois, Low-Level Radioactive Waste 10 Disposal Site.

11 Docket No. 27-39 SC 12 August 19, 1986 13 -

k,)

E O' Hare Holiday Inn ,.

14 Hadena Rooms A & B 5440 North River Road 15 Rosemont, Illinois 16 Pages 1 - 86 17 18 BEFORE:

l j 19 CHAIRMAN B. PAUL COTTER, JR.

JUDGE JERRY R. KLINE

(

l 20 JUDGE EMMETH A. LUEBKE I

j 21 22 23 .

24 g-() 25 1

_ . _ _ _ _ . _ _ _ - ~ . _ _ _ _ _ _ - = . - . - _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ - . . _ _

1 APPEARANCES:

h_j 2

On behalf of the Nuclear Regulatory 3 Commission, MR. ROBERT L. FONNER 4 MR. JOSEPH RUTBERG; 5 On behalf of U.S. Ecology, Inc.,

MR. MARK J. WETTERHAHN 6 MR. R. LEE ARMBRUSTER; 7 on behalf of the People of the State of Illinois, 8 MR. HENRY L. HENDERSON; 9 on behalf of the Illinois Department of Nuclear Safety, 10 MS. SUSAN B. HARMON.

11 12 hh 13 14 15 16 17 18 19 20 21 l 22 23 f 24 w r) v 25 2

Smiliwam Rmp@mVmg C$repromy

1 I N D E X 2

{m_)

3 EXHIBITS:

4 Number Page 5 1 43 6 2 43 7 3 44 8 4A 46 9 4B 46 10 4C 46 11 12 l

14 15 16.

17 18 19 l 20 21 22-23

(] 24 25 3

Smlinwrnm R@p@mMmg C@mapmmy

w m=_wam.u.-a-.wm - - w m u--_~.:.msu.a. m 1 CHAIRMAN COTTER: Will the hearing come 2 to order.

4-3 This is a hearing on a proceeding 4 involving the license for a low-level waste 5 disposal site at Sheffield, Illinois, which is 6 presently held by U.S. Ecology, Inc., which is the 7 successor to -- corporate successor to Nuclear 8 Engineering Company, Inc.

9 It would be useful, perhaps, to 10 recite the history of how we arrived at where we 11 are today; and if any of the parties want to jump

~

12 in during the course of this and amend or correct h 13 me, please feel free to.

14 In 1968 the prior corporation, Nuclear 15 Engineering Company, applied for a license renewal; 16 and under Commission Rules that application itself 17 was sufficient to continue its responsibility under 18 the license to operate the site at Sheffield.

19 In March of 1978 a Licensing Board 20 was established, and proceedings were begun; and 21 then in March of -- early March of 1979, the prior 22 corporation, Nuclear Engineering Company, filed a l

23 notice of withdrawal and termination of the

()

24 Sheffield license and moved to suspend the Licensing 25 Board hearing.

4 l

.. . _ , . m _ m ..,. .~ _.. .. _ . -

1 Subsequently the director of NMSS n

hj7) 2 denied the authority of NECO to terminate its 3 license unilaterally and issued a show cause order, 4 which was appealed to The Commission.

5 The Commission, in June of 1979, 6 upheld the director's decision and issued a notice 7 of hearing to the Licensing Board directing it to 8 consider the unilateral license termination action.

9 There was some discovery af ter -reman; 10 and I believe as a result of that discovery, there 11 were 15 site closure conditions which were 12 enunciated by the Nuclear Regulatory Commission h 13 Staff, which I'll refer to in the future as --

14 simply as "The Staff."

15 In September of 1980 the prior Atomic 16 Safety and Licensing Board issued a memorandum, an 17 order, which set out three issues. Those issues 18 were as follows: One, whether the applicant 19 possesses the source, by-product, or special nuclear 20 material at the Sheffield Site; two, whether U.S.

21 Ecology, the successor corporation, can unilaterally 22 terminate License No. 13-142-01 for activities at 23 Sheffield without affirmative action by The 24 Commission; and three, if U.S. Ecology cannot f) e%dr 25 terminate its license without affirmative action by 5

Sullivan Reporting Company

mmg=2 ~.u.x..m  ;.- .w amc..m.mau w. u.. n.conec==vaz=rev . .... m . - m 1 The Commission, what conditions, if any, are

- (,, 2 appropriate to impose an order to protect the public 3 health and safety as well as the environment before 4 the licensee may quit the site.

5 During the period 1980 to 1982, there 6 were joint motions by the parties to continue the 7 Licensing Board hearing on the grounds that they 8 were negotiating a settlement, and that such 9 rasolution of proceedings was favored by Commission 10 Rules; and those motions to continue were granted.

11 In 1982 the Nuclear Waste Policy Act 12 of 1982 became law; and Section 151 of that act 13 provides that DOE, I believe, on a discretionary

~~

14 basis can take possession of certain low-level 15 wasts sites.

16 In September of 1983 The Board was 17 reconstituted, and I became Chairman; and thus, the 18 Licensing Board hearing in this proceeding was 19 completely reconstituted, that is the three 20 original members have all been replaced.

21 In November of 1983 the parties filed 22 a joint report. In that joint report, it was 23 indicated that The Staff and U.S. Ecology had 1

1 t

(e%j 24 agreed on 11 of 14 --

the 14 technical conditions i 25 originally set by The Staff for closure of the 6

C%Ulfwva_RhwsrahnlDarmmnmsv

ra m .u_ aev.: . o,. r.w. .m, z . s,. c. m .m m._ . . .m 1 sites.

( 2 Three technical conditions remain to 3 be resolved. And if I recall correctly, they were 4 the question of leakage from the trenches, the 5 permanent coverage to be put over the site, and the 6 question of environmental monitoring; and a fourth 7 issue, which I believe may be the underlying issue 8 at the core of all this, was still unresolved, and 9 that is the institutional question of who was going 10 to pay for the cost of continued maintenance of the 11 site. I believe that that issue was in dispute 12 primarily between U.S. Ecology and the State of 13 Illinois. ,

14 The report indicated that there had 15 been some -- well, there had been a series of 16 delays during the course of this period from 1980 17 up until the present, some of them caused by the 18 passage of the Nuclear Waste Policy Act, some of 19 them caused by the change in some of the top 20 officials of the state, and there have been a 21 number of changes in the attorneys representing the 22 parties.

23 There were subsequent reports filed

() 24 in July of 1984, July of 19 -- and July of 1985, Q..

25 joint status reports indicating continuing efforts 7

u ,wu .. - .= m - - m .m v~ ~. - - - - _ s .. . . . - . ~ _ . . , _ -

1 to negotiate a settle -- a settlement of the issues b

~ :. >

2 involved.

3 And I believe -- I'm not sure when 4 Illinois originally applied for Agreement State 5 Status, but that became an issue during the course 6 of 1985.

7 In April of 1906 the fourth joint 8 status report of the parties was filed, in which 9 they indicated that they were awaiting the issuance 10 by the Department of Energy of procedures under the 11 Nuclear Waste Policy Act, which procedures were l'2 said to be due out in the near future.

O The report also indicated that there

) 13 ,

14 were direct negotiations between U.S. Ecology and'~

15 Illinois. Those negotiations had been resumed; and 16 that if they failed to produce a settlement, that l

l 17 the parties desired a prehearing conference to be l

18 scheduled in July.

19 In June The Board issued an order 20 inquiring as to the status of Illinois's application 21 for Agreement State Status and three alternate dates 22 for conducting a prehearing conference.

23 I might note parenthetically that the l

24 response to that order with respect to the three 69( ) 25 dates for the prehearing conferences was, in my 8

w= w..m xav:.. m = .. . ~ . . .~. - -. _ - _

1 opinion, a bit cute. When we ask for three dates,

/~

We have (kSl r

.o' 2 we don't want them all in the same week.

3 conflicting schedules that create problems.

4 But nevertheless, we've got three 5 dates in the same week; and we've conceded, given 6 the concerns of the parties.

7 In August -- on August 1 of '86, The 8 Board issued a memorandum and order in which it 9 indicated the factual and legal issues that it felt 10 it should -- should be addressed at this prehearing 11 conference.

12 Is there anything that any of the h 13 parties would like to add to that?

~

14 MR. FONNER: (Indicating.)

15 CHAIRMAN COTTER: Yes.

16 MR. FONNER: I think that the one state-l l 17 ment you made should be modified.

18 There is.no application by the State 19 of Illinois presently at the NRC for Agreement l 20 State Status. They supplied a draft of their --

l 21 what they would submit back in the fall of '85.

22 The formal application has not yet 23 been received.

() 24 CHAIRMAN COTTER: Thank you very much.

25 Maybe we ought to identify the 9

w .. m m _ % _ . - ~ ~

1 parties for the record. If we could start with

({.,) 2 U.S. Ecology.

3 MR. WETTERHAHN: Good morning.

4 My name is Mark Wetterhahn from the 5 firm Conner & Wetterhahn. With me is R. Lee 6 Armbruster, general counsel of U.S. Ecology.

7 We are representing U.S. Ecology in 8 this proceeding.

9 CHAIRMAN COTTER: Thank you, 10 Mr. Wetterhahn.

11 MR. HENDERSON: I am Henry L. Henderson, 12 Assistant Attorney General, the State of Illinois, h 13 representing the People of the State of Illinois in 14 this proceeding; and with me is Susan B. Harmon, 15 special assistant attorney general working with me 16 on representing The State in this matter.

j 17 CHAIRMAN COTTER: Would you spell the 18 latter name?

19 Yours sounds like it spells well.

20 MR. HENDERSON: Henderson, H- e- n- d- e- r- s -

21 o-n; and Susan Harmon,-H-a-r-m-o-n.

22 CHAIRMAN COTTER: Thank you.

23 MR. FONNER: Robert Fonner, NRC.

MS. DUNKELMAN: Maxine Dunkelman, NRC,

() 24 25 D-u-n-k-e-1-m-a-n.

10

w- .

. . u r . ._ .r + .. .. . .

. z..w.,swas..w. m a.w..,-a.n -m- _ w ~ m 1 MR. FONNER: Maxine is the project

,. f

(;:jr} 2 manager for the Sheffield Site.

3 CHAIRMAN COTTER:- You're counsel for NRC --

4 MR. FONNER: Yes.

5 CHAIRMAN COTTER: -- Mr. Fonner, correct?

6 And, Ms. Dunkelman, you indicated you 7 were a geologist?

8 MS. DUNKELMAN: Well, project manager 9 for Sheffield.

10 MR. RUTBERG: Joseph Rutberg, 11 representing the NRC Staff.

12 CHAIRMAN COTTER: Thank you, Mr. Rutberg.

) 13 Is there anything further to add in 14 addition to Mr. Fonner's comment?

15 Was there a question back there?

16 MR. CANNON: No.

17 The parties represented, I'm John 18 Cannon, representing the Chicago Chapter of the 19 American Nuclear Society.

t 20 CHAIRMAN COTTER: You're not a party to 21 this proceeding, Mr. Cannon; is that correct?

i 22 MR. CANNON: Yes, The Chapter was 23 admitted as a party intervener; however, I would 24 note that since the focus of the proceeding has 25 shifted to the Nuclear Waste Policy Act and 11

me w.- m,.. ..._m -

.. . . . . . _ . . . _ . _ _ . _..._...m, m ._....___ _. m .mm_. .._ - -

e 1 interstate agreement'on low-level disposal sites, (f 2 The Chapter's interest in the Sheffield proceeding, 3 of course, is diminished almost'to the vanishing 4 point.

5 CHAIRMAN COTTER: Was-it your intention 6 to take an active part in these proceedings --

7 MR. CANNON: No.

8 CHAIRMAN COTTER: -- or are you just 9 here as an observer?

10 MR. CANNON: Yes, to see --

so that I 11 can report back to the leadership and see where

~

12 things are; and perhaps there would be a motion to

(^)h 13 vithdraw in the near future.

~

14 CHAIRMAN COTTER: Thank you.

15 Is there anyone else who still 16 retains party status in this proceeding?

17 Are there any further enlargements or l 18 amendments to the initial *catement describing the 19 history of the procer d' > g?

20 All right. There being none, let's 21 turn to The Board's memorandum and order of August 22 1, which beg ins with factual questions asked by --

23 of the parties.

24 The first is the status of negotia-0( ) 25 tions among the parties, including a list of issues 12

e .,a..mv.-.. . . . ,. ,. ,- --. - _ _ .-. -

1 resolved and. issues now remaining to be resolved.

O .

2 Is there a writing in connection with

( .s J 3 those -- that list, or are we going to get a verbal 4 report?

5 MR. WETTERHAHN: No, sir, there is no 6 writing.

7 Mr. -- The State has agreed to begin 8 the response to Item No. 1.

9 MR. HENDERSON: Item No. 1, which is the 10 status of negotiations among the parties, as you 11 stated in your overview, our most recent joint 12 report did indicate that negotiations on settlement h 13 had substantially resumed among -- between The 14 State and U.S. Ecology.

15 In April of this year, a document 16 from The State advancing on the negotiation was 17 submitted to U.S. Ecology. Since then a very 18 intensive period of negotiation involving the 19 exchange of documents advancing the negotiations 20 and meetings have occurred.

21 The negotiations between The State 22 and U.S. Ecology have substantially advanced since 23 April, and the negotiations are carefully addressed f) 24 to the 15 points that the NRC Staff identified for

/

25 appropriate site closure.

13 Sn11iwan Repsrting C@ppagy_

__ - - ,., _ - _ - - - - _ . - + - . - -- -._ . _

1 The parties have identified agree --

'h .

2 principals of agreement, areas of agreement in

(~}s) 3 principal, and are narrowing areas of disagreement 4 on technical and matters of principal.

5 The advance on this has been made 6 possible by substantial compromise by both parties 7 on their positions and is --

and these compromised 8 positions are very much taken with --

on condition 9 of the settlement agreement.

10 The state we are in at present is 11 agreeing to a meeting next week between technical 12 staff and thereafter with the legal staff to

) 13 further narrow the areas of disagreement, producing

  • n' . . .

. 14 a document which we will submit to the NRC Staff 15 for their review.

16 CHAIRMAN COTTER: When is the second 17 meeting?

18 MR. HENDERSON: The second meeting will 19 be the following week. The actual date has not 20 been set as of yet, but there are two meetings 21 agreed to in principal.

22 To produce a document to be submitted 23 to the NRC Staff for their review and to bring them 24 into negotiations more substantively, particularly 25 on the areas where we consider it absolutely 14 Sull5wan Rapwt@g C@mnpromy

m--._--.~_.._.-- _ _ -._ _ . . . . .

1 necessary to have their input and agreement could not be had between the parties absent their input.

( 2 3 CHAIRMAN COTTER: Would those --

would 4 that document resolve all issues?

5 MR. HENDERSON: I seriously doubt that 6 it will resolve all issues.

7 What it is to do is to identify all 8 of the issues rather than resolve.

9 CHAIRMAN COTTER: My goodness, w e ' v,e had 10 five years to do that.

11 MR. HENDERSON: Well, identify the 12 issues that are still in disagreement, not --

h 13 CHAIRMAN COTTER: You've had five years 14 to do that too.

15 I understand, Mr. Henderson, that --

16 MR. HENDERSON: I'm not exactly sure I 17 agree with that.

18 CHAIRMAN COTTER: -- you haven't been 19 here the whole time, but...

20 MR. HENDERSON: Well, I think that in 21 five years we have identified not only the issues 22 in disagreement, but we've also identified areas 23 where we are no longer in disagreement, substan-

/) 24 tially so since April of this year, so I --

25 CHAIRMAN COTTER: I suspect if you're 15 STllilan_Reperdsg_C$nmp50py

..x..- . a - o .: r. . w - . . . . . . . . . . - . . .~ _

1 all locked in a room for a month, that you finish p

(},_) 2 the whole thing.

3 MR. HENDERSON: That is our hope, that 4 we will be able to finish it in the very near 5 future.

6 MR. WETTERHAHN: Let me add that I 7 believe we are in a critical stage.

8 We are in a stage which will determine 9 in the next month or two either the specific terms 10 of settlement on all the issues or a decision that 11 settlement is not possible.

~

12 Substantial progress has been made, h 13 and I will be the first to admit there were a 14 number of diversions along the way which didn't 15 prove to be fruitful, but we are --

16 CHAIRMAN COTTER: I don't speak for my j 17 colleagues, r. ~'etterhahn -- we haven't consulted l

18 on this -- but for myself personally, I'm hearing 1

19 the same language I've been hearing in reports now i

i 20 for five years.

21 JUDGE LUEBKE: Would it be possible 22 today to name these things that are going to be 23 discussed next week?

! () 24 Are there ten items or a thousand l (3'?E If there are ten, we could put them in the I 25 items?

16 Sulliwan RepwMmg C@riopmmy

_ ~ . . _ . . . . . . _ . . . . . . _ . _ _ _ . . . _ _ - _ . .__ .. __ > -

1 record.

g- MR. WETTERHAHN: Well, yeah -- w e -- I r,g,; 2 3 don't think it would be helpful to put them in the 4 record.

5 I would characterize them as fewer 6 than ten.

7 These are critical issues. A number 8 of the technical issues have been resolved, but 9 there has -- you can imagine a number of financial 10 issues which would be the last to be resolved once 11 the other technical issues were resolved, and we 12 are at that stage that we have identified them; h 13 and the parties are supplying the information to 14 determine on those critical issues whether the 15 settlement can be reached.

16 CHAIRMAN COTTER: Let me go-back to the 17 November '83 report, which indicated that there 18 were three technical issues remaining to be 19 resolved; and I think they had to do with trench l 20 leakage and trench coverage and environmental 21 monitoring.

22 Are they still outstanding, or are 23 they resolved?

l

) 24 MR. WETTERHAHN: Subject to a final

.)

25 settlement on all of the issues.

! 17 l

i Sullnran RmpereWimg Cemnpmmy

a:. w e m - ..~..wm.......~.....~.-~~~w.m 1 We have made considerable progress r.

-2 with regard to resolution. You cannot say that it (h-

-3 is resolved until you have the final guarantees in 4 place that are satisfactory to The State and to The 5 Company with regard to the assurance necessary for 6 long-term resolution.

7 But yes, considerable progress has 8 been made in those areas.

9 CHAIRMAN COTTER: Is what I'm hearing I 10 here that the bottom line is how much is it going 11 to cost, and who's going to pay for it?

12 ,

MR. WETTERHAHN: I believe that's always h 13 the bottom line, and particularly here where --

I 14 guess the NRC is used to dealing with regulated 15 companies.

16 U.S. Ecology is a publicly held 17 company; it's unregulated.

18 And yes, that is the bottom line 19 always; but I want to assure The Board that 20 considerable progress has been made and consider-21 able concessions made on the part of U.S. Ecology 22 and by The State.

23 I can't sit here and say to you that 24 settlement is assured, but I think the parties of 25 are mind -- are of a mind at this point in time 18

_,,a_,, .- - _ . - . . - . . --

r 1 that settlement will be decided very shortly, 2 whether it can be completely consummated or whether

(

3 we'll have to rely on the- Licensing Board to settle 4 the issues before it.

5 It is o f -- at a critical stage.

6 JUDGE LUEBKE: At which time there will 7 be names and words we can understand?

B MR. WETTERHAHN: Any settlement will be 9 in writing with the -- will have the agreement of 10 the parties; and the present plans are to submit it 11 to the Licensing Board, of course, for its approval.

12 JUDGE LUEBKE: And revelation of more 13 details would interfere with the negotiation, that

~ ~ '

14 is today, revelation? ,

15 MR. WETTERHAHN: .Yes, sir, we believe so.

16 MR. FONNER: May I? .

17 CHAIRMAN COTTER: I was going to ask The 18 Staff, any comment on the --

19 MR. FONNER: The Staff has not been an 20 active participant in the negotiations that have 21 taken place so far this year; but we have reviewed 22 a number of the documents which have been exchanged 23 between U.S. Ecology and Illinois, particularly the 24 April outline of settlement of The State and the 25 June response of U.S. Ecology.

- 19 i

l Smil5wom _Rmp@rvG$@g C@@peny

n u m --

1 The prelim -- 'the analysis of The Staff of these documents indicates, I think,

( 2 3 substantial progress in practically all areas.

4 There are --

5 CHAIRMAN COTTER: Mr. Fonner --

6 MR. FONNER: There are --

7 CHAIRMAN COTTER: Is there any difference 8 between the phrase " substantial progress" as you 9 use it now and as it has been repeatedly used since 10 19807 j

11 MR. FONNER: Yes, I think so.

l 12 I think the circumstances that have h l' 3 developed with respect to Illinois opting to become 14 an Agreement State have forced the parties to get~

i 15 down to the business, and I think that the substan-16 tial progress that I referred to really means 17 substantial progress in resolving the differences 18 between The State and U.S. Ecology in the areas 19 where they were fairly -- fairly far apart.

4 20 The Staff has some differences in the 21 areas that you referred to. I don't think that the f

22 trench leakage problem is really a difficult issue 23 any more.

j 24 The cap cover and the monitoring-still 25 present problems to the NRC Staff, as I'm sure it i

2 20 Sulliwr03LRaixers#artCMi)Plaasy

. . . ...a: >........--..~._.....-.....a...~...- ..a+. u. a- ~ . . - --

1 does between U.S. Ecology and The State; but we 3

(jj 2 don't see anything in those particular areas that, 3 with the spirit of compromise, can't be resolved in 4 short order if the parties sit down together and --

5 with good intentions and a villingness to compromise.

6 CHAIRMAN COTTER: If the parties submit --

7 let me back up.

8 If you complete your two meetings in 9 the next two weeks, how long will it take you to 10 submit a report to the NRC?

11 Mr. Henderson?

12 MR. HENDERSON: Well, the goal is to h 13 have a document drafted at the --

at.that second 14 meeting for submittal to the NRC; and within that 15 seve.ral days after that meeting, have a document to 16 the NRC Staff.

17 MR. WETTERHAHN: Let me clarify it by --

18 there's more than one NRC.

19 By the "NRC," we mean the NRC Staff. -

20' MR. HENDERSON: Right.

21 MR. WETTERHAHN: And we would intend to 22 keep this in the same level as we did.

23 It would be a settlement document f ), 24 which would be submitt46. informally to the NRC 25 Staff.

21 Sulliwan Reporting Company

w....m.._._,_u..m.._., . . . . . . . _ , _ _ _ _ _ _ . . _

1 CHAIRMAN COTTER: Right, I understand

() 2 that.

3 So the informal docu -- let me put 4 some dates to this, if I may.

5 Your technical staff meeting will be 6 completed by Saturday, August 30; is that correct?

7 MR. HENDERSON: That is our intention.

8 MR. ARMBRUSTER: Yeah, we believe that 9 it will.

10 CHAIRMAN COTTER: And the second meeting 11 will be completed by Saturday, September 6.

12 MR. HENDERSON: That is our intention.

r. h 13 CHAIRMAN COTTER: L e t,' s see if we can

~

14 strengthen your intentions.

15 And then how long would it take to 16 get the draft document to the NRC7 17 MR. HENDERSON: Our understanding is 18 that that September -- Saturday, September 6, is 19 the -- we will have a document in principal, which 20 will then be submitted in the follow -- early the 21 following week.

22 MR. ARMBRUSTER: I would assume that 23 we'd be able to get it to the staff by Saturday, f'T 24 September 13, certainly before that.

25 MR. HENDERSON: Certainly before that l

I 22 Sullivan Rennrtinglomnaw . _ _ _ _ ____

1 time, in that week.

(7 ) 2 JUDGE LUEBKE: By "in principal," will 3 that mean that you parties have signed the bottom 4 line and submitted it to the NRC for some review?

5 MR. HENDERSON: On September 6th -- in 6 principal what I mean is that we would have a -- we 7 .will have agreed on what we would be submitting and 8 on most of the language.

9 What would take that following week 10 is to get that draft finalized for submission.

11 JUDGE LUEBKE: You keep using the word 12 " draft," and it puzzles me because that means to me

) 13 you're not going to sign the bottom page.

14 MR. HENDERSON: Well, this is -- we are 15 in negotiation.

16 JUDGE LUEBKE: Yeah.

17 MR. HENDERSON: What we are submitting 18 to the NRC Staff is a document which is not a 19 settlement which we have initialed and is final.

20 It is for -- for them to review and 21 give-us their responses as to what they respond to 22 what we are agreeing to.

l 23 JUDGE LUEBKE: And to clarify this thing, 24 what role does the NRC have?

25 Do you review and approve?

23 Sullivan Rersortins Comaany

1 MR. FONNER: Our position is that the (f 2 settlement which would be submitted to This Board 3 for its imprimatur has to-include the agreement of 4 all the parties, including the NRC.

5 We have a responsibility under the 6 Atomic Energy Act to ensure that the closure 7 CHAIRMAN COTTER: Well, the bottom -- w e 8 understand all that.

9 MR. FONNER: Yeah.

10 CHAIRMAN COTTER: The bottom line is --

11 MR. FONNER: And we would have to sign 12 off on it.

13 CHAIRMAN COTTER: -- that these parties h

14 are being conditional about this because you may 15 not be satisfied that the conditions --

16 MR. FONNER: That is correct.

17 CHAIRMAN COTTER: -- have been satisfied, 18 and you may require something further.

19 MR. FONNER: We may propose to come back 20 with a laundry list of the items that we find 21 objectionable, that we find acceptable, and offer 22 suggestions for rationalizing the remaining areas 23 of dispute between the NRC Staff and Illinois and 24 U.S. Ecology.

p} (

25 JUDGE LUEBKE: That would constitute the 24 Smilivan Rettorting Comrtany

m-s~._-.~..-..____=_____ _

l i

~1 second round, beginning of the second round?

h) 2 MR. FONNER: Yes, sir.

3 CHAIRMAN COTTER:- That's my next question.

4 How soon do you come back with your 5 response to the draft document?

6 MR. FONNER: We would -- we think we 7 would need ten working days.

8 CHAIRMAN COTTER: So that would take you 9 to --

10 M R .- FONNER: Two weeks.

11 CHAIRMAN COTTER: -- Saturday, September 12 [2nd -- 27.

13 MR. FONNER: It would be helpful if that h

~

14 would be embodied in an order issued by This B o a r d'.

15 CHAIRMAN COTTER: Pardon me?

16 MR. FONNER: It would be helpful if that 17 would be embodied in an order by The Board.

l

18 CHAIRMAN COTTER
We're here to help.

! 19 If I understood you earlier, 20 Mr. Fonner, you indicated that you felt fairly well-21 informed about the discussions between The State j 22 and U.S. Ecology up to this point.

23 MR. FONNER: I think so, with one l

24 exception. We have not yet seen The State's 25 counter-proposal to the Illinois -- to the U.S.

25 Sullivan Recordmg Cormpromy

.a.a.-..~....---.. - . . . . .. -. . . -

1 ' Ecology June proposal.

r

(;} / 2 And, of course, we haven't partici-3 pated in any of the face-to-face meetings, so we 4 don't know what went'on at 'those meetings.

5 CHAIRMAN COTTER: Is there a particular 6 reason for that?

7 Would it not be helpful to have The 8 Staff involved in this?

9 MR. HENDERSON: Well, there was a some 10 timing -- there are two issues on that, the -- as 11 far as having The Staff involved in the face-to-12 face negotiations at this stage.

h 13 It has been our understanding that 14 the -- it would be better for U.S. Ecology and The 15 State, particularly given the large importance of 16 the fourth item you've mentioned, the institutional 17 control of the site which concerns The State and 18 U.S. Ecology more than The Staff, and which we 19 think the entire agreement pivots on very definitely, 20 to have those areas agreed to in principal, which 21 allow the compromise on the other areas to which 22 the NRC party --

23 CHAIRMAN COTTER: If you can satisfy

(')

24 their technical requirements, then you think you g*,+#

25 can work a deal.

26 Sullivan Reporting Cemprnmv _

p . :. . c ,. ,. - - - ~,...,.---.--a==_-.--...._.--.----~.----

1 Is that the bottom --

t]'j j 2 MR. HENDERSON: We think that if we can 3 work a deal on Technical Issue No. 4, the institu-4 tional arrangements, then we can probably work a 5 deal on the -- their requirements relating to the 6 15 points.

7 MR. ARMBRUSTER: I think in all candor, 8 we also ought to state that there are issues that 9 are peculiarly between The State and U.S. Ecology 10 that don't relate necessarily to The Staff's review 11 or approval process, and those issues are still 12 outstanding as well; but they are identified, and h 13 they are not numerous.

14 MR. WETTERHAHN: For the information of 15 The Board, there is an ongoing state proceeding 16 involving similar issues.

17 CHAIRMAN COTTER: The Circuit Court has 18 retained jurisdiction, or is this something --

19 MR. WETTERHAHN: No.

20 CHAIRMAN COTTER: -- new?

21 MR. WETTERHAHN: That is the proceeding; 22 and any settlement, as a matter of course, would 23 have to settle all issues between the parties.

24 The Staff's 15 points have always (J) 25 been at the heart of the negotiations.

We've 27 Sulliwan ReporMmg Cermpmmy

1 always recognized that the NRC Staff would have to

(]) 2 be satisfied, and the negotiations are aiming 3 towards that.

4 It's -- we have recently tried to 5 keep The Staff counsel in fo rm ed; but because of 6 vacations and a number of factors -- illnesses --

7 staff counsel --

staff counsel here was in fo rm ed  ;

8 generally this morning with regard to a more 9 specific summary of the status of the negotiations; 10 and we, in turn, were made aware of The Staff's 11 concerns with regard to a couple of the technical 12 issues.

So there is an understanding of the l 13 14 positions of The Staff, although they have not been' 15 involved in the direct recent f a c e-to- f ac e negotia-16 tions.

17 CHAIRMAN COTTER: Okay.

18 I realize that my next question 19 relates a little bit to -- has kind of a crystal 20 ball quality to it, but how soon -- assuming that 21 you get the-NRC Staff response of September 27, how 22 soon are The State and U.S. Ecology prepared to I

23 respond to that to determine -- it seems to me the 24 determinations would be alternative: One, that The g

25 Staff conditions would be unsatisfactory to one or 28

. _ ..____ ___._ _ _ . _ -. _ __ _ Sulliy_a n_ Repo rtin g Com pa n y. _ _ _

1 the other of your or two, that they would be satisfactory in that you -- where you could make (f 2 3 whatever mild adjustments you needed to.

4 How soon can you reach that kind of a 5 decision?

6 MR. WETTERHAHNs I believe it's practical 7 to do it -- I'm looking at a calendar now -- leaving 8 about three weeks to iron out all the differences, 9 if there indeed are any differences.

10 I'm looking at a date of October 18th.

11 JUDGE LUEBKE: And if The Staff agreed 12 to what they got, said it was satisfactory, things h 13 would move fsster, wouldn't it?

14 You'd' eliminate the three weeks.

15 MR. WETTERHAHN: Certainly.

16 We would not wait until three weeks 17 before the formal interchange on paper. There 18 would*be discussions during this period, and 19 hopefully they could make us aware even before the 20 final period of items which are causing them 21 difficulty with regard to the settlement.

22 I think that three weeks is a reason-23 able period of time, considering these informal

() 24 interchanges that are likely to occur.

25 MR. FONNER: I would like to suggest 29 Sulliwam Rep @fXSmg C@fRpomy

m..____ .__ _ _ . . . _ _

1 maybe an alterna -- not an alternative to that, but 2 perhaps if Illinois and U.S. Ecology could respond

(-]'M) 3 or take just a minimum amount of time to analyze 4 and review The Staff's comments, which they would 5 receive on or about September 22nd, and then we 6 hold a meeting promptly within -- within a week, 7 rather than...

8 CHAIRMAN COTTER: You're anticipating me.

9- I agree.

10 MR. FONNER: Rather than wait on passage 11 of papers.

12 MR. WETTERHAHN: Certainly we don't want h 13 to wait till the paskage of paper, but it's diffi-w . . -

14 cult to define the detailed structure of these 15 negotiatiogs without without knowing where we are 16 on each step.

17 So I think the parties, of course, 18 would exchange in f o rma tion to the extent possibler 19 but I think that it would be leaning towards 20 formalism if we mandated various meetings during 21 that time.

22 CHAIRMAN COTTER: Well, at this point 23 I'm very definitely leaning towards formalism.

24 I'm not going to string this thing 25 out and then have you people come back to me at the 30 Smil5vmm Resortins Commann

1 end of September or October and tell me that we've j)

L' 4 g/ 2 just wasted another three months.

3 JUDGE LUEBKE: I think what you want to 4 do --

5 MR. WETTERHAHN: Yeah, there are other --

6 polysyntax subject 7 There are other forces driving the 8 parties to settlement, and U.S. Ecology indicated 9 the prime force in additional comments to the 10 Licensing Board with regard to scheduling of pre-11 hearing conferencer and those driving forces are 12 the Agreement State Status applied -- to be applied 13 for by the State of Illinois. <

14 Mr. Fonner, staff counsel, has 15 indicated that no formal application has been made.

16 However, as I understand the process, it is an 17 informal process where there is discussions, 18 exchanges of in f o rmal pieces of paper; and when 19 there is an application made, the process is 20 complete except for its f o rm al requirements.

21 The Board has asked the question as 22 to what the status of this proceeding would be 23 should Agreement State Status be reached, and it is 24 the position of the licensee -- well, the -- we 25 have indicated that Staff will take the position, 31 Sullivan Resortins Commany

- . ~ _ .: - - - -

1 based upon certain documents obtained from The to Staff, that as soon as Agreement State Status is typ,) 2 3 reached, the jurisdiction-of This Board is 4 terminated.

5 Whether that is the correct position 6 or not, it certainly gives us the impetus to 7 complete either a settlement or a hearing before 8 that condition comes to pass, and that is driving 9 the settlement, I dare say, more so than any other 10 item.

11 I have to state, and it -- w e ' ll get 12 around to this later. As of today, it is U.S.

h 13 Ecology's position that Th'e Board should also, in 14 parallel to any settlement efforts, in addition to 15 the briefing schedule, set a parallel schedule for

- 16 a hearing to accomplish a hearing before Agreement 17 State Status is reached.

18 CHAIRMAN COTTER: Let's save that one 19 because that's one we still have to come to.

20 I'm still back with Mr. Fonner in a 21 meeting on October 7 of the three parties 22 MR. HENDERSON: October 77 23 CHAIRMAN COTTER: Which would give you 24 ten days from the date that you receive the 25 MR. FONNER: What's the 7th?

32 Sullivan Resortinn Comsans

_ --= -.... - -_ - ..- - - - - - -

I 1 CHAIRMAN COTTER: It's a Tuesday.

([ ) 2 MR. WETTERHAHN: Tuesday.

3 CHAIRMAN COTTER:- That would give you 4 ten days from the date that you receive The Staff's 5 response to the draft settlement agreement.

6 MR. FONNER: I would be willing to meet 7 on that day.

8 MR. HENDERSON: Is it possible to say 9 during the week of October 6, the weekend -- we 10 cannot answer for the schedule of other persons 11 from The State who would have to be involved with 12 thist so during that week we would have a meeting.

13 MR. FONNER: During the week --

h

"~

14 MR. HENDERSON: Yes.

15 MR. FONNER: -- of October 6.

16 I would simply like to indicate that 17 from my own position it would have to be Tuesday, 18 Wednesday, or Thursday.

19 MR. WETTERHAHN: It's difficult to 20 schedule the appropriate technical people this far 21 in advance, and we would like some latitude as far 22 as when a mandated hearing should be held.

23 CHAIRMAN COTTER: How about if I give 24 you the same latitude you gave us?

25 We'll give you three alternate dates, 33 SmilBynm Resortinn Comsansy

1 the 7th, the 8th, or the 9th.

() 2 MR. WETTERHAHN: If The Board so orders, 3 we would attempt to fulfill it, but I don't believe 4 that is --

5 JUDGE LUEBKE: Well, you can always, for 6 a good cause, try to get something changed.

7 MR. WETTERHAHN: Well, it would --

yeah, 8 I would hope that the parties would have latitude 9 on these intermediate dates without coming back to

+

10 the Licensing Board.

11 I'm talking about the date for a 12 meeting.

h 13 CHAIRMAN COTTER: Just trying to be 14 helpful, Mr. Wetterhahn.

15 MR. WETTERHAHN: We appreciate that, sir.

16 MR. FONNER: I'd like to elaborate.

17 I asked, you know, that some of these 18 dates be embodied in an order because it does give 19 us leverage over management --

20 CHAIRMAN COTTER: I understand that.

21 MR. FONNER: -- scheduling within the 22 NRC Staff --

l 23 CHAIRMAN COTTER: I understand that.

l 24 MR. FON;!ER: -- which is a real problem 1 -

' 25 for us here sometimes.

34 l

Sullivan Resortina Commang

1 CHAIRMAN COTTER: You know, this i's --

(() 2 the object is not to be Draconian. It is to be 3 definitionally motivational.

4 So let's say that the parties will 5 meet October 7, 8, or 9, sometime between October 6 7th and 9th; and that is subject to good cause 7 change.

8 So long as -- what I'm primarily 9 driving at here is that it seems to us that a great 10 deal more is accomplished face to face, and a lot 11 less time is lost than the alternative method of 12 proceeding, which is to exchange paper and that g 13 sort of thing.. .

14 And I don't, for that matter, care if 15 you do it by telephone conference or if that would 16 work. You would need everybody's agreement that a 17 telephone conver -- meeting would work.

18 MR. FONNER: I think The Staff would 19 prefer a face-to-face meeting.

]

i 20 JUDGE LUEBKE: Okay.

21 CHAIRMAN COTTER: I'll leave that detail i

22 to you all. The Board will use the word " meet."

! 23 All right then. We have October 18 24 as the target date for a response by Illinois and j

25 U.S. Ecology to The Staff's comments.

l l 35 S,ullivan Reporting Company __

1 And I think what we would want at f 2 that point is some definitive indication of whether 3 or not this matter can be resolved by settlement 4 within 30 days of that October 18 date.

5 JUDGE LUEBKE: Haven't we on October 18 6 already reached a point of impasse, or not?

7 CHAIRMAN COTTER: Not necessarily.

8 JUDGE LUEBKE: Not necesarily.

9 CHAIRMAN COTTER: They may have details 10 to work out.

11 Is that agreeable?

~ '

12 MR. FONNER: Can be achieved in 30 days l 13 or.so, that,we would have a document that would be .

14 submitted to The Board for its --

i 15 CHAIRMAN COTTER: Yeah.

I 16 MR. FONNER: -- review?

17 30 days from October 18th?

18 CHAIRMAN COTTER: Correct.

19 JUDGE LUEBKE: At some point there are 20 items left over that we go to hearing on; isn't 21 there?

22 MR. WETTERHAHN: Well, I think -- no.

23 MR. HENDERSON: Hopefully not.

(} 24 JUDGE LUEBKE: Not in this process.

" 25 CHAIRMAN COTTER: Not on October 18.

36

~ . _ _ _ _ _ _ _ _ .

_ ______Sullivan Reporting Compa_ny_ _ _ _ _ _ _,

-~

l MR. WETTERHAHN: Let's get that state-

) 2 ment on the record, that this is a one-settlement

(

3 document; the parties are trying to make concessions 4 that perhaps they would not ordinarily make in the 5 interest of getting this resolved both before the 6 NRC and before The State; that if we have to go to 7 hearing, we will have to go to hearing on the 8 entire Question 3, subject to any stipulations and 9 any narrowing of the issues by the parties; but 10 whatever is on the table comes off of the table for 11 purposes of the hearing.

12 JUDGE LUEBKE: You're saying we start 13 over someplace, back to square one in the hearing?

14 MR. ARMBRUSTER: In essence.

15 MR. WETTERHAHN: Yes.

16 CHAIRMAN COTTER: Let me suggest this in 17 that connection -- I believe what Mr. Wetterhahn is l 18 saying is that any effort at reaching a settlement 19 which involvus concessions by any one of the parties i

20 does not -- none of the parties want to be bound by 21 those concessions should they have to go to hearing.

22 By the same token, it could be benefi-i 23 cial for all of you to keep in the back of your mind l

24 what issues, if you do not reach final settlement 1

25 on all issues, what issues you can reach settlement 37 Sullivan Resortinrq Comgany

=-_ - -

1 on so that you can take them out of the hearing

({) 2 process and not have to go through a hear.ing on it.

3 MR. WETTERHAHN: The parties will 4 certainly consider that; but considering the 5 structure and the concessions made, I am not so 6 sure that there are many issues which could be so 7 withdrawn.

8 Certainly there are factual stipula-9 tions which may be possible, but I don't hold out 10 that much hope of significantly narrowing the 11 issues to -- as an example, one issue to be decided 12 by The Board which could not be decided among the 13 parties.

14 CHAIRMAN COTTER: I'd settle for three 15 or four rather than say 15 or 16.

! 16 MR. WETTERHAHN: If you consider The i

l 17 Staff 15 points, it migh t come down to four of 18 those points, but that may or may not mean that the l

19 issues have been necessarily narrowed.

l 20 Some of them are fairly broad in l

l 21 scope.

22 MR. FONNER: I think the understanding 23 is that the -- that if a document is submitted to 1

24 The Board 30 days after October 18, which would be, Q:+y l 25 I guess, November 17th -- 18th.

l 1

38 i Sullivan Resortinfg Comsany/

1 CHAIRMAN COTTER: Let's make it November CO w

2 18th.

3 MR. FONNER: Okay.

4 That that would be a signed-off on 5 settlement among the parties.

6 CHAIRMAN COTTER: We'll issue an order 7 with respect to the scheduling pIocess; and in that 8 we will indicate that on or before November 18, the 9 parties are to jointly report to The Board and 10 submit a settlement agreement if one has been 11 reached or, in the alternative, to identify what

~

12 issues, if any, have been settled.

g 13 And if we do not get a settlement 14 agreement of the whole matter on November 18, then' 15 we'll go ahead with this parallel scheduling and 1

16 proceed in hearing.

17 MR. WETTERHAHN: Well, let me be heard

18 or let me reserve some period of time that -- it l

19 appears now that the schedule, even if we were 20 going to begin very shortly, would be tight for 21 having a hearing, getting a decision rendered by 22 the target date for Agreement of State settlement; 23 and if we were to start the process at that point 24 in time, I think the licensee or U.S. Ccology would 25 be prejudiced, so we want to discuss that point at 39 Sullivan Reporting Company

1 the appropriate time.

,,m .

2 JUDGE LUEBKE: You'd prefer an earlier Is.'; .-)

3 hearing date?

4 MR. ARMBRUSTER: Yes.

5 MR. WETTERHAHN: Yes, sir.

6 JUDGE LUEBKE: How much earlier?

7 MR. WETTERHAHN: A hearing in October.

8 JUDGE LUEBKE: Early October, late?

9 MR. WETTERHAHN: I have a --

I have a 10 brief schedule which I have shown to The Staff.

11 CHAIRMAN COTTER: Let's hold that one 12 off --

(~x 13 MR. WETTERHAHN: Okay.

)

14 CHAIRMAN COTTER: -- until we go throu[h 15 two other matters.

16 MR. WETTERHAHN: Yes.

17 The -- let me just give the one 18 schedule date. It's late October.

19 JUDGE LUEBKE: That's what you have in 20 mind.

21 MR. WETTERHAHN: Yes, that's what we 22 have in mind.

l 23 CHAIRMAN COTTER: Okay.

24 I think we've aired out No. 1 4

25 adequately.

40 Sullivan Reporting Company

1 Item 2 was a list identifying documen-

((.v') 2 tation pertaining to the physical condition of the 3 site and any substantive reports.

4 Are we going to get a --

5 MR. FONNER: The Staff has prepared here 6 two documents.

7 The thicker one is a compendium of 8 material that appears in the docket; and then a 9 separate briefer list of independent studies, 10 research, so on, dealing with the conditions of the 11 site.

And we would submit those for The

~

12 13 Board.

14 CHAIRMAN COTTER: We'll go off the 15 record for a moment while we go through this 16 mechanical process.

17 (Discussion off the record.)

18 CHAIRMAN COTTEP: We've had a discussion 19 off'the record about the compilation of three lists 20 which have been presented to The Board.

21 The first is a list presented by U.S.

22 Ecology, Inc., which is -- consists of a printout 23 from the NRC document room of approximately 385 24 documents pertaining to the Sheffield Site.

25 The printout has been marked by 41 Sullivan Reporting Company

1 bullets periodically and some lines drawn through f}) 2 listings to indicate which documents the U.S.

3 Ecology thinks is more significant than others.

4 MR. WETTERHAHN: Well, what we --

5 CHAIRHAN COTTER: This list does not 6 include any documents exchanged during the course 7 of settlement or an't documents exchanged during the 8 course of discovery; is that correct?

9 MR. WETTERHAHN: Yes.

10 We have -- it's my editorial opinion, 11 after reviewing the description of these documents 12 and my knowledge of some of them, the ones marked c("T 13 with the bullet are the ones that may be possibly 14 relevant to The Board's inquiry.

15 CHAIRMAN COTTER: Good. Thank you, i

16 Mr. Wetterhahn.

17 The second list is a list presented 18 by the State of Illinois -- we'll mark this 19 excuse me. Let me back up.

20 We'll mark the computer printout from 21 U.S. Ecology or ask the reporter to mark it as 22 Exhibit 1 and make it a part of the record, if you 23 would perhaps bind it into the back of the copy of rs 24 the transcript that you send to The Board.

h-( 25 42 1

(

. _ . _ _ _ 8ullivan Reporting Company

1 (Exhibit No. 1 marked

~

(I)

N>

2 as of this date.)

3 CHAIRMAN COTTER: The second list is 4 from the State of Illinois, and it includes docu-5 ments that The State has in its possession that it 6 feels is most relevant to the proceeding before us; 7 is that correct, Mr. Henderson?

8 MR. HENDERSON: Is most relevant to and 9 responsive to Item No. 2 in your October 1st --

10 August 1st order.

11 CHAIREAN COTTER: Thank you.

~

12 And we'll mark this Exhibit 2 and 13 have it bound into the record.

g 14 MR. HENDERSON: I would also say for the 15 record that it is completed documents, not those 16 which are currently under preparation and not yet 17 finalized. .

1 1

18 CHAIRMAN COTTER: All right.

19 It does not include any pending l

20 studies which have not yet been issued as final.

l 21 MR. HENDERSON: Correct.

22 (Exhibit No. 2 marked 23 as of this date.)

24 CHAIRMAN COTTER: And the third list 25 appears to consist of a four-page document listing 43 1

Sullivan Reporting Company

1 all pertinent Sheffield documents which are then, n

if I understand the three attachments, described in h) 2 3 more detail?

4 MR. FONNER: No.

5 Why don't you describe it.

6 MS. DUNKELMAN: The first full page is a 7 technical docment, the most relevant technical 8 documents we used for information.

9 CHAIRMAN COTTER: All right.

10 We'll mark that as Exhibit 3.

11 (Exhibit No. 3 marked 12 as of this date.)

/ 13 MS. DUNKELMAN: And then a reproduction Qpr')

14 of the entire docket file. It's in three sections' 15 just to be -- just for stapling ease, and it's from 16 1975 through a couple weeks ago.

17 CHAIRMik. COTTER: This is all technical 18 correspondence?

19 MS. DUNKELMAN: It's everything.

20 CHAIRMAN COTTER: Would it include 21 documents in the proceeding file too?

l 22 MR. FONNER: It may, yes, but 1 -- We l

23 have not compared the two files.

24 CHAIRMAN COTTER: Ms. Dunkelman, when l

25 you say "everything," you mean everything in the l

44 j

l Sullivan Reporting Company

1 project manager's file?

2 MS. DUNKELMAN: In what we call Docket (U7) 3 File 27-39.

4 MR. FONNER: That what's maintained in 5 NMSS.

6 MR. WETTERHAHN: For point of informa-7 tion, we do not have any information until 1978 8 when our list --

is there --

9 MR. RUTBERG: Yeah, that's what we gave 10 you this morning.

11 Let me give this to you.

12 MS. DUNKELMAN: If could you give back --

g'~) 13 that's a complete set. -

g,J 14 MR. RUTBERG: Why don't you give me baci 15 what I gave you.

16 CHAIRMAN COTTER: Let's go off the I

l 17 record for a minute till I understand what's in l

18 this document.

1 19 (Discussion off the record.)

20 CHAIRMAN COTTER: The second portion of 21 the list of documents presented by the NRC Staff 22 comes in three segments stapled together.

23 The first page of the first segment l 24 is labeled one of three; first page of the second l

25 segment is labeled two of three, but starts with l

45 l

l Sullivan Reporting Company

I 1 page four; and the first page of the third segment

({,) 2 is label three of three but starts with page six.

3 It apparently is the docket file for 4 the Sheffield proceeding Docket No. 27-39 as 5 maintained by NMSS for the period April 16, 1975, 6 through...

7 MS. DUNKELMAN: April 9.

8 CHAIRMAN COTTER: April 9, 1986.

9 Is that an accurate description?

10 MS. DUNKELMAN: (Nodding he ad'. )

11 MR. FONNER: (Nodding head.)

12 CHAIRMAN COTTER: And that three-part

/~T 13 document will be marked Exhibit 4.

14 JUDGE LUEBKE: How about 4A, B, C7 15 CHAIRMAN COTTER: 4A, 4B, and 4C.

16 (Exhibits Nos. 4A, 4B, 17 and 4C marked as of 18 this date.)

19 CHAIRMAN COTTER: Thank you all very 20 much. I believe that takes care of Item 2 of the 21 This Board's August 1,- 1986, memorandum and order.

22 Item 3 requested the current best 23 estimate of the date that the State of Illinois is

! 24 expected to achieve Agreement State Status.

l Y 25 Mr. Fonner?

46 Sullivan Reporting Company

1 MR. FONNER: The last information that we have indicates that The State's goal is to

(' ) 2 3 execute an agreement in January of '87.

4 I would defer to --

5 CHAIRMAN COTTER: Maybe I'm playing 6 semantics, but you use the word " goal," and I asked 7 for best estimate.

8 MR. FONNER: I can only tell you 9 what I have been informed by staff in the office of 10 state programs.

11 CHAIRMAN COTTER: Illinois have any

~

12 comment on that?

13 MR. HENDERSON: It is our -- the-

} '

14 intention of the Department of Nuclear Safety to 15 submit the application in September, and there is a 16 review process by the NRC Staff which we obviously 17 have no control over; but it is correct that our 18 goal is in the beginning of the new year.

19 CHAIRMAN COTTER: You'll submit the 20 formal application in --

21 MR. HENDERSON: In September.

22 CHAIRMAN COTTER: When in~ September?

23 MR. HENDERSON: It is mid to late 24 September. That's our understanding at the present.

25 MR. WETTERHAHN: I would emphasize again 47 Sullivan Reporting Company

1 my statement before that discussions have been g~

y[ ) 2 underway for a number of months. Also, there have 3 been a number of exchanges of documents related to 4 this application on an informal basis; and therefore 5 it is not like the NRC Staff is seeing this for the 6 first time.

7 CHAIRMAN COTTER: I understand.

8 . When did the first exchanges start, 9 September of '857 10 MR. FONNER: If I could describe the 11 process.

12 CHAIRMAN COTTER: Please. .

13 MR. FONNER: The State submitted a draft 14 of what would be in their application to the NRC ~

15 Staff office of stato programs in the fall of '85.

16 That was reviewed by the office of .

17 state programs' staff. They evaluated the Illinois 18 legislation, the Illinois regulations, the structure 19 of the Illinois program, the staffing, the institu-20 tional arrangements that The State would make for 21 managing health and.. safety with respect to radio-22 nuclides, and compiled a rather lengthy analysis 23 and evalua- tion of that staff which was returned l 24 to the State of Illinois.

I kh' CHAIRMAN COTTER: When was that?

l 25 48 Sullivan Reporting Company

1 MR. FONNER: In doing -- that was, I 2 believe, in the early part of this year. I don't (5[ )

3 have the exact date with me. .

4 In evaluating that draft, The Staff 5 follows the published evaluation criteria which are 6 published in the code of -- in the federal register, 7 and evaluate each item, ranks it whether it is a 8 critical item or a noncritical item; and The State 9 then, of course, has to address these matters.

10 And there are iterations of a 11 relatively informal nature. State personnel will

~

12 call and ask if a way they're going to resolve a f"' - .13 comment of the NRC is acceptable and satisfactory, hl '

14 and they will be given an answer.

15 So that it is -- it is correct when 16 it's said that when the application, the formal 17 application is submitted, it is a -- should be a 18 certainty that the NRC Staff will pass it on to the 19 Commission with a recommendation that it be 20 executed.

21 CHAIRMAN COTTER: Assuming it comes in 22 in mid-September, do you have any estimate as to 23 how long it would take for the Commission to send --

I 24 for The Staff to send it to the Commission?

@ 25 MR. FONNER: It should go to The Commis-49 f Sullivan Reporting Company

1 sion fairly promptly, within a few weeks.

/ ') 2 CHAIRMAN COTTER: So if --

(%)

3 MR. FONNER: There's a -- it requires a 4 series of publications in the federal register and 5 public comment.

6 Then there's an evaluation of comment, 7 and then the package is returned to The Commission 8 for final Commission vote.

9 CHAIRMAN COTTER: What's the public 10 comment period?

11 MR. FONNER: It's four publications, 12 essentially one week apart, three weeks.

13 CHAIRMAN COTTER: And the comment period g.

14 is a week?

15 MR. FONNER: Well, the comment --

there 16 is no end date on the comment period as such, but 17 the comment should -- we don't wait, you know, beat 18 the bushes for people.

19 If they want want to comment, they 20 should do so promptly.

21 CHAIRMAN COTTER:- All right.

22 JUDGE LUEBKE: So if everything works 23 well, this all could end at what time?

24 CHAIRMAN COTTER: January.

~

25 MR. FONNER: January.

50 Sullivan Reporting Company

1 JUDGE LUEBKE: January.

(j ) 2 CHAIRMAN COTTER: Of '87.

3 All right. Does that complete item 37 4 Let's move on then to legal matters.

5 The Board indicated that it appeared to us as a 6 threshold matter that Issues No. 1 and 2 of this 7 September 9, 1980, prehearing conference order, 8 questions of law could be resolved in motions for 9 summary disposition without hearing.

10 Did the parties want to address that 11 question?

12 MR. WETTERHAHN: We believe that the 13 first two issues are amenable to decision in that d' . -

14 manner.

15 We have looked at the schedule 16 proposed by The Board and would not object to such 17 a schedule with the proviso that the remainder of 16 the hearing matters go forward in the interim on a 19 parallel path, such that we not do this serially 20 and and await the decision by The Board in the 21 legal matters before we begin preparations' for a 22 heari,ng.

23 CHAIRMAN COTTER: Illinois?

24 MR. HENDERSON: We would object very 25 much to the schedule as proposed if --

on one basis.

51 Sullivan Reporting Company

1 If we are to go forward with the 2 earlier schedule that you were proposing regarding h[^)T

~~

3 settlement negotiations, our efforts and abilities 4 will be tied up with reviewing settlement negotia-5 tions and engaging in them.

6 We do not have the staff or wherewith-7 al to devote to both, proceeding with this in an 8 adversarial context, which would be very exhaustive, 9 and proceeding with the settlement negotiations, 10 which would be equally exhaustive.

11 If we want to trim paper and submit

~

12 briefs, then we will have to devote our resources g 13 to doing that and preparing for hearing, which will 14 preclude going '

a head with any certainty at all witF 15 settlement.

16 In addition to which, the schedule as l 17 proposed for briefing the two issues that are i

18 identified as legal issues is not acceptable to The 19 State. ' We do not have an objection to U.S. Ecology 20 filing its brief on September 22nd. It is --

if l

21 that'is what they choose to do.

I I 22 But we think that the' October 6th I

23 date for the State of Illinois is inadequate for 24 adequately reviewing the brief of U.S. Ecology and 25 responding for several reasons, one of them being 52 Sullivan Reporting Company

1 that a longer period fo r review of those matters is

[.D 2 necessary.

%J.

3 In addition to which, we have matters 4 that we have not begun to explore with the NRC which 5 is relevant to both Issues 1 and 2 which would 6 require some discovery from the NRC regarding how 7 they have treated other sites, in regard to the 8 issue of possession, and in regard to how they have 9 treated the License No. 13-10042-01; so we would 10 want material from the NRC which will be relevant 11 to briefing those two issues.

12

~

So longer certainly than two weeks is 13 required for an adequate response if we are to get, 14 in fact, an adequate response to U.S. Ecology's 15 brief; in addition to which, we would ask for a l

16 hearing on the matter.

17 CHAIRMAN COTTER: You mean oral argument?

18 MR. HENDERSON: Oral argument.

19 And if we are to -- we would also 20 object to carrying ahead with the exhaustive 21 discovery and preparation for a hearing which is 22 entailed in Issue No. 3.if we are also engaged in 23 attempting to dispose of Issues 1 and 2.

24 CHAIRMAN COTTER: I guess I can give you 25 a threshold reaction.

53 Sullivan Reporting Company

1 It seems to me that these issues

/7^)

.gs ,/

2 haven't changed very much since they were first 3 enunciated six years ago, so I don't have an awful 4 lot of sympathy with the thought that U.S. Ecology 5 is going to come up with something so novel that 6 it's going to require a great deal to respond to.

7 Secondly, we preliminarily here 8 exchanged a substantial number of lists and what 9 not, and it seems to me ~ that those documents can 10 certainly be exchanged on a prompt schedule.

11 So I'm -- I guess my own personal 12 reaction to your comments is that I'm -- I don't

' 13 see the need for that monumental an effort that

(.<l J this schedule couldn't be met, but we'll hold that' l 14 15 in abeyance for a moment.

l 16 MR. FONNER: I defer to Mr. Rutberg.

17 MR. RUTBERG: The Staff agrees with The 18 Board that the first two issues are susceptible to 19 resolution by the briefs, suggested by The Board, 20 and we don't have any objection to the schedule 21 proposed by The Board.

22 However, we do raise a concern that l 23 was raised by U.S. Ecology, that at the same time 24 this briefing schedule is going on, we would also 25 be preparing for litigation.

54 Sullivan Reporting Company

1 I don't know if you want to address that issue right now or get to that.

[] } 2 Mr. Henderson, did you 3 CHAIRMAN COTTER:

4 want to respond to my initial comments on Illinois's 5 position?

6 MR. HENDERSON: Well, if --

the lists 7 which have been produced here of documents, as you 8 can see, is rather exhaustive.

9 We have over 300 some odd documents 10 identified by U.S. Ecology, presumably other 11 documens also identified by the NRC, different 12 documents identified by us. It's a substantial --

13 CHAIRMAN COTTER: But you've been hh 14 working with those documents in the last five years 15 in efforts to negotiate the settlement of the whole ,

, 16 matter.

17 MR. HENDERSON: I have no idea whether l

18 we have worked with the documente that U.S. Ecology 19 has identified.

20 I have not seen the list except 21 preliminarily for essentially less than three 22 minutes last evening.

23 I don't know what it includes. I 24 can't addresa whether we've looked at or analyzed

~

25 them or not.

55 Sullivan Reporting Company

1 What it does indicate is that there is a great deal of technological data at issue here,

(. } 2 3 that it is indeed a site which has produced a great 4 deal of material for review and for analysis, that 5 it is a complicated issue.

6 Preparing for a hearing on the 7 substantive issue of No. 3 will require a great 8 deal of effort by our staff.

9 If we are to go ahead with analyzing 10 and reviewing matters for a settlement, then that 11 staff is not going to be involved in preparing for 12 Litigation. If we're going to be prepared for 13 litigation, then they're not going to be involved 14 with settlement.

15 The question of adequately responding 16 to a brief by U.S. Ecology within two weeks, I have 17 no idea what that brief is going to say; I don't 18 know if it's going to advance novel matters. But 19 if you are to get an adequate response upon which 20 you can premise a reasonable response in evaluating 21 those, the arguments, then we must have adequata 22 time to prepare and respond.

23 And the issue of discovery from the 24 NRC relative to these two issues is something which h 25 is important. We have not engaged in discovery on 56 Sullivan Reporting Company

1 those matters with the NRC.

2 Our efforts have been aimed at settle-(hN 3 ment rather than at litigation. We have done some i

4 preliminary discovery with U.S. Ecology, but we have 5 not received any of the documents which we requested 6 to have copied from them.

f 7 There is a great deal outstanding to c

8 gear up for litigation of this matter, both with 9 Issues- 1 and 2, and certainly with Issue No. 3.

10 MR. WETTERHAHN: May I be heard on this 11 matter?

4 12 I think we're mixing up too many 13 items with regard to the limited question put forth 7

o ~

14 by The Board. We are talking about two legal 15 issues which, as Ths Board noted, had been defined 16 some time ago.

17 It's not as if there had not been .

i

)

!' 18 discovery in this matter. There was extensive 19 discovery, and at least U.S. Ecology's discovery l

20 was -- included consideration of these items with 21 both regard ' to ' the material within the possession 22 of The Staff mainly, but also as to subjective 23 interrogatories.

24 We recognize there have been many 25 changes of counsel for The State; however, there 57 Sullivan Reporting Company

1 is an obligation to go back and examine the docu-(q _j 2 ments which were made available and the answers to 3 discovery requests back in the 1981-1982 time frame.

4 I can assure you that The State did 5 examine documents related to the Sheffield case in 6 the files in Louisville, and documents were made 7 available based upon that search.

8 But getting back to it, I can't 9 perceive how technical documents -- which I can 10 understand you have new lists -- would relate to 11 these two legal issues.

12 I guess it's a bad habit of mine l 13 shared by some other lawyers that yeah, if you set 14 a long period between receipt of a pleading and a 15 response date, you wait till the last minute anyhow.

16 The time between receipt and the time 17 your document is due -- I've learned the hard way --

18 should be devoted to responding to the specific 19 points, and your basic legal position should hope-20 fully be stated. You should be able to put that on 21 a piece of paper before receipt of another party's 22 brief; so I believe that this is reasonable.

23 Ar d while it may be difficult for

( 24 parties to concentrate on two and even perhaps (8;

w' 25 three items, I believe that it can be done and it 58 Sullivan Rbporting Company

1 should be done to keep the entire process on the --

on track; and one of these tracks will lead to f)f'}

L/

2 3 resolution of this matter -- and they are symbiotic, 4 that keeping t'n e parties focused on both the legal, 5 the technical, and the settlement tracks will allow 6 at least one of these to come through; and we 7 believe that this is fair to all the parties and 8 fair to The Board and to U.S. Ecology to have its 9 case considered in this form.

10 MR. HENDERSON: Well, I would say that 11 the question of discovery from the NRC is something 12 that -- we have not done any discovery with them at 13 all on issues whi.ch are relevant to Issues 1 and 2.

14 The question of administrative -

15 practice and interpretation which relate to these 16 issues is relevant, and it is something when -- if 17 we have to brief these matters, we intend to get 18 into discovery on that.

19 The question of how time is budgeted for responding to a pleading is of relevance. I 20 21 think that if we are to be expected to adequately 22 respond, we must be given adequate time to do so on 23 both Issues 1 and 2.

24 The question of not only fast-tracking 25 this but triple-tracking this, so that we are 59 Sullivan Reporting Company

1 expected to carry ahead with settlement negotiations,

,.m

.;.( ) 2 preparation for hearing on Issue No. 3, plus 3 briefing of Issues 1 and 2, is simply not possible 4 for The State; in addition to which, it is -- there 5 is no reason to do it.

6 I don't --

7 CHAIRMAN COTTER: I'm sympathetic to 8 what you're saying, but sometimes bills do come due.

9 MR. HENDERSON: I'm not sure what you 10 mean by that.

11 CHAIRMAN COTTER: Well, you all have 12 been sort of shuffling around with this thing for lg 13 five or six years, and the time to resolve it may 14 be here.

15 Let me ask you --

16 MR. HENDERSON: Well, is it --

17 CHAIRMAN CL N ER: -- a couple of l 18 in f o rma tio n al questions. I'll give you another 19 chance, Mr. Henderson.

20 This may appear a little bit obscene l

21 to you, Mr. Fonner, but is there any reason why you 22 couldn' t simply open up that file that you've got 23 and give it to The State, the one that you gave to rw 24 the NRC?

r 25 MR. FONNER: As far as I know, except l

j 60 Sullivan Reporting Company

1 perhaps as to documents prepared for purposes of (m')

f 2 litigation, undisclosed legal advice potentially to n.,

3 The Staff which would have to be reviewed first, 4 other than that, I can think of no reservations why 5 anything in the NRC file is not available to either 6 party.

7 CHAIRMAN COT *ER: So discovery may be a 8 minimal problem.

9 MR. FONNER: It's a big file, but that 10 doesn't mean that there's anything...

11 CHAIRMAN COTTER: The second question --

12 excuse me.

'^s 13 Go ahead, k-) Just the mechanics of

~

14 JUDGE LUEBKE:

15 this thing, after you've taken what you might call

. 16 proprietary legal things out, they could come to 17 Washington and look at that.

18 MR. FONNER: Yes.

19 CHAIRMAN COTTER: And have a copy of 20 whatever they wanted?

21 MR. FONNER: Yes.

l i

22 CHAIRMAN COTTER: Second question, is it 23 possible for the grant of Ag reement State Status to f

24 the State of Illinois to provide that it would be l

25 subject to completion of this proceeding by the NRC?

1 61 Sullivan Reporting Company

1 MR. FONNER: I believe not.

n I think it would be the position of

,jfl }

s 2 3 office of general counsel.that the law does not 4 allow that kind of single exclusion of a single 5 licensee.

6 CHAIRMAN COTTER: Even in the interests 7 of efficiency.

8 MR. FONNER: Even in the interest --

9 it's a question of fundamental jurisdiction.

10 MR. HENDERSON: I believe The State did 11 propose that itself at some point.

~

12 CHAIRMAN COTTER: Does The State concur 13 in that opinion?

~~

14 MR. HENDERSON: Yes.

15 MR. WETTERHAHN: I would note that U.S.

16 Ecology does not necessarily Agree to that legal 17 position.

18 We, of course, reserve the right, 19 should the Agreement State Status be pursued, to 20 comment and to take further actions with re -- to l

21 protect what we regard as our right to have a 22 hearing before the Nuclear Regulatory Commission.

23 MR. ARMBRUSTER: Mr. Chairman, we've 24 also had discussions with both the NRC and The 25 State relative to other options which may be 62 Sullivan Reporting Company

1 available that would preclude the Agreement State

(~[f~'s 2 Status applying to Sheffield.

~Q 3 These options are under consideration 4 by The State at this time, and I'm not at liberty 5 to discuss it further; but there have been discus-6 sions in those areas.

7 MR. FONNER: Are we getting aheid?

8 This is an item raised on Page 3.

9 CHAIRMAN COTTER: Well, it's relevant to 10 the current scheduling discussion.

11 MR. WETTERHAHN: We are hopeful that a 12 mechanism can be developed to allow additional time, 13 but we are constrained; and hopefully when the 14 positions of the parties are narrowed, there may be-15 some avenue, but I don't think we can depend on that 16 with regard to the hearing right of U.S. Ecology.

17 CHAIRMAN COTTER: Would it make any 18 difference if we gave the State of Illinois the 19 same filing date as the NRC Staff, Mr. Fonner?

20 M R. FONNER: (Gesturing.)

21 MR. RUTBERG: We'd have no objection to 22 that.

23 CHAIRMAN COTTER: I must say at this 24 point I -- it seems to me -- and this is subject to l

j 25 consultation with my colleagues, of course; but it 63 Sullivan Reporting Company

1 seems to me the best and most efficient prospect 2 for resolving this, the disputes under consideration (h'v')

~

3 here, is the settlement process. ,

1 l

4 By the same token, if that does not 5 succeed, we have an obligation to proceed because f 6 we cannot take action in view of a contingency 1

7 which has not yet occurred, namely whether or when 8 The State of Illinois achieves Agreement State 9 Status.

10 Because the settlement option seems 11 the most beneficial to everyone involved, I 12 personally at this point would not -- would be 13 inclined to encourage that and would not want to gg 14 jeopardize it.

15 And so my own reaction at this point 16 is that I would expect the parties to proceed on 17 the settlement schedule that we've outlined and .

18 which we will incorporate in an order to be issued 19 at the end of this week or the beginning of next 20 week; that it would be beneficial as a second step 21 to go ahead and address Issues 1 and 2 which are 22 legal prerequisites to a possible resolution of the 23 ractual issues; and to then schedule a hearing on i 24 Issue 3, if it's needed, after resolution of Issues 25 1 and 2; and that that hearing, if we arrive ct the 64 Sullivan Reporting Company

1 need for it, will be scheduled on an expedited

( '^. 2 basis.

\_]

3 It seems to me that there's been a 4 great deal of exchange of in f o rma tiort here. There 5 can't be too many little hidden nuggets to be 6 uncovered by discovery that are not otherwise fairly 7 readily available; and that if it's necessary to go 8 to hearing, we may well be able to do it by the 9 early part of December, after you all have either --

10 if you've failed at settlement negotiations.

11 Then we would proceed, in any event, 12 on this briefing schedule for the two legal issues 13 and then contemplate ruling on those issues so --

14 by the first week in November -- so that you could-l

'1 5 anticipate going to hearing sometime in the first 16 week in December.

17 I would encourage you all to proceed

! 18 on the first choice, which is settlement of the 19 issues.

20 MR. HENDERSON: Well, I would repeat 21 what we have stated before, that in the view of The 22 State, these are mutually exclusive paths to follow.

23 Are we going to litigate this, or are 24 we going to engage in settlement?

h 25 If it is the opinion of This Board 65 Sullivan Reporting Company

1 that settlement is the preferred method -- which it is the opinion of The State to get that result, (vv) jl --

2 3 we're going to have to devote substantial time and 4 effort to settlement.

5 The order which you are contemplating 6 regarding settlement schedule requires a substantial 7 investment of time and effort, both of legal and 8 technical people; and the schedule for briefing and 9 an expedited hearing requires an extremely substan-10 tial investment of time by legal and technical 11 people. They are mutually exclusive paths.

12 If you seek to encourage settlement,

-'^ 13 then a decision has to be made, which way to go.

{_)) In addition to which, we do disagree ^'~

14 15 with your sanguine view of how quickly a hearing on 16 the substantial matter can go forward. There are a 17 number of discovery areas which, in order to 18 adequately prepare The State and engage in both 19 parties and nonparties --

20 CHAIRMAN COTTER: Well, you should under-21 stand, Mr. Henderson, that after six years of 22 exchanging documents, we do not anticipate that 23 there's going to be any lengthy discovery period.

24 MR. HENDERSON: Well, if we are going to 25 have an adequate hearing on No. 3, then there will 66 Sullivan Reporting Company

1 be -- either we will be precluded from discovery as

$)"3 2 we deem necessary, and evidence which we deem

-v g 3 necessary will be kept out of the record, and which 4 we will object to vociferously; or we will engage 5 in extensive discovery, which we consider adequate 6 and necessary.

7 That will not be something we will 8 compromise on. We have people --

9 CHAIRMAN COTTER: Nor will This Board 10 compromise on the fact that you have already 11 engaged in extensive discovery.

12

~

There has been.an extensive exchange 13 of documents in connection with these settlement 14 proceedings, and there are -- you have already beer 15 advised this morning that The Staff documents, for 16 all intents and purposes, are readily available to 17 you.

18 MR. HENDERSON: There are people -- some 19 of these studies would have been -- many of these 20 studies and relevant evidence has been produced by 21 entities which are not party to this proceeding 22 against whom we have not had discovery -- U.S.

23 Geological Survey, Illinois Geological Survey --

24 and we will seek discovery against them.

O

w,i 25 There is a great deal of material 67 Sullivan Reporting Company

I which we have a request to see. We have -- we have been to Louisville to look at the files of U.S.

([ } 2 3 Ecology, but those docu --

the documents which we 4 requested to be copied and sent to us we have not 5 received. There is still material outstanding.

6 The view of The Board as to what has 7 transpired in the period in which we have been 8 attempting to negotiate and settle this matter is

, 9 different from our experience o f -- it does not 10 involve the extensive discovery which you seem to 11 think has taken place.

~

12 Opening of a file is a beginning of 13 engagement in further discovery. There will be --

g 14 this will help identify people we will want to 15 depose and seek discovery from.

16 CHAIRMAN COTTER: Well, I think your 17 views are clear.

18 I don't know whether it's worth 19 getting into -- I think we've covered the legal 20 questions of summary disposition on Issues 1 and 2, 21 and we've touched on the hearing of Factual Issue 3.

22 I do not know at this point whether 23 it's worthwhile getting into the whole question of 24 jurisdiction in the event Illinois becomes an lA 25 Agreement State or not.

68 i

Sullivan Reporting Company

1 Does anybody have any particular b P'N) 2 views on that?

3 MR. FONNER: We've stated our view 4 already for the record.

5 CHAIRMAN COTTER: I think so.

6 MR. FONNER: We can only elaborate it.

7 MR. ARMBRUSTER: Mr. Chairman, the 8 company finds itself in sort of a Catch 22 position 9 here because we believe that settlement could be 10 fruitful, that we're very close on substantive 11 points.

12 At the same time, we've tried to 13 propose a method that would maintain the status quo 14 so that we wouldn't find ourselves in any peril in ~

15 the event that settlement broke down at the very 16 end of our discussion and then we'were faced with a 17 hearing that could never take place in front of 18 this forum in this jurisdiction; and that obviously 19 gives us cause for concern, and we don't know any 20 other way to address it c her than to ask The State 21 if there is a method -- and we think there is 22 that would allow us to maintain the status quo while 23 we proceed with the settlement discussions.

24 Unfortunately, The State would like 25 to consider that for additional time periods; and 69 Sullivan Reporting Company

1 we're sympathetic, but at the same time that leaves 6 2 us with no choice today but to ask that some of

}

3 these proceedings occur simultaneously and that we 4 proceed with whatever remedies arc afforded to us 5 in.this tribunal.

6 MR. HENDERSON: I would point out that 7 the proposed arrangement was articulated at the end 8 of the day last Wednesday by U.S. Ecology.

9 We are looking --

10 CHAIRMAN COTTER: Which arrangement do 11 you mean?

~

12 MR. HENDERSON: The arrangement for post-13 poning the drawing of Agreement State Status in 14 reference to low-level waste in part of the stater' 15 It is a last-minute suggestion which 16 we have taken under serious advisement in examining 17 with a great deal of seriousness.

18 MR. ARMBRUSTER: Not to be contentious, 19 Mr. Chairman, I agree with the time period. It was 20 proposed late last week.

21 However, no one in this room is ,

22 unaware of the situation, that it was impending; and 23 there was discussions that the Agreement State 24 Status would have a material effect on the company's g

W 25 interest.

70 Sullivan Reporting Company

1 And we tried to conclude the negotia-((} 2 tions as expeditiously as possi'cle; but due to a number of circumstances, we were not able to 3

4 conclude them, and thus we are still faced with 5 this situation today.

6 MR. HENDERSON: I would also sayl that i

7 The State disagrees that U.S. Ecology's at' peril, 8 quote unquote, in regard to Agreement State Status.

9 The State of Illinois, if and when it 10 becomes an Agreement State, as part and parcel of 11 that agreement must have in place administrative 12 proceeding -- procedures whereby an adequate, 13 independent review of the matter will take place.

14 Parallel to that, that mechanism 15 which the NRC has in place and which This Board is 16 operating under, judicial review of the adequacy 17 and fairness of that hearing is available as it is 18 for parties before this tribunal.

19 We not only disagree with the term 20 that they're in peril, but we think that they're --

21 as part and parcel and necessarily as part of the 22 Agreement State Status, the position of the parties 23 must be the same as it is before this t r ib un al ,

24 otherwise it is not functioning as an Agreement 25 State and would --

71 Sullivan Reporting Company

1 CHAIRMAN COTTER: As a matter of curiousity, does Illinois have an Adminihtrative

' (} ) 2 3 Procedure Act? It does, doesn't it?

4 MR. HENDERSON: Yes.

5 CHAIRMAN COTTER: Does it have a central 6 core of administrative judges or administrative 7 hearing officers?

8 MR. HENDERSON: They're part of the 9 proposed Agreement State package which could be 10 sent to the NRC.

11 It will be setting up the mechanism --

12 it sets up the mechanism for a tribunal such as 13 this one.

14 CHAIRMAN COTTER: Would it be parallel '~

15 to this one in the sense that it would be staffed 16 by both legal and technical members?

, 17 Would it be a three-member hearing l

18 body?

19 MR. HENDERSON: As I understand it, that 20 is the case.

21 MR. WETTERHAHN: This is not the proper 22 form --

23 CHAIRMAN COTTER: You're all beating a 24 dead horse.

  • 25 Whether U.S. Ecology is at peril or 72 Sullivan Reporting Company

1 not at peril is not of concern to us really. My 2 only concern I think the worst concern -- is

()

3 carrying out our obligations to complete proceedings 4 in an efficient manner.

5 I must say there's probably a certain 6 amount of concern on our parts in that we had 7 thought that what we were doing was allowing the 8 parties to settle the case, and now we find out six 9 years later that they're not going to know whether 10 they're going to settle it for another month and a 11 half. _

our only interest in this is 12 So I --

13 resolving the matter one way or another.

g

'~

14 MR. HENDERSON: That is our concern as 15 well, and that is what is behind our concern about 16 a last minute fast-tracking rush to a hearing in i 17 this matter, which, if it's going to be an adequate

. 18 hearing, should be prepared appropriately rather 19 than in a manner which not only imperils settlement l 20 which we are close to, but which imperils the 21 ability of The State in the very least, as one of 22 the parties, to adequately present its case.

23 CHAIRMAN COTTER: I undcratand ycur l 24 position, Mr. Henderson.

{* 25 JUDGE LUEBKE: Mr. Henderson, did I l

73 Sullivan Reporting Company

- _ . - - . - _ . - ~ . - --- .-.

1 understand you to say that two additional weeks in

(.fj ) 2 preparing this legal briefing would give you relief?

3 You have October 6 --

4 MR. HENDERSON: We would ask for at 5 least -- we don't have our discovery yet, but we 5 would ask for a minimum of 35 days to respond.

7 CHAIRMAN COTTER: Your request is noted 4 8 for the record.

9 MR. HENDERSON: Thank you.

10 CHAIRMAN COTTER: Is there anything else 11 we need to cover then?

~

12 JUDGE KLINE: Did you want to cover that g 13 renotice question? .

~

14 CHAIRMAN COTTER: Oh, yeah.

15 There are two things. What about the 16 question of renoticing the proceeding?

17 MR. FONNER: The NRC Staff does not see I

18 any value or purpose to be served by renoticing at 19 this point.

20 We would note that the criteria for 21 addressing such a question stems from a reactor I

22 case, and we are not convinced that that reactor 23 case is necessarily a good precedent for this type g 24 of proceeding addressing this subject; but I will 25 address the criteria which that case -- which was 74 Sullivan Reporting Company

b 1 the Allen's Creek Case, Houston Power and Lighting.

(5} 2 It refers to consideration of the 3 content of the original notice, changes in the L 4 scope of the action and the significance since the 5 original notice, and circumstances surrounding the 6 proceeding including hearings and dormant periods.

7 CHAIRMAN COTTER: Can you give me a cite 8 to that one?

9 MR. FONNER: Houston Power and Lighting, 10 ALAB-539 9 NRC 422 (1979).

11 CHAIRMAN COTTER: Thank you.

~~

12 MR. FONNER: As we see it, since the fjs 13 early stages of this proceeding, it has not really G:.O 14 been proceeding under the context of the original

15 notice -- and I'm referring to the notice to show 16 c a. u s e .

17 I think the issues, as formulated in 18 The Board's order from 1980, is fundamentally what i

19 we're still proceeding ~under. There's been no 20 change in those issues. There's no change in the 21 scope of the action.

22 We haven't seen any change in the 23 safety issues that are applicable to the site. In 24 fact if anything, the safety conditions of the site 25 are improving simply because of the fact that the 75 i Sullivan Reporting Company

1 radionuclides are constantly decaying. The source

( 2 term is always decreasing. 3 Part 61, which was promulgated in the 4 intervening years, does not apply to this site, so 5 that presents no new standard that needs to be 6 addressed; final criteria is'how do you justify 7 intervening dormant period. 8 Of course in the leading case on this 9 it was a question of suspension of activity of 10 construction and a construction permit. Here we've 11 had a suspension which The Staff feels has been,

                         ~

12 for the most part, for good and valid reasons. 13 We think it was a credible option to

    }

14 consider whether 151B of the Nuclear Waste Policy ' 15 Act was an avenue fo r resolving the Sheffield 16 situation, We regret that that did not come to 17 fruition. 18 And, of course, we had no control 19 over the time it took for DOE to run it's test 20 case and to come up with the criteria which it 21 established for the exercise of its discretion. I 22 CHAIRMAN COTTER: That -- that's a 23 relevant question. 24 Did you mind digressing into that? l {\q _/ 25 What is the status of the DOE program? l 76 i Sullivan Reporting Company

      - _ _ - -    . _ .   - - - _ . - - . . . . _ - _ . .                       . - - _ _ . - - ~     - - - - . . . . _ - _ - _ _ .

1 MR. FONNER: They issued a report last 3 (%) 2 year that established a -- I wouldn't want to 3 characterize it as an onerous requirement, but 4 certainly one which would put substantial burdens 5 on both U.S. Ecology and the State of Illinois if 6 it were to be fulfilled to satisfy the detailed 7 requirements of the Department of Energy. 8 That report can be made available, if 9 you desire. - 10 CHAIRMAN COTTER: I don't think we need

      , 11 it for the record.                  As a matter of curiousity, I 12 g6ess we'd like to know.

13 But what you're indicating is that

    -}

14 the DOE program is so demanding that you think it"%2 15 MR. FONNER: Well, we can't speak for 16 The State, but our own evaluation of it is that,it 17 was a very demanding program; and whether The State 18 would be willing do submit a request for federal 19 custody and ownership of that site under the 20 conditions imposed by DOE is, I think, highly 21 problematical, but The State would have to answer 22 in the last resort to that. 23 CHAIRMAN COTTER: There's been a test 24 case where? 25 MR. FONNER: Sheffield was supposed to 77 8 Sullivan Reporting Company

l l 1 be the test case. It was the baseline for analysis ()g 2 of the kind of information, the kind of data, the 3 kind of conditions that DOE would expect to be met. 4 CHAIRMAN COTTER: And there's been no 5 other - -- 6 MR. FONNER: No, sir. 7 CHAIRMAN COTTER: Are there any other 8 possibilities at this point?- 9 MR. FONNER: I do not believe so. 10 Because of the terminology of Section 11 151B, it's highly unlikely that any other currently 12 opened shallow-land burrying site would be included

g. 13 in the program.

14 CHAIRMAN COTTER: What about the ones 15 like West Valley -- 16 MR. FONNER: No. 17 West Valley is licensed by New York. 18 Maxiflat (phonetic) is licensed by New York State -- 19 by Kentucky, I'm sorry. 20 CHAIRMAN COTTER: I know they're licensed 21 by different states. 22 I'm asking why they would not be 23 candidates for the test. 24 MR. FONNER: Because 151 limits the 25 authority to sites which have been licensed by The 78 Sullivan Reporting Company

1 Commission. ({) 2' CHAIRMAN COTTER: Oh, okay. 3 Did you finish your statement? 4 MR. FONNER: In conclusion I would say 5 that I do not think that the -- I think the circum-6 stances of this case do not warrant, even under the 7 criteria of the Allen's Creek Case, would not 8 warrant renoticing. 9 We don't see any useful purpose that 10 would be served by it. 11 MR. WETTERHAHN: U.S. Ecology is in 12 agreement with the position of The Staff. g 13 We have here an order to show cause 14 which is not one of those specific matters which i' s 15 required to be noticed for hearing, given oppor-16 tunity for a hearing; therefore, we believe The 17 Commission has set in a status which is different 18 from the licensing cases which staff counsel has 19 mentioned, and the situation is completely different 20 from a situation where one is trying to construct a 21 very complicated nuclear reactor with changing 22 criteria, changing circumstances, which may change 23 over a period time. 24 Here the issues have been defined; 25 and we are, in effect, looking for the conditions 1 79 Sullivan Reporting Company

1 for decommissioning. The period of time is not ( 2 such as to require a renoticing in this case. 3 MR. HENDERSON: As a representative of 4 the People of The State, it would be in our interest 5 to have a renoticing just in informing the public 6 of the event of the hearing; and if there is any 7 question about the adequacy of the notice, in order 8 to protect the integrity of the proceeding, we would 9 recommend that it be resolved in favor of issuing a 10 further notice so that there's no question as to 11 the adequacy of the earlier notice. And that's our 12 opinion. ! 13 CHAIRMAN COTTER: All right.

 @             14                   Thank you, Mr. Henderson.                                                                      -

15 That completes my agenda. Do you i 16 have anything further, Judge Luebke? 17 JUDGE LUEBKE: No. 18 JUDGE KLINE: No. 19 CHAIRMAN COTTER: Mr. Wetterhahn? 20 MR. WETTERHAHN: The only item which I 21 brought to the attention-of The Board -- I' don't 22 know if it was on the record or not -- would be the 23 location of any further hearings with regard to 24 this matter. 25 As far as U.S. Ecology is concerned, 80 i Sullivan Reporting Company

l I we have a preference for hearing s in Washington, t 1, ( 2 D.C.; but of course, we would not object to any

               }

3 hearings in the Chicago area. 4 CHAIRMAN COTTER: I'm not sure what ~ 5 you're saying to me. 6 MR. WETTERHAHN: We -- I think that as 7 it concerns most of the parties, it would be easier 8 on the majority of counsel and The Board to hold it j 9 in the Washington area if agreement could be reached; ) i 10 however, we believe if Washington is not a -- the

,                11          area is not a locale for the hearing as de te rmin ed 12          b~y The Board, Chicago would be an alternate and

^

          .      13          would be preferable to other locations.

14 CHAIRMAN COTTER: I suspect you might 15 have a view on that, Mr. Henderson. 16 MR. HENDERSON: We would like to have i 17 the hearing on this matter within the state which 18 is concerned with the site, and we think that

19 Chicago is probably the best place for the hearing 20 within the state as most accessible to parties from 21 outside the state.

22 MR. RUTBERG: Staff has no preference 23 where the hearing is held. We will be there. 24 CHAIRMAN COTTER: All right. N O 25 Is there anything else? t l 81 i Sullivan Reporting Company

1 Mr.-Wetterhahn? MR. WETTERHAHN: We have nothing else. () 2 3 CHAIRMAN COTTER: Mr. Henderson? i 4 MR. HENDERSON: I'd just like to reempha-5 size our position that an order relating to carrying 6 forward with negotiations is inconsistent with an 7 order for moving forward with the hearing of this 8 matter in an adversarial context, and we would 9 object to including both orders by The Staff -- by 10 The Board. 11 In addition to which, if the -- as 4 12 pirt of the order of moving forward with the matter, 13 we would ask that it be part of the order that, r g 14 recognizing the NRC's statement on the record that' 15 their files would be open for our review, and for

i. 16 the order to reflect that U.S. Ecology should 17 produce the documents from Louisville which we have 18 earlier movd for production.

19 MR. WETTERHAHN: We will check our I 20 records, but it's our recollection that all i 21 documents which had been requested were produced. i 22 If they weren't, it's -- we will be 23 glad to send it; but some period of time has passed 24 since discovery, and it's unusual that we wait a 4 l 25 period of time and then discover that we don't have l 82 i Sullivan Reporting Company

1 all these documents, a period of years. (f) 2 CHAIRMAN COTTER: Is that what you're 3 referring to, Mr. Henderson? 4 MR. HENDERSON: Yes. 5 CHAIRMAN COTTER: These were documents 6 requested early on when the matter was first J 7 remanned by The Commission? 8 MR. HENDERSON: Early on. 9 It was late '81 or '82. 10 MR. WETTERHAHN: Well, as we recall it, 11 they went through the files; and it's our collective 12 recollection that the material was requested -- 13 which was requested was sent, and this was some t

      )

14 years ago. 15 If it wasn't -- we don't recall any 16 follow-up on the part of The State to get that i 17 material; but if it hasn't been sent -- I 18 CHAIRMAN COTTER: Okay. 19 MR. WETTERHAHN: -- we'll send it. 20 CHAIRMAN COTTER: When? 21 JUDGE LUEBKE: It seems to me i f -- even 22 if on your records it was sent, it wouldn't hurt to 23 send it again, unless it's inconvenience. 24 MR. ARMBRUSTER: Well, we had taken all ( 25 the files, and we segregated it so that they could 83 _ _ _ _Sullivan Reporting Company

1 review it; and they spent a number of days going

 ; [h                2         through it and then indexed those items that they
             }

3 wanted. It's my understanding that they were all 4 sent. 5 If The State could tell us which 6 documents have not been sent, we had be most happy 7 to provide them again; but I don't believe that 8 we've kept the files in that sequestered form or 9 necessarily maintained our tag as to each document 10 that's been sent. 11 CHAIRMAN COTTER: This is one of those i

                                ~

I 12 mechanical things that's time consuming and, as far 13 as I'm concerned, a waste of time. i ~ ] 14 How about the two of you getting 15 together after this is over and arranging a time

16 where you can decide exactly what it is you need 17 and how you're going to get it to them.

] 18 Is that agreeable? 1 19 MR. HENDERSON: Yes. 20 MR. WETTERHAHN: Yes, sir. 21 CHAIRMAN COTTER: So if would meet as i 22 soon as we finish here and work that out, that 23 would be good. 24 Anything further, Mr. Henderson? ud. 25 MR. HENDERSON: That's all. , 84 Sullivan Reporting Company

I 1 MR. RUTBERG: I'd just like to add -- [d )

+: v 2              CHAIRMAN COTTER:         Mr. Rutberg?

3 MR. RUTBERG: Yeah. 4 That we believe that settlement is 5 in the best interest of all the parties, and we 6 appreciate The Board's effort to move the proceeding 7 along in that direction. 8 In the event that settlement isn't 9 forthcoming, The Staff will be ready to proceed to 10 a hearing on an expedited basis as determined by 11 The Board. 12 There is -- there are additional -- gg 13 there are other matters that we would like to

     '. 4   discuss with the parties too as far as receipt of 15     information we haven't gotten, including engineering 16     drawings of some of the methods by which this matter 17     could be settled.

18 , We can talk to the parties after this 19 proceeding the same way. 20 CHAIRMAN COTTER: That would be very 21 useful. 22 I am not very sympathetic to taking a 23 great deal of time on discovery among government 24 entities. It seems to me that that is simply a 25 technicality that is a waste of time and efficiency _ 85 Sullivan Reporting Company

1 and everything else; so I would like to see as much (j 2 and preferably all o'f discovery taken care of on a 3 prompt, voluntary basis. 4 Is there anything further? 5 That being the case, this hearing is 6 adjourned. 7 (These were all the 8 Proceedings had at 9 this time.) 10 11

                           ~

12 h .. 14 15 16 17 18 19 20 j 21 22 23 l 24 25 86 Sullivan Reporting Company

                    , _ _ . - _ _ _ - - _ _ . . - - - - _ . . _ _ _ =

CERTIFICATE OF OFFICIAL REPORTER

                                                                                    ~

O This is to certify that the attached proceedings before the. UNITED STATES NUCLEAR REGULATORY COMMISSION in the matter of: NAME OF PROCEEDING: U. S. ECOLOGY, INC. DOCKET NO.: 27-39 SC - PLACE: Rosemont, Illinois O' oxTE: Tu a 7. Ausu=t 19 1986

were held as herein appears, and that this is the original

! transcript thereof for the file of the United States Nuclear

Regulatory Commission.
                                                               ,   /
                                                       /.'       /

{ (sigt)

                                                    ~

b 1/ fv, / (TYPED) Lisa Jo Selepa sullivan Reporting Co. Official Reporter Reporter's Affiliation f l o O

                                                            %__- _a m-a s -.w .-a    .-.a - -- - -
                                                                                                   -asa.m e 7 6 c/ S c.               t
                                                                                   'AI kPRINTER ASSIGNED TO TERMINAL 26 AT f 0e40 AM MON., f8 AUG., f986               [. /f. f[,

9' I l i 1 I l 4 4 i 4 i l t i 1 l j i k l 1 4 L i l l l l r I e g ! I i i r

PRHT LIST 10089/4435

8608060146 E: 860730 ES: 1 L1 REQUESTS CHANGE TO CURRENT MAILING LIST TO SHOW TR LASH AS L2: HEW DIRECTOR OF DEPT OF HUCLEAR SAFETY.RELATED L3: CORRESPONDEHCE.

FICHE: 37395:198-37395:190 PFL: ADOCK-2700039-C-860730 PACKAGE: 860730-8608060146 10089/4419 ACH: 8608060128 DATEt 860801 PACES: 4 L1: MEMORANDUM LISTING FACTUAL MATTERS TO BE ADDRESSED BY L2: PARTIES AT 860819 PREHEARIHC CONFERENCE RE SHEFFIELD IL LOW L3: LEVEL RADWASTE DISPOSAL SITE. SERVED OH 860804. FICHE: 37401:043-37401:046 PFL: ADOCK-2700039-C-860801 PACKAGE: 860801-8608060128 10089/3682 ACH: 8608040076 DATE: 860729 PACES: 1 L1: PHO-V-86-048:0H 860717 RADWASTE SHIPMENT RECEIVLD FROM L2: WAYHE STATE UNIV & US ECOLOGY INC W-HOLE PUNCHED IN ONE L 3_ RADWASTE DRUl1.HO RADIOACTIVE COHTAMINATION RESULTED. BURIAL I PERHITS 8170 & 7102 SUSPENDED EFFECTIVE 860718.

.,_oHE:
.                37357:194-37357:194 PFL:             I&E--PHO-V-86-48-860729 PACKAGE:         860729-8608040076 10089/839 ACH:             8607180181 DATE:            860714 PAGESt           2 L1:              ORDER FOR PREHEARIHG CONFEREHCE TO COMMENCE OH 860819 PER L2:              RM RADER 860703 LTR. SERVED OH 860715.

FICHE: 37071:112-37071:113 PFL: ADOCK-2700039-C-860714 PACKAGE: 860714-8607180111 10000/6616 ACH: 8607090300 DATE: 860703 PAGES: 1 L1: ADVISES THAT PARTIES AVAILABLE FOR PREHEARING COHFEREHCE RE L2: RADWASTE DISPOSAL SITE ON ANY DAY OF UK COMMEHCIMG 860818 L3: EXCEPT 860821 IN RESPONSE TO ASLB 860613 ORDER. FICHE: 36927:332-36927:332 PFL: ADOCK-2700039-C-860703 PC.CKAGE 860713-8607090300 10000/6605 ACH: 8607090291 r^~E 860703 k ES: 15

L1: ADDL COMMENTS ON SCHEDULING PREHEARING COHFERENCE RE L2: RADWASTE DISPOSAL SITE. CONFERENCE SHOULD BE SCHEDULED IN AUG I - 1986 EEFORE COMMISSION ACTION ON STATE OF IL APPLICATION FOR AGREEMENT STATE AUTHORITY W-CERTIFICATE OF SVC. HE: 36927:250-36927:264 PFL: ADOCK-2700d39-C-860703 PACKAGE: 860703-8607090291 10082/5285 ACH: 8606250527 DATE: 860619 PACES: 1 L1: FORWARDS J HENNESSEY 640707 MEMO RE LAND BURIAL OF SHM IN L2 AGREEMENT STATES PER 860521 REQUEST. MEMO NOT GERMAHE TO L3: SHEFFIELD FACILITY WHICH UAS LICENSED ENTIRELY BY FEDE RAL L4: GOVT.RELATED CORRESPONDEHCE. FICHE: 36855:012-36855:015 FICHE: 68449:316-68449:319 PFL: ADOCK-2700039-C-860619 PACKAGE: 860619-8606250527* 10088/5269 ACH: 8607020197 DATE: 860521 PAGES: 2 L1: REQUESTS ALL DOCUMENTATION RE POSITION OF COMMISSIGH OH L2: POSSESSIGH (SSUE.RELATED CORRESPONDEHCE. FICHE: 3t 347:169-36847:174 PFL: ADOCK-2700039-C-860521 PACKAGE: 860521-8607020197 1[ '8/1897

,_J       8606190083 DATE:     860613 PAGES:    2 Lt:       ORDERS ALL PARTIES TO NOTIFY BOARD WHEN STATE OF IL L2:       ESTABLISHED AGREEMENT STATE STATUE W-REGARD TO STATE L2:       ESTABLISHED AGREEMENT STATE STATUS U-REGARD TO STATE L3:       REGULATION OF SOURCE & BYPRODUCT MATLS & PROPOSE THREE L4:       ALTERNATE DATES FOR PREHEARING CONFERENCE.

FICHE: 36610:191-36610:192 PFL: ADOCK-2700039-C-860613 PACKAGE: 860613-8606190083 10087/3369 ACH: 8605270237 DATE: 860021 PAGES: 2 L1: FORWARDS WJ OLMSTEAD 850918 MEMO RE LEGAL PRECEDENT OH HRC L2: IHTERPRETATIGH OF LICEHSES AUTHORIZING POSSESSION OF SHM PER L3: F0tA 06-247.US ECOLOGY REQUEST FOR SIMILAR DOCUMENTS NOT L4: H0HORED. REQUESTS DOCUMENTS.RELATED CORRESPONDEHCE. FICHE: 36083:200-36083:285 PFL: ADOCK-2700039-C-860521 PACKAGEt 860521-8605270237 10087/910 ACH: 8605190064

   ~~ E t 860407 L     ES: 1

Lir FORWARDS ORNL FINAL LTR REPT 'RESULTS OF SEPT 1985 L2: # GROUNDWATER SAMPLING & ANALYSIS SHEFFIELD IL.' HE: 36015:158-36015:188

ADOCK-2700039-C-860407 KAGE: 860407-8605190064 10087/902 ACH: 8605190053 DATE: 850930 PAGES: 66 L1: 'RESULTS OF RECOHHAISSANCE EVALUATION OF HAZARDOUS CHEMICAL L2s M3GRATION IN GROUNDWATER IN VICINITY OF TWO LOW LEVEL L3: 6 RADWASTE DISPOSAL FACILITIES.'

FICHE: 36015:092-36015:157 PFL: ADOCK-2700039-C-860409 PACKAGE: 8604u9-86051900348 10087/894 ACH: 8605190044 DATE: 860131 PAGES: 30 L1: 'RESULTS OF SEPT 1985 GROUNDWATER SAMPLING & ANALYSIS L2: SHEFFIELD IL.' FICHE: # 36015:064-36015:091 PFL: ADOCK-2700039-C-860409 PT.CKAGE: 860409-8605190034A 10087/886 ACH: 8605190034 DATE: 860409 PAGES: 1 ( ) FORWARDS FINAL 'RESULTS OF RECOHNAISSANCE EVALUATION OF La HAZARDOUS CHEMICAL MIGRATION IN GROUNDWATER IN VICINITY OF L3: , TWO LOW LEVEL RADWASTE DISPOSAL FACILITIES' & 'RESULTS OF L4: SEPT 1985 GROUNDWATER SAMPLING & ANALYSIS SHEFFIELD IL.' FICHE: 36015:063-36015:157 PFL: ADOCK-2700039-C-860409 PACKAGE: 860409-8605190034* 10007/20 ACH: 8605150189 DATE: 860403 PAGES: 2 L1: F01A REQUEST FOR DOCUMENTS RE STATE OF IL AGREEMENT STATE L2: STATUS UNDER SECTION 274 0F ATOMIC EHERGY ACT. FICHE: 36004:043-36004:044 PFL: F03A--RADERG6-247-860403 PACKAGEi 860403-8605150189 10086/5605 ACH: 8605070459 DATE: 860331 PCCES: 2 L1: ' TRENCH 18 MONITORIHC RECORD FOR FIRST GUARTER 1986.' W-L2: 860409 LTR. FICHE: y 35891:146-35891:147 PFL: ADOCK-2700039-C-860331 PACKAGE: 860331-8605070459 1 [^'6/3261 L ): 8604290003

DATE: 860424 PEGES: 6

FOURTH JOINT REPT ON STATUS 0 SETTLEMENT HEGOTIATIONS RE SHEFFIELD IL LOW LEVEL WASTE BURIAL SITE.US ECOLOGY
SHEFFIELD IL LOW LEVEL WASTE BURIALSITE.US ECOLOGY L3: FORMULATING COUNTER-PROPOSAL & WILL BE SUBMITTED TO STATE L4: & HRC IN EARLY MAY 1986. CERTIFICATE OF SVC EHCL..

FICHE: 35742:111-35742:186 PFL: ADOCK-2700039-C-860424 P.CKAGE: 860424-8604290003 10085/5437 ACH: 8604010009 DATE: 820216 PAGES: 2 Lf PARTIALLY WITHHELD DAILY STAFF HOTES FOR 820212.IE ISSUED L2: EHFORCEMENT NOTICE EH-82-03 FOR LICENSEES NOT NEETING 820201 L3: DATE FOR COMPLETION OF PROMPT PUBLIC HOTIFICATION SYS. FICHE: 35347:2G6-35347:287 PFL: F014--HAHAUER85-778-860210 PACKAGE: 860210-86033101384 10085/5411 ACH: 8603310366 DATE: 820211 PAGES: 2 N Lt: SUBMIT,S DAILY STAFF HOTES FOR 820210 ADVISES OF 820216 L2 MEETINCxW-HONEYWELL IN BETHESDA MD TO DISCUSS SPDS & L3: ENERGENCYxRESPONSE. FICHE: 35347:274-35347:275 f ji F0]A--HAHAUER85-778-860210 L >KAGE: 860210-8603310138A 10085/5202 ACH: 8603310138 DATE: 860210 PAGES: 4 Lt RESP DS TO FOIA REOUEST FOR DAILY STAFF HOTES FOR L2: 820111 217. FORWARDS APP A DOCUMENTS. DOCUMENTS BEING PLACED L3: IN PDR.A B DOCUMENTS PARTI ALLY WITHHELD (REF FOI A L4: EXEMPTION ') . FICHE: 35347:247-3s 47:289 PFL: F014--HAHAVER g"-778-860210 PACKAGE: 860210-8603310138* 10083/4332 ACH: 8603260465 DATE: 851231 PCGES: 2 LI: ' TRENCH 18 N0HITORING RECORD FOR PERIOD OCT-DEC 1985.' L2: W-UNDTD LTR. FICHE: 0 35223:380-35223:311 PFL: ADOCK-2700039-C-051231 PACKAGE: 851231-8603260465 10085/1282 ACH: 8603120440 DATE: 850831 P ES:

  • 31 LJ FINAL DRAFT 'REVIEU OF INFO OH SHEFFIELD IL LOW LEVEL WASTE

L2 DISPOSAL SITE.' FICHE: 34915:232-34915:262

ADOCK-2700039-C-860116 KAGE: 860116-8603120433A 11 5/1277 ACH: 8603120433 DATE: 860116 PACES: 1 L1: FORWARDS ' REVIEW OF INFO ON SHEFFIELD IL LOW LEVEL WASTE L2 SITE.'

FICHE: 34915:231-34915:231 PFL: AD OCK-27 0 0 039-C-66 01 16 PACKAGE: 860116-8603120433+ 10084/7468 ACH: 8603040397 DATE: 860227 PAGES: 2 L1: NEMORANDUM & ORDER DIRECTING PARTIES TO FILE FOURTH JOINT L2: REPT OH STATUS OF SETTLEMENT HEGOTIATIONS OH OR BEFORE L3: 860424 SETTING FORTH ACTIONS TAKEN SINCE THIRD JOINT REPT & L4: DESCRIBING OTHER DEVELOPMENTS. SERVED OH 860303. FICHE: 34766:359-34766:360 PFL: ADOCK-2700039-C-860227 PACKAGE: 860227-8603040397 10001/7442 ACH: 8512110430 DATE: 851118 PAGES: 1 [  ; y FORWARDS TRACT DESCRIPTION OF PROPERTY RECENTLY ACQUIRED L_i y ADJ01HING SHEFFIELD FACILITY. ACQUISITION OF AREA ASSlfRES L.3 : g THAT ANY PATHWAYS TO TROUT LAKE IN CONTROL OF COMPANY. FICHE:' 33865:279-33865:279 PFL: ADOCK-2700039-C-851118 PACKAGE: 851118-8512110430 10080/6883 ACH: 8510290559 DATE: 851001 PAGES: 3 L1: TRIP REPT OF 850918-19 VISIT TO SHEFFIELD IL RE LOW LEVEL L2: WASTE DISPOSAL AT FACILITY. FICHE: Y 33245:342-33245:344 PFL: AD OCK-27 0 0 039-C-8510 01 PACKAGE: 851001-8510290559 10080/6532 ACH: 8510280512 DATE: 851004 PAGES: 1 L1: REQUESTS MONTHLY & QUARTERLY RESULTS OF ENVIROH NOHITORING L2 A FOR TRENCH SLINPS LTR SERIES WELLS & CHEMICAL WASTE DISPOSAL L3: g 9 FACILITY LICENSED BY IEPA & ANY RESULTS OF ANALYSES SAMPLES L4: FROM WELLS ADJACEHT TO UNLICENSED CHEMICAL FACILITY. FICHE:o 33199:355-33199:355 PFL: ADOCK-2700039-C-851004 r^'KAGE: 851004-8510280512 IL $0/6519

ACH: 8510280481 DATE: 850801 i- ES: 1

SUMMARY

OF 850730 NEETING W-USGS RE IDHS REQUEST THAT USGS

DECOMMISSION SHEFFIELD FACILITIES.

FICHEr> . 33228:001-33228 001 PFL: ADOCK-27 00 039-C-8508 01 PACKAGE: 850801-8510280481 10080/6310 ACH: 8510280097 DATE: 851002 PAGES: 2 L1: TRIP REPT OF 850918-19 SITE VISIT TO SHEFFIELD LOW LEVEL L2: WASTE FACILITY TO OBSERVE FEATURES & GROUNDWATER MOHITORING L3: O ACTIVITIES CONDUCTED BY ORHL. FICHE: 33228:360-33228:361 4 PFL: ADOCK-2700039-C-851002 PACKAGE: 851002-8510280097 10080/5936 i ACH: 8510240579 DATE: 850815 i PAGES: 1

 ;          Lt                               TELCON W-M HAMEL ON 850815 INVITING STATE OF IL DEPT OF L2:                              HUCLEAR SAFETY TO JOIH HRC & ORHL 850918-19 SITE VISIT TO L3:
  • TAKE SPLIT SAMPLES.0BJECTIVES OF 8600 HAP METHODOLOGY t.

i L4: RESOURCES CONSERVATION & RECOVERY ACT PROCEDURES DISCUSSED. FICHE: 33183:326-33183:326 PFL: ADOCK-2700039-C-850815 f .KAGE: 850815-8510240579 l 1Lvj0/5717 ACH: 8510240102 i DATE: 850930 PAGES: 3 L1: ' TRENCH 18 NDHITORING REPT FOR JUL-SEPT 1985.' W-851004 LTR. FICHE: , 33178:200-33t78:202 PFL: ADOCK-2700039-C-850930 PACKAGE: 850930-8510240102 10080/2741 - ACH: 8580090063 I DATE: 850926 PAGES: 3 Lf: RESPONDS TO FOIA REOUEST FOR INFO ON J HEEL & D GRAVELY t L2: ASSOCIATION W-LISTED COMPANIES RE MAXEY FLATS NUCLEAR

L3
DISPOSAL AREA. FORWARDS APP B DOCUMENTS. APP A & B DOCUMENTS L4: AVAILABLE IN PDR, FICHE: 32963:314-32963:320
PFL: F014--PIERCE 85-619-850926
,          PACKAGE:                          850926-8510090063*

10079/3927 i ACH: 8509100413  ; DATE: 850822 PAGES: 4 / ! Lt - FORWARDS COMMENTS fH 850709 PROPOSAL TO INSTALL INTEGRATED f'g [ GROUHDWATER MON!JORING SYS.9EPARATE REVIEWS BY STATE OF WA L_/ DEPT OF ECOLOGY & HRC ALSO EHCL.

     .--,e...-,m.,y    .

m,. . ,. _ . . ,,.m..,, _ _ _ , , _ , . - . , - . - , - , . . -_m_,.,_____~--.,,,__yy. . _ , , - ~ ., , _ _ _ . _ _ - _,.--___,_~___,----,-,..%-c - . - _ .

FICHE: 32533:330-32533:333 PFL: ADOCK-2700039-C-850822 KAGE: 850822-8509100413 1 9/3890

8509100356 DATE: 850816 PAGES: 5 L1 IHFORMS THAT DECOMMISSIONIhG ACTIVITIES NOT ALREADY L2: AUTHORIZED DY EXISTING LICENSE OR BY COB 1 MISSION REGULATIONS L3: SHOULD HOT TAKE PLACE W-0 PRIOR HRC APPROVAL PER STATE OF L4: IL DEPT OF HUCLEAR SAFETY ENCL 850710 REQUEST TO USGS.

FICHE: 32527:330-32527:334 PFL: ADOCK-2700039-C-850816 PACKAGE: 850816-8509100356 10079/357 ACH: 8501300328 DATE: 841227 PAGES: 4 L1: TRIP REPT OF ATTENDANCE AT SHEFFIELD TRITIUM MIGRATION L2: g STEERING COMMITTEE 841218 MEETING IN SPRINGFIELD IL RE L3: REGULTS OF TECHNICAL STUDIES COMPLETED SIHCE JAN 1984. FICHE: 2G684:133-2G684 136 PFL: ADOCK-2700039-C-341227 PACKAGE: 841227-8501300328 10078/1653 ACH: 8508010393 DATE: 850630 PAGES: 2 i  ; ' TRENCH 18 NOHITORING RECORD APR-JUNE 1985.' W-UNDATED LTR. L JHE: " 31935:361-31935:362 PFL: ADOCK-2700039-C-850630 PACKAGE: 850630-8508010393 10078/1122 ACH: 8507310110 DATE: 850709 DATE: 850729 PAGES: 7 L1: THIRD J01HT REPT RE STATUS OF HEGOTIATIONS FOR SETTLEMENT L2: PROCEEDIGHS, DOE COMPILED SITE-SPECIFIC DATA & DRAFT GUIDANCE L3: FOR PROCEDURES GOVERHING SUBetISSIGH & REVIEW OF L4: APPLICATIONS.W-CERTIFICATE OF SVC.RELATED CORRESPONDENCE. FICHE: 31874:276-31874:282 PFL: ADOCK-2700039-C-G50729 PACKAGE: 850729-8507310110 10077/6406 ACH: 8507220012 DATE: 850614 PAGES:' 30 L1 'a g WORKING DRAFT ' PERSPECTIVE OH GROUNDUATER FLOU AT L2: . SHEFFIELD.' FICHE:' 31699:192-31699:221 PFL: ADOCK-2700039-C-850624 PACKAGE: 85 0624-85 0722 0 010 A 1,r" ]7/64 04

 ; _,j            8507220010

DATE: 850624 PAGES: 1

g FORWARDS UPDATED WORKING DRAFT ' PERSPECTIVE OH GROUNDWATER FLOW AT SHEFFIELD.' REQUESTS CONMENTS & SUGGESTIONS BY
1.  : 850710.

FICHE: 31699 191-31699:221 PFL: ADOCK-2700039-C-850624 PT.CKAGE: 850624-8507220010* 10077/5434 ACH: 8507190122 DATE: 850228 PAGES: 27 Lir FORWARDS RESULTS OBTAINED IN APPLICATION OF METHOD 8600 L2 g ORGAHIC SCREEHING TESTS TO GROUHDWATER SAMPLES FROM L3: SHEFFIELD LOW LEVEL WASTE DISPOSAL SITE. WORK WILL CONTIHUE L4: TO IDENTIFY PREDOMINAHY ORGAHIC COMPOUNDS PRESENT. FICHE: 316602293-31660:319 PFL: ADOCK-2700039-C-850415 PACKAGE: 850415-8507190110B 10077/5430 ACH: 8507190117 DATE: 850206 PAGES: 5 L1: FORWARDS RESULTS OF GROUNDWATER ANALYTICAL PROGRAM FOR L2: SHEFFIELD IL. WATER QUALITY BEST IN WELL 574 & WORST IN L3: 8 TRENCH WELL.AHALYSIS OF NETHOD 8600 NATRIX WILL BE FORWARDED L4: BY 850215. FICHE: 31660:288-31660:292 Ia ADOCK-2700039-C-850415 i.JKAGE: 850415-8507190110A 10077/5425 ACH: 8507190110 DATE: 850415 PAGES: 1 FORWARDS ORHL 850206 PRELIrlINARY RESUL s Ekun SsHPLiHG AT L1r L2: SHEFFIELD LOW LEVEL RADUASTE DISPOSAL SITE.REPT COVERS EPA L3r g PROPOSED METHOD 8600 FOR ORGAHIC CONSTITUENT SCREEHING. L4: SCHEDULE FOR FUTURE LICENSING ACTIVITIES REQUESTED. FICHE: 31660:287-31660:319 PFL: ADOCK-2700039-C-850415 PACKAGE: 850415-8507190110* 10075/6101 ACH: 8502270663 DATE: 850118 PAGES: 3 L1: FORWARDS

SUMMARY

OF QUARTERLY MONITORING DATA OF PIE 20 METERS L2: & WELLS IN VICINITY OF TREHCH 18 & TREHCH 18 SUrlPS FOR L3; OCT-DEC 1984 AS COVERED IN 790423 LTR OF AGREEMENT. FICHE: 0 29134 099-29134:101 PFL: ADOCK-2700039-C-850119 PACKAGE: 850118-8502270663 10075/4801 ACH: 8506030439 l F'".E 850529 is ..ES r 2

L1: P.EMORANDUM & ORDER REQUIRING PARTIES TO REPT JOINTLY ON L1: HENORANDUM & ORDER REQUIRING PARTIES TOI REPT JOINTLY OH I  : STATUS OF SETTLEMENT HEGOTIATIONS BY 850729. SERVED OH STATUS OF SETTLEMENT HEGOTIATIOS BY 850729. SERVED OH 850531.

850531.

FICHE: 30678:068-30678:069 PFL: ADOCK-2700039-C-850529 PACKAGE: 850529-8506030439 ' 10074/683 ACH: 8504180024 DATE: 850331 PAGES: 2 i L1:

SUMMARY

OF QUARTERLY MONITORING DATA 0F PIE 20 METERS L2: & WELLS IN VICINITY OF TREHCH 18 & TRENCH 18 SUMPS FOR FIRST L3: fg QUARTER 1985.W-850326 LTR. FICHE: 29920:218-29920:219 PFL: ADOCK-2700039-C-850331 PACKAGE: 850331-8504180024 10073/5815 ACH: 8504080339 DATE: 850304 PAGES: 3 L1: TRIP REPT OF 850228 VISIT TO SPRINGFIELD IL RE MEETING W-L2: IL DEPT OF HUCLEAR SAFETY & J LABEHAU OFC OF STATE PROGRAMS L3: COHCERNING PROGRESS TOWARDS AGREEMENT STATE STATUS, FICHE: 29711:282-23711:284 PFL: ADOCK-2700039-C-850304 PACKACE: 850304-8504080339 1( ]3/1516 L .): 8503200236 DATE: 850331 PAGES: 54 L1: ANALYSES OF SOILS FROM AN AREA ADJACENT TO THE LOW-LEVEL L2t RADI0 ACTIVE WASTE DISPOSAL SITE AT SHEFFIELD ILLIHOIS. FICHE: tth 29470:255-29470:303 PFL: ADOCK-2700039-C-850331 PACKAGE: 850331-8503200236 10072/5248 ACH: 8503040014 DATE: 850131 PAGES: 196 Lt EVALUATIGH OF THE RADIGACTIVE INVENTORY IN AND ESTIMATION OF L2: ISOTOPIC RELEASE FROM THE WASTE IN EIGHT TRENCHES AT THE L3: Ets SHEFFIELD LOW-LEVEL WASTE BURIAL SITE. FICHE: 29197:113-29197:308 PFL: ADOCK-2700039-B-850131 PACKAGE: 850131-8503040014 10072/5145 ACH: 8503010326 DATE: 850116 PAGES: 8 L1: FORWARDS RESULTS OF ORGAHIC AHALYSES FOR SAMPLES COLLECTED L2 OH 840719 FROM WELLS 511 514 516 535 563 L TRENCH 18 $ UMP.

! ' ',      k     ABOVE BACKGROUND CONCENTRATIONS FOUND IN WELLS 516 563 &

Ej TREHCH 18 SUMP.

FICHE: 29187:167-29187:174 PFL: ADOCK-2700039-C-850116 KAGE: 850116-8503010326 1 2/4718 1: 8502280547 DATE: 850122 PAGES: 2 L1 FORWARDS INFO RE GEOLOGICAL INVESTIGATIONS OF LOW LEVEL L2: g HUCLEAR WASTE DISPOSAL SITE IN SHEFFIELD IL ON 850427 PER L3: T LASH SUGGESTIOH. FICHE: 29169:171-29169:172 PFL: ADOCK-2700039-C-850122 PACKACE: 850122-8502280547 10070/5554 ACtli 8501070580 DATE: 841213 PAGES: 8 L1: INSP REPT 27-0039-84-01 ON 841115-16.H0 NOHCOMPLIANCE L2: H0TED. MAJOR AREAS INSPECTED: RADIOLOGICAL & ENViROH L3:  % PROTECTION INCLUDING ORGANIZATION CHANGES AUDITS SECURITY L4: INSTRUMENTATION TRAINING & RETRAINING. FICHE: 28217:188-28217:195 PFL: ADOCK-2700039-C-841213 PACKAGE: 841213-8501070575A 10070/5550 ACH: 8501070575 DATE: 841213 PAGES: 2 [Lm ; , FORWARDS INSP REPT 27-0039-84-01 OH 841115-16,HO H0HCOMPLIANCE HOTED. FICHE: g 28217:186-28217:195 PFL: ADOCK-2700039-C-841213 PACKAGE: 841213-8501070575* 10068/2206 ACH: 8410120062 DATE: 840702 PAGES: 4-L1s COMMENTS OH RECENT STATEMENTS RE SHEFFIELD LOW LEVEL L2: DISPOSAL SITE PER 840618 REQUEST. CLAIMS RE PU MIGRATIOH L3: DANGEP TO RESIDENTS HEALTH STATE OF IL CLEANUP EXPENDITURES L4: o & BUSINESS RELOCATION UNTRUE. FICHd: 26976:229-26976:232 PFL: ADOCK-2700039-C-840702 PACKAGE: 840702-8410120062 10068/2139 ACH: 8410110580 DATE: 840815 ,/' PACES: 4 / L1: FORWARDS REVISED B&W STRUCTURAL' CALCULATIONS FOR PROPOSED L2: BURIAL OF PACKAGES FOR HRC APPROVAL. FICHE: 26940:321-26942:324 PFL: y ADOCK-2700039-C-840015 PACKAGE: 840815-8410110580 tr^*8/1386 i ,. 8410100309

DATE: 841005 P10ES: 3

WASTE PACKAGING INSP REPT 15000046-84-08 OH 840927-28.HO H0HCOMPLIANCE OR VIOLATIONS OBSERVED. MAJOR AREA IHSPECTED:
LOW LEVEL RADWASTE SHIPMENTS & ASSOCIATFD INSPS C0HDUCTED L4: BY STATE OF WA RESIDEHT INSPECTORS.-

FICHE: 26892:227-26892:229 PFL: ADOCK-2700039-C-841005 PACKAGEt 841005-8410100299A 10068/1379 ACH: 8410100299 DATE: 841005 PACES: 1 L1: FORWARDS WASTE PACKAGING INSP REPT 15000046-84-08 OH L2 840927-28.HO H0HCOMPLIANCE IDENTIFIED. FICHE: 26892:226-26892:229 PFL: ADOCK-2700039-C-841005 PACKAGE: 841005-8410100299* 10067/4564 ACH: 8409200337 DATE: 840031 PAGES: 3 L1 FORWARDS D ED 840827 MEMO RE ANALYSIS OF SHEFFIELD WATER FOR L2 PU.NO EVIDENCE OF PU NIGRATION DETECTED. FICHE: Ab 26611:257-26611:259 PFL: ADOCK-2700039-C-840831 PACKAGE: 840031-8409200337 10066/2271

;     ):     3408060026 L_.Et        840630 PAGES:       2 L1:          ' PIE 20 METERS & WELLS TRENCH 18 MONITORING REPT APR-JUNE L2:       gg 1984.' W-840706 LTR.

FICHE: 25936:360-25936:361 PFL: ADOCK-2700039-C-840630 PACKAGE: 840630-8408060026 10064/5671 ACH: 8406110425 DATE: 840517 PAGES: 2 L1: REQUESTS LEGAL OPINIGH RE APPLICABILITY OF SUBSECTION 151(B) L2: OF NUCLEAR WASTE POLICY ACT TO TRANSFER OF SHEFFIELD LOW L3: LEVEL WASTE DISPOSAL FACILITY TO DOE. FICHE: 24882:356-24882:357 PFL: ADOCK-2700039-C-840517 PACKAGE: 840517-8406110425 10064/5443 ACH: 8406110147 DATE: 840413 PAGES: 5 L1: FORWARDS TRIP REPT 84 04 04 11EET ING IN CHICAGO IL W-STATE OF L2: IL US ECOLOGY & DOE RE POSSIBLE TRANSFER OF SHEFFIELD SITE L3: TO D0t. F"'HE: 24882:014-24882:018 k_2 : ADOCK-2700039-C-840413

PACKA3E 840413-8406110147 10064/4279 1: 8406050417 E: 840531 ES: 3 L1 NOTICE OF APPEARANCE IN PROCEEDING. CERTIFICATE OF SVC ENCL. FICHE: 24609:177-24809:179 PFL: ADOCK-2700039-C-840531 PT.CKAGE: 840531-8406050417 10064/1138 ACH: 8405260398 DATE: 840409 PAGES: 1 L1 MOD 6 EXTENDING PERIOD OF PERFORMAHCE TO 850331 AT HO COST L2 TO ' EVALUATION OF LOCATIONS & RATES OF GROUNDWATER DISCHARGE L3: FRON SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY.' FICHE: 24682:203-24682:203 PFL: CONTR--HRC-2-80-69-840409 PACKAGE: 840409-8405260392A 10064/1132 ACH: 8405260392 DATE: 840409 PAGES: 1 Lir HOTIFICATION OF CONTRACT EXECUTIOt' MOD 6 TO ' EVALUATION OF L2: LOCATIONS & RATES OF GROUNDWATER DISCHflGE FROM SHEFFIELD L3: LOW LEVEL WASTE DISPOSAL FACILITY.' C0r-(RACTOR:USGS. FICHE: 24682:202-24682:203 PifL: C0HTR--HRC-2-80-69-840409

   ~KAGE:   840409-8405260392*

1Lm33/6805 ACH: 8405170351 DATE: 840430 PAGES: 2 L1 MOD 10 EXTENDING PERIOD OF PERFORMANCE TO 850930 & REVISING L2: STATEMENT OF WORK TO 'SHIEFFIELD TREHCH CAP STUDY.' FICHE: 24500:283-24500:284 PFL: CONTR--HRC-2-80-74-840430 PACKAGE: 840430-8405170350A 10063/6804 ACH: 8405170350 DATE: 840430 PAGES: 1 L1: HOTIFICATION OF CONTRACT EXECUTION MOD 10 TO 'SHEFFIELD L2: TRENCH CAP STUDY.' CONTRAC10R: UNIV 0F ILLINDIS. FICHE: 24500:282-24500:284 PFL: CONTR--HRC-2-80-74-840430 PACKAGE: 840430-8405170350* 10063/3217 ACH: 8404300239 DATE: 840326 PAGES: 6 L1 SHEFFIELD LOW LEVEL WASTE DISPOSAL SITE MONTHLY UPDATE FOR L2 g ENVIROH SURVEILLANCE DATA AS OF 840326. IlHE: 24253:083-24253:089 k_l: ADOCK-2700039-C-840326

FECKAGE: 840326-8404300239 1(1023/3190 is 8404300197 E: 840328

     ;ES:    3 LI:          ACK RECEIPT OF 840313 RESPCHSE TO HRC REQUEST FOR ACTION IN L2:          INPLEMENTING CONTRACT AGREEMENT TO FURNISH US ECOLOGY L3:          RADI0 ACTIVE SHIPPING RECORDS OH COMPUTER TAPE.HRC UNABLE TO L4:          SIGH AGREEMENT IN PRESENT FORM.

FICHE: 24233:093-24233:095 PFL: ADOCK-2700039-C-840328 PACKAGE: 840328-8404300197 10062/8175 ACH: 8404160038 DATE: 840331 PAGES: 2 Lf: 'TREHCH 18 MONITORING RECORD FOR JAH-MAR 1984.' W-840330 L2: LTR, g FICHE: 24043:119-24043:120 PFL: ADOCK-2700039-C-840331 PACKAGE: 840331-8404860038 10062/6671 ACH: 8404100056 ' DATE: 840313 PAGES: 3 Lf HOTIFIES OF 840404 MEETING W-DOE & US ECOLOGY CORP IN L2: CHICAGO IL TO REVIEW PROCEDURES TO TRANSFER SHEFFIELD L3: RADWASTE DISPOSAL SITE TO DOE PER HUCLEAR WASTE POLICY ACT. I 7HE: 22982:348-22992:350 F t. : ADOCK-2700039-C-840313 PACKAGE: 840313-8404100056 10062/2620 ACH: 8403220218 DATE: 840309 PAGES: 2 L1: INFORMS OF ESTABLISHMENT OF TASK WORKING GROUP TO FORMULATE L2: ALTERHAlIVE STRATEGIES FOR TRANSFER OF SHEFFIELD LOW LEVEL L3: WASTE DISPOSAL FACILITY TO DOE. RESPONSE REQUESTED BY 840308 L4: AS TO ASSIGNMENT OF STAFF REPRESENTATIVES. FICHE: 22721:357-22721:358 PFL: ADOCK-2700039-C-840309 PACKAGE: 840309-8403220218 10062/2149 ACH: 8403200317 DATE: 840221 PAGES: 3 Lt: FORWARDS AGENDA FOR 840228-29 TECHNICAL MEETINGS AT L2: SPRINGFIELD IL TO REVIEW EXISTING MONITORING PROGRAMS L3: & POSSIBLE MONITORING PROGRAM AFTER SITE CLOSURE. FICHE: 22709:164-22709:166 PFL: ADOCK-2700039-C-840221 PACKAGE: 840221-8403200317 10062/1275 (' '1: 8403160077 LjE 840221

PACES: 2 L1: TRIP REPT OF ATTENDANCE AT SHEFFIELD TRITIUM MIGRATION STUDY I  : STEERING C0f1MITTEE 940119 MEETING RE FISCAL ARRANGEMENTS g GROUNDWATER TRACER STUDY TEMP SURVEYS & ADDL DATA HEEDS. HE: 22662:284-22662:285 PFL: ADOCK-2700039-C-840221 PACKAGE: 840221-8403160077 10061/7428 ACH: 8403070383 DATE . 840301 PAGEst 1 L1: MOD 5 CHANGING HAME OF PROJECT OFFICER TO ' EVALUATION OF L2: LOCATIGH5 & RATES OF GROUNDWATER DISCHARGE FROM SHEFFIELD L3: LOW LEVEL WASTE DISPOSAL FACILITY.' FICHE: 22567:042-22567:042 PFL: CONTR--NRC-2-80-69-840301 PACKAGE: 840301-8403070380A 10061/7425 ACH: 8403070380 DATE: 840303 PAGES: 1 L1: NOTIFICATIGH OF COHTRACT EXECUTION MOD 5 TO ' EVALUATION OF L2: LOCATIONS & RATES OF GROUHDWATER DISCHARGE FROM SHEFFIELD L3: LOW LEVEL WASTE DISPOSAL FACILITY.' COHTRACTOR:USGS. FICHE: 22567:041-22567:042 PFL: CONTR--NRC-2-8 0-69-84 03 01 PACKAGE: 540301-8403070380* 10061/5737 ( 1: 8403010344 L., ; E 840210 PAGES: 1 L1: REQUESTS CORRECTION IN DISTRIBUTION LIST TO REFLECT L2: JS GOODIE AS ASSISTAHT ATTY GCHERAL. FICHE: 22449:353-22449:353 PFL: ADOCK-2700039-C-840210 PACKAGE: 840210-8403010344 10061/4765 ACH: 8402280386 DATE: 840227 PAGES: 3 L1 HOTICE OF APPEARANCE IN PROCEEDING. CERTIFICATE OF SVC EMCL. FICHE: 22402:252-22402:254 PFL: ADOCK-2700039-C-840227 PACKAGE: 840227-8402280386 10061/3063 ACH: 8402220297 DATE: 840217 PAGES: 1 L1: ADDENDUM TO IE INSP REPT 27-0039-83-01 CONSISTING OF RESULTS L2: OF LIQUID SAMPLES COLLECTED DURING INSP. FICHE: # 22335:349-22335:349 PFL: ADOCK-2700039-C-840217 PACKAGE: 840217-8402220294A tr'31/3060 U: 8402220294

{ DATE: 840217 PAGES: 1 FORWARDS ADDENDUM TO IE INSP REPT 27-0039-83-01 CONSISTING {

          \   OF RESULTS OF LIQUID SAMPLES COLLECTED & SPLIT W-
4 REPRESENTATIVES DURING INSP.

FICHE: 22335:348-22335:349 PFL: ADOCK-2700039-C-840217 PACKAGE: 840217-8402220294* 10061/2807 ACH: 8402220008 DATE: 840213 PACES: 3 L1: FORWARDS

SUMMARY

OF 840119 MEETING OF STEERING COMMITTEE ON L2 , TRITIUM MIGRATION INVESTIGATION AT SITE. FICHE: 22335:213-22335:215 PFL: ADOCK-2700039-C-840213 PACKAGE: 840213-8402220008 10061/1691 ACH: 8402160237 DATE: 840210 PACES: 5 L1: HOTICE OF APPEARANCE IN PROCEEDING. WITHDRAWAL OF APPEARANCE L2: FOR BA CHASHOFF & CERTIFICATE OF SVC ENCL. FICHE: 22276:336-22276:339 PFL: ADOCK-2700039-C-840210 PACKAGE: 840210-8402160237 10060/8049 ACH: 8402100338 [ !E : 840131

b. .ES: 5 Ltc FORWARDS PROPOSED AGEHDA FOR 840216-17 MEETING W-STATE OF IL L2: GEOLOGICAL SURVEY AND ATTY GENERAL OFC TO DEFIHE CURRENT L3: MONITORING PROGRAM & 10 ASSESS LOHG-TERM PROGRAM. COMMENTS L4: REQUESTED BY 840207.

FICHE: 22208:355-22208:359 PFL: ADOCK-2700039-C-840131 PACKAGE: 840131-8402100338 10059/7831 ACH: 8401130009 DATE: 831221 PAGES: 9 Lik SUMMARIZES 831212-13 CONFERENCE IN CHICAGO IL RE ADVANCES IN L2:. IHFILTRATION. TOPICS INCLUDED PERFORMANCE OF SHALLOW LAND L3: BURIAL LOW LEVEL WASTE DISPOSAL & U MILL TAILINGS RECOVERY & L4: DISPOSAL. FICH : 21820:355-21820:363 PFL: ADOCK-2700039-C-831221 PACKAGE: 831221-8401130009 10059/3236 ACH: 8312270205 DATE: 830929 PAGES: 2 Ltc RESPONDS TO FOIA REQUEST FOR LIST OF NRC LICENSES GRANTED [^} L_- FOR HIGH LEVEL WASTE LOW LEVEL UASTE & MILL TAILING FGR 1981 TO PRESENT. FORWARDS LIST OF LOW LEVEL WASTE DISPOSAL SITES.

L4: HIGH LEVEL DISPOSAL FACILITIES HEVER LICENSED. FICHE: 21629:310-21629:311

F03A--KRELLEH83-536-830929 KAGE: 830929-831227028S 1 9/2799 ACH: 8312220144 DATE: 83tt28 PAGES: 1 L1 INFORMS THAT HRC RAISES NO OBJECTIONS TO INSTALLATION OF L2: ADDL SOIL BORINGS PROVIDING INSTALLATION IN HONDESTRUCTIVE L3:
  • NAHHER TO SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY.IHF0 L4: RE LOCATIONS OF BORINGS REQUIRED.

FICHE: 21605:34G-21605:346 PFL: ADOCK-2700039-C-831128 PACKAGE: 831f28-8312220144 10059/2798 ACH: 8312220143 DATE: 831202 PAGES: 5 L1 FORWARDS REPT OH TRITIUM MICRATION STUDY 831117 MEETING IN L2 CHAMPAIGH IL. FICHE: O 21605:347-21605:351 PFL: ADOCK-2700039-C-831202 PACKAGE: 831202-8312220143 10059/1164 ACH: 8302010608 DATE: 830114 PAGES: 5 I) IE INSP REPT 27-0039-02-02 OH 821214-15.NO H0HCOMPLIANCE Lms NOTED. MAJOR AREAS lHSPECTED:0RGANIZATIONAL CHANGES AUDITS L3: SECURITY INSTRUMENTATION TRAINIHG AIR SAMPLING PROGRAM & L4: # ENVIRON NOH1TORING. FICHE; 16978: 132-16978:136 PFL: ADOCK-2700039-C-830117 PACKAGE: 830117-8302010600A 10059/1163 ACH: 8302010600 DATE: 830117 PAGES: 2 L1: FORWARDS IF INSP REPT 27-0039-82-02 OH 821214-15.HO L2: 6 HOHCOMPLIANCE HOTED. FICHE: 16978:130-16978:136 PFL: ADOCK-27 0 0 039-C-83 01 17 PACKAGE: 830187-8302010600* 10058/8088 ACN 8203110248 DATE: 820223 PAGES: 6 LI: IE IHSP REPT 27-0039-82-01 OH 82v209.NO H0HCOMPLIANCE L2: HOTED.NAJOR AREAS INSPECTED:0FFSITE USGS MONITORING WELLS L3: g EAST OF FORMER LICENSEE'S PROPERTY IN RESPONSE TO REPTS OF L4: ELEVATED TRITIUM CONCENTRATIONS. FICHE: 12215:146-12215:151

 '~,            ADOCK-2700039-C-820223 LjKAGE:        820223-8203110244A

10058/8087 ACH: 8203110244 E: 820223 ES: 2 g FORWARDS IE INSP REPT 27-0039-82-01 OH 820209 OF ACTIVITIES L2 UNDER LICENSE 13-10014-01.HO N0HCOMPLIANCE HOTED. FICHE: 12215:144-12215:151 PFL: ADOCK-2700039-C-820223 PACKAGER 820223-8203110244* 10058/7782 ACH: 8109290708 DATE: G10924 PAGES: 8 L1: IE IHSP REPT 27-0039-81-01 OH 810908-09.H0HCOMPLIANCE NOTED: L2: FAILURE TO SAMPLE SURFACE WATER RUNOFF. FICHE: $ 09923:101-09923:108 PFL: ADOCK-2700039-C-810924 PACKAGE: 8t0924-81092907008 10058/7781 ACH: 8109290704 DATE: 810924 PAGES: 1 L1: HOTICE OF VIOLATION FROM INSP OH 810908-09. FICHEt 09923:100-09923:100 PFL: k ADOCK-2700039-C-810924 PACKAGE: 810924-81092907004 10058/7780 ACH: 8109290700 f lEr 810924

, JES:      2 L1:         FORWARDS IE IHSP REPT 27-0039-81-01 OH 810908-09 & HOTICE OF L2:         VIOLATION.

FICHE: 09923:098-09923:099 PFL: ADOCK-2700039-C-810924 PACKAGE: 810924-8109290700* 10058/7275 ACH: 8312190094 DATE: 831129 PAGES: 3 L1: FORWARDS

SUMMARY

OF 831117 TECHHICAL UPDATE MEETING RE L2: TRITTUM MIGRATION.HEXT MEETING TENTATIVELY SCHEDULED FOR L3: 840119. FICHE: 9 21571:341-21571:343 PFL: ADOCK-2700039-C-831129 PACKAGE: 83t129-8312190094 10058/7246 ACH: 8312190040 DATE: 831201 PAGES: 5 L1: IE INSP REPT 27-0039-83-01 OH 831122-23.H0 H0HCOMPLIANCE L2: H0TED. MAJOR AREAS INSPECTED: RADIOLOGICAL & ENVIROH L3: _ PROTECTION INCLUDING ORGANIZATIONAL CHANGES AUDITS SECURITY L4: I INSTRUMENTATION TRAINING & RETRAINING.

"^9HE:      21568:255-21568:259 k ji        ADOCK-2700039-C-831201

PACKAGE: 831201-8312190033A 10058/7241 1: 8312190033 E: 831201

     'ES:            2 L1                   FORWARDS IE INSP REPT 27-0039-83-01 OH 831122-23 0F L2:                  ACTIVITIES UNDER LICENSE 13-10 014-01.HO HOHCOMPLI AHCE HOTED.

FICHE: , 9) 21568:253-21568:259 PFL: ADOCK-2700039-C-831201 PACKAGE: 831201-8312190033*: 10058/6831 ACH: 8312150253 DATE: 831121 PAGES: 1 L1 , FORWARDS LTRS ISSUED BY IL DEPT OF HEALTH GRANTING VARIANCES L2. TO RADIOACTIVE MATLS LICENSE INVOLVING RECEIPT & DISPOSAL OF L3s  %) WASTE EXCEEDING 1 CI PER CUBIC FT CRITERIA.W-0 ENCL. FICHE 21539:360-21539:360 PFL: ADOCK-2700039-C-831121 PACKAGE: 83t121-8312150253 10058/5497 ACH: 8312090196 DATE: 831129 PAGES: 3 Liz FORWARDS

SUMMARY

OF 831117 TECHNICAL UPDATE MEETING W-US L2: ECOLOGY IDHS USGS GRANT ASSOC ISGS & IL ATTY GENERAL OFC L3: IN CHAMPAIGH-URBAMA IL RE TRITIUM MIGRATION INVESTIGATION L4: 8 FUNDfHG & STATUS OF INVESTIGATION.

     'HE:            21427:274-21427:276 r   i:               ADOCK-2700039-C-831129 PACKAGE:             831129-8312090196 10058/5344 ACH:                 8312090024 DATE:                831116 PAGES:               1 L1:                  INFORMS THAT D GOODE ASSIGHED AS HEW HYDROLOGIC L2:                  REPRESENTATIVE OH TRITIUM MICRATION STUDY.

FICHE: 21443:361-21443:361 PFL: ADOCK-2700039-C-831116 PACKAGE: 831116-8312090024 10058/5030 ACH: 83t2070441 DATE: 83t118 PAGES: 3 L1: TRIP REPT OF ATTENDANCE AT 830929-30 MEETINGS W-BHL & IDHS L2: IN SPRINGFIELD IL RE RADIOLOGICAL SAFETY REVIEW. FICHE: qn 21418:333-21418:335 PFL: A00CK-2700039-C-831118 PACKAGE: 83t118-831207044i 10058/4021 ACH: 8312050307 DATE: 831115 PAGES: 13 P^, J0tHT REPT OH STATUS OF SETTLEMENT HEGOTIATIONS ADDRESSING LJ HINE ISSUES.HEGOTIATIONS SHOULD CONTINUE & HEARINGS HEED

L2: HINE ISSUES. NEGOTIATIONS SHOULD CONTIHUE HOWEVER HEARIHGS L3: HEED HOT BE HASTEHED. CERTIFICATE OF SVC EHCL. L : HOT BE HASTEHED. CERTIFICATE OF SVC EHCL. NOT BE HASTERHED. CERTIFICATE OF SVC EHCL. HE: 21375:316-21375:328 PFL: ADOCK-2700039-C-831115 PACKAGE: 831115-83t2050307 10058/775 ACH: 838t210128 DATE: 831107 PAGES: 1 L1: HOTIFIES OF 831117 MEETING W-USGS HRC US ECOLOGY & STATE OF L2: - IL IN URBAHA IL RE SHEFFIELD TRIT 10M MICRATION STUDY. FICHE: 21241:252-21241:252 PFL: ADOCK-2700039-C-831107 PACKAGE: 831107-8311210128 ' 10037/5728 ACil: 8311080260 DATE: 830926 PAGES: 3 Liz FORWARDS MINUTES OF 830826 MEETING IN RESTON VA RE OVERVIEW L2 OF USGS ACTIVITIES AT SHEFFIELD LOW LEVEL WASTE DISPOSAL E L3: FACILITY. FICHE: 21113:359-21113:361 PFL: ADOCK-2700039-C-830926 PACKAGE: 830926-83f1080260 10057/2516 ACH: 8310260268 IE: 831024 L.JES: 1 L1: ORDER GRANTING STATE OF IL 831021 MOTIOH FOR 15-DAY L2: EXTENSIGH TO REPT JOINTLY ON STATUS OF SETTLEMENT L3: HEGOTIATIONS.REPT DUE BY 831115. FICHE: 20912:02f-20912:021 PFL: ADOCK-2700039-C-831024 PACKAGE: 831024-831026026G 10057/1710 ACH: 8310250051 DATE: 831019 PAGES: 1 L1: HOTICE OF CHANGE OF ADDRESS & OF ADDITION OF DL ETCHISON L2: TO SVC LIST.RELATED CORRESPONDENCE. FICHE: 20094:198-20894:198 PFL: ADOCK-2700039-C-831019 PACKAGE: 831019-8310250051 10057/1709 ACH: 8310250049 DATE: 831019 PAGES: 4 Lit MOTION FOR 15-DAY EXTENSION TO REPT JOINTLY OH STATUS OF L2: SETTLEMENT HEGOTIATIONS W-HRC & LICENSEE DUE TO CHANGE IN L3: RESPONSIBLE PARTIES & PARTY LOCATION. CERTIFICATE OF SVC L4: EHCL.

   'HE:       20894 170-20894:173

[" k 2: ADOCK-2700039-C-831049

PJ:CKAGE: 831019-8310250049 10056/7774 4: 8310170390 El 830930

     ;ES :     2 L1             

SUMMARY

OF OUARTERLY MONITORING DATA 0F PIE 20 METERS & WELLS L2: IN VIC1HITY OF TREHCH 18 & TRENCH 18 SUMPS FOR JUL-SEPT L3: #3 1983.W-830929 LTR. FICHE: 20785:033-20785:034 PFL: ADOCK-2700039-C-830930 PACKAGE: 830930-8310170390 10056/6544 ACH: 8310120063 DATE: 830731 PAGES: 4 L1: QUARTERLY MONITORIHG DATA 0F PIE 20 METERS & WELLS IN VICINITY L2: OF TRENCH 18 & TRENCH 18 SUMPS FOR OCT 1982 - JUL 1983. L3: t W-830915 LTR. FICHE: 20697:169-20697:172 PFL: ADOCK-2700039-C-830731 PACKAGE: 830731-8310120063 16056/5348 ACH: 8310060184 DATE: 830923 PAGES: 1 Lir MOD 9 ADDING FUNDS TO ARTICLE III FOR CONTRACTOR TO ATTEND L2: CONFERENCE IN DENVER CO TO 'SHEFFIELD TRENCH CAP STUDY. ' FICHE: 20660:362-20660:362 i 1: CONTR--HRC-2-80-74-830923 i.-.JKAGE: 830923-8310060140A 10056/5314 ACH: 8310060140 DATE: 830923 PAGES: 1 L1 HOTIFICATION OF CONTRACT EXECUTION MOD 9 TO 'SHEFFIELD L2s TRENCH CAP STUDY.' CONTRACTOR: UNIV OF ILLINOIS. FICHE: 20660:361-20660:362 PFL: CONTR--NRC-2-80-74-830923 PACKAGE: 830923-8310060140* 10056/5201 ACH: 8310050560 DATE: 831003 PAGES: 4 Lir JOINT NOTION TO CONTINUE PROCEEDINGS THROUGH 840229 TO L2: PERMIT ADDL TIME FOR SETTLENEHT NEGOTIATION. CERTIFICATE OF LJ: SVC EHCL, PFL: ADOCK-2700039-C-831003 PACKAGE: 831003-8310050560 10056/5198 ACH: 8310050557 DATE: 831003 PAGES: 4 L1: J01HT MOTION TO CONTINUE PROCEEDINGS THROUGH 840229 TO [ PERMIT ADDL TIME FOR SETTLEMENT HEGOTIATION. CERTIFICATE OF O SVC EHCL.

FICHE: 20632:174-20632:177 PFL: ADOCK-2700039-C-831003 KAGE: 831003-8310050557 1 6/4415 4: 8310040194 . DATE: 830930 PAGES: 3 L1: MEMORAHDUM & ORDER REQUIRING PARTIES TO REPT JOINTLY OH L2: STATUS OF SETTLEMENT HEGOTIATIONS BY 831031. ISGUES TO BE L3: ADDRESSED IN REPT LISTED. FICHE: 20608:249-20608:251 PFL: ADOCK-2700039-C-830930 PACKAGE: 830930-8310040194 10055/5522 ACH: 8309120107 DATE: 830829 PAGES: 1 Lir MOD 8 MODIFYING ARTICLE III TO 'SHEFFIELD TRENCH CAP STUDY.' FICHE: 20348:311-20348:311 PFL: CONTR--NRC-2-80-74-830829 PACKAGE: 830829-8309120104A 10055/5519 ACH: 8309120104 DATE: 830829 PAGES: 1 L1: NOTIFICATION OF COHTRACT EXECUTION MOD 8 70 'SHEFFIELD L2: TRENCH CAP STUDY.' CONTRACTOR: UNIV 0F ILLINDIS. FICHE: 20348:310-20348:311

,: CONTR--HRC-2-80-74-830829 i .JKAGE : 830829-8309120104*

10054/6073 ACH: 8308180721 DATE: 830811 PAGES: 3 L1: TRIP REPT OF 830727-28 VISIT TO SHEFFIELD LOW LEVEL WASTE L2: DISPOSAL FACILITY TO INSPECT INFILTRATION LIMITING TREHCH L3: 8 COVERS. FICHE: 20102:271-20102:273 PFL: ADOCK-2700039-C-830811 PACKAGE: 830811-8308180721 10054/4191 ACH: 8308110190 DATE: 830725 PAGES: 2 L1: ADDENDUN TO IE INSP REPT 27-0039-82-02 CONSISTING OF L2 g ANALYSES OF LIQUID SAMPLES. FICHE: 20004:124-20004:125 PFL: ADOCK-2700039-C-830725 PACKAGE: 830725-8308110187A 10054/4188 ACH: 8308110187 DATE: 630725 PAGES: 1 P^7  % FORWARDS ADDENDUM CONSISTING OF DATA SHEETS TO IE INSP L; REPT 27-0039-82-02 TRANSMITTED 830117.RESULTS ARE FOR

L3: ANALYSES OF LIQUID SAMPLES. FICHE: 20004:123-20004:125 L: ADOCK-2700039-C-830725 KAGE: 830725-8308110187* 1 4/3001 ACH: 8308090267 DATE: 830727 PAGEC: 2 Liz MOD 7 ADDING FUNDS FOR f1ICROFICHE REQUIREMENTS & AMENDIHG L2: AUTHORIZED REPRESENTATIVE TO 'SHEFFIELD TRENCH CAP STUDY.' FICHE: 19994:358-19994:359 PFL: ADOCK-2700039-C-830727 PACKAGE: 830727-8308090261A 10054/2995 ACH: 8308090261 DATE: 830727 PAGES: 1 L1: HOTIFICATION OF CONTRACT EXECUTION MOD 7 TO 'SHEFFIELD L2s TRENCH CAP STUDY.' CONTRACTOR: UNIV 0F IL. FICHE: 19994:357-19994:359 PFL: ADOCK-2700039-C-830727 PACKAGE: 830727-8308090261* 10052/6864 ACH: 8306240391 DATE: 830613 PAGES: 1 L1: FORWARDS RESULTS OF SHEFFIELD ANALYSIS & LISTING OF SAMPLES L2: COLLECTED IN 1983 AUAITING LAB AHALYSIS. UPDATED ANALYSIS

                #' REPT WILL BE SUBMITTED.W-0 EHCL.

l EmeHE: 18987:349-18987:349 PFL: ADOCK-2700039-C-830613 PACKAGE: 830613-8306240391 10051/1496 ACH: 8305110180 DATE: 830125 PAGES: 3 L1: TRIP REPT OF 821201-02 SITE VISIT TO SHEFFIELD IL RE SITE L2: SURFACE VEGETATION & DRAINAGE FEATURES. FICHE: 6 18434:257-18434:259 PFL: ADOCK-2700039-C-830125 PACKAGE: 830125-8305110180 10050/6765 ACH: 8305030517 DATE: 830429 PAGES: 4 L1: J0!HT MOTIGH TO C0HTINUE PROCEEDIHCS UHTIL 830718 TO PROVIDE L2: ADDL TIME FOR SETTLEMENT HEGOTIATIONS. CONTINUED PROGRESS HAS L3: BEEN MADE. CERTIFICATE OF SVC EHCL. FICHE: 18294:176-18294:179 PFL: ADOCK-2700039-C-830429 PACKAGE: 830429-8305030517 10050/3494 ACH: 8304210423 i'~7E 830413

   ! iES:          1

L1r g3 'TRENCll 18 MONITORING RECORD JAH-MAR 1983.' FICHE: 18091:303-18091:303

ADOCK-2700039-C-830413 KAGE: 830413-83042104149 1 0/3490 ACH: 8304210419 DATE: 830418 PAGES: 1 Lit 'TREHCH 18 MOHITORING RECORD OCT-DEC 1982.'

FICHE: QS 18091:302-18091:302 PFL: ADOCK-2700039-C-830413 PACKAGE: 830413-83042104144 10050/3486 ACH: 8304210414 DATE: 830413 PAGES: 1 L1: FORWARDS ' TRENCH 18 MONITORING RECORD OCT-DEC 1982' & L2: ' TRENCH 18 MONITORING RECORD JAH-NAR 1983.' FICHE: 1G091:301-18091:303 PFL: ADOCK-2700039-C-830413 PACKAGE: 830413-8304210414* 10050/3017 ACH: 8304200605 DATE: 830328 PAGES: 4 L1s TRIP REPT OF 830316-17 VISIT TO SHEFFIELD LOW LEVEL WASTE L2: g DISPOSAL FACILITY & ILLIHOIS GEOLOGICAL SURVEY TRENCH CAP L3: STUDY FIELD TEST SITE RE SITE CONST, f 'HE: 19079:001-18079:004 L<w: ADOCK-2700039-C-830328 PACKAGE: 830328-8304200605 10050/3012 ACH: 8304200599 DATE: 830400 PAGES: 4 L1: ADVISES THAT ILLINOIS DEPT OF HUCLEAR SAFETY COHCURS W-NEED L2: FOR ADDL STUDIES PROPOSED BY TRITIUM MIGRATION STEERING L3: COMMITTEE DURING 830117 MEETING. WORK TO BE UNDERTAKEN SY US L4: U ECOLOGY SHOULD C0t'.MEHCE AS SOOH AS PRACTICABLE. FICHE: 19076:359-18076:362 PFLt ADOCK-2700039-C-830408 PACKAGE: 830408-8304200599 10050/2991 ACH: 8304200572 DATE: 830408 PAGES: 5 L1: ADVISES THAT STATE OF IL HAS NOT PROVIDED POSITION OH L2: PROGRAM TO INVESTIGATE SMALL QUANTITIES OF TRITIUM IN WELL L3: g' 602.UPON RECEIPT OF STATE OF IL CONCURRENCE U-PROGRAM L4: LICENSEE WILL PROCURE CONTRACTOR TO INSTALL WELLS. F ICI'E : 18078:230-18078:234 PFL: ADOCK-2700039-C-830409 PACKAGE: 830408-8304200572 1,F'l0/697 LJ: 8304140244

DATE: 830331 PAGES: 2 RESPONDS TO 830318 LTR DESCRIBING PROPOSED USE OF TRACERS TO STUDY UNSATURATED 20HE AT SHEFFIELD SITE.HRC & STATE OF IL 1 s MUST APPROVE PROPOSED STUDY WHICH SHOULD BE PERFORMED PER L4: 761118 AGREEMENTS.HORMAL MAINT MODS SHOULD BE REPORTED. FICHE: 17971:340-17971:341 PFL: ADOCK-2700039-C-830331 PACKAGE: 830331-8304140244 10050/59 ACH: 8304130003 DATE: 830406 PAGES: 2 L1 MOD 4 EXTENDING PERIOD OF PERFORMANCE TO 840331 6 ASSIGNING L2 HEW PROJECT OFFICER TO ' EVALUATION OF LOCATIGHS & RATES OF L3: GROUND WATER DISCHARGE FROM SHEFFIELD LOW LEVEL WASTE L4: DISPOSAL FACILITY.' FICHE: 17968:274-17968t275 PFL: CONTR--HRC-2-80-69-830406 PACKAGE: 830406-8304130002A 10050/58 ACH: 8304130002 DATE: 830406 PACES: 1 L1: NOTIFICATIGH OF CONTRACT EXECUTION MOD 4 TO ' EVALUATION OF L2 LOCATIONS & RATES OF GROLdD WATER DISCHARGE FROM SHEFFIELD L3: LOW LEVEL WASTE DISPOSAL FACILITY. CONTRACTOR:USGS. FICHE: 17968:273-17968:275 [ ): CONTR--NRC-2-80-69-830406 L_,KAGE: 830406-8304130002* 10048/7530 ACH: 8303180588 DATE: 830225 PAGES: 1 L1: RESPONDS TO 830218 LTR REQUESTING IHF0 RE JAN MEETINGS ON L2: SHEFFIELD SITE TRITIUM MIGRATION STUDY.EHCL TRIP REPT L3: $ SUMMARIZES HEETIdG OF STEERING COMMITTEE & SITE VISIT.W-0 L4: EHCL. FICHE: 17640:123-17640:124 PFL: WASTE--WM-3-830225 PACKAGE: 830225-8303180588 10048/6263 ACH: 8303160f02 DATE: 821202 PAGES: 2 Liz TRIP REPT OF 821201-02 VISIT TO SHEFFIELD LOW LEVEL WASTE L2: DISPOSAL FACILITY RE SITE CLOSURE & DECOMMISSIONING. FICHE: I 17614:321-17614:322 PFL: ADOCK-2700039-C-830224 PACKAGE: 830224-8303160099A 1004C/6260 ACH: 8303160099 DATE: 830224 F~ES: 1 L. j FORWARDS TRIP REPT OF 821201-02 TOUR OF FACILITY BY

L2: R SCARANO & J SHAFFHER. FICHE: 17614:320-17614:322

ADOCK-2700039-C-830224 KAGE: 830224-8303160099*

1 7/8145 ACH: 8302240400 DATE: 830107 PACES: 31 L1: ' BOREHOLE DILUTION TESTING STUDY SHEFFIELD LOW LEVEL L2 qg RADWASTE DISPOSAL SITE.' FICHE: 17289:251-17289:281 PFL: ADOCK-2700039-C-830128 PACKAGE: 830128-8302240397A 10047/8143 ACH: 8302240397 DATE: 830128 PAGES: 4 L1:

SUMMARY

OF STEERING COMMITTEE 830117 MEETING RE SHEFFIELD L2: TRITIUM MIGRATION STUDY & 830118 SITE VISIT U-USGS.REPT OH L3: BOREHOLE DILUTION TESTING AT SITE EHCL. FICHE: D 17289:247-17289:281 PFL: ADOCK-2700039-C-830128 PACKAGE: 830128-8302240397* 10047/6611 ACH: 8302180433 DATE: 830216 PAGES: 1 L1t ORDER GRANTING HRC & APPLICANT JOINT NOTION FOR COHTINUAHCE UNTIL 030502 TO PROVIDE TIME FOR SETTLEMENT HEGOTIATIONS. ErdHE: 17215:178-17215:170 PFL: ADOCK-2700039-C-830216 PACKAGE: 830216-8302180433 10047/697 ACH: 8302010067 DATE: 830128 PAGES: 3 L1 J0(HT MOTION FOR EXTENSION OF COHTINUAHCE OF PROCEEDING L2: UNTIL 830502 TO PROVIDE ADDL TIME FOR SETTLEMENT L3: NEGOTIATIONS. CERTIFICATE OF SVC EHCL. FICHE: 16974:136-16974:130 PFL: ADOCK-2700039-C-830128 PACKAGE: 830128-8302010067 10047/151 ACH: 8301280139 DATE: 830121 PAGES: 4 L1: FORWARDS

SUMMARY

OF 830117 TECHNICAL UPDATE MEETING RE L2: TRITIUM MIGRATION INVESTIGATION, FICHE: g 16959:123-16959:126 PFL: ADOCK-2700039-C-830121 PACKAGE: 830121-8301280139 10046/3100 ACH: 8301100385 p^]E 821220

 '_ _ES:
 ,              1

L1 ADVISES THAT SPECIFIC FIELD PROCEDURES & WELLS TO BE TESTED L2s BY BOREHOLE DILUTION AGREED UPON AT 821119 SITE MEETING. I : 6 FIELD WORK DEGAN OH 821213. DETAILS OF CHEMICAL TRACER TESTING STILL BEING DISCUSSED. HE: 16757:027-16757:027 PFL: ADOCK-2700039-C-821220 PACKAGE: 821220-8301100385 10045/954 ACH: 8212010479 DATE: 821110 PAGES: 4 L1 ' TRITIUM NIGRATION INVESTIGATION STATUS REPT,' FICHE: e 16270:211-16270:214 PFL: ADOCK-2700039-C-821111 PACKAGE: 821111-82120104764 10045/951 ACH: 8212010476 DATE: 821111 PAGES: 1 L1 FORWARDS ' TRITIUM MIGRATION INVESTIGATION STATUS REPT.' FICHE: 8 16270:210-16270:214 PFL: ADOCK-2700039-C-821111 PACKAGE: 821111-8212010476* 10044/3939 ACH: 8211110445 DATE: 820803 PAGES: 1 L1: REQUESTS HRC CONTRACT W-BMHL TO CONDUCT ENVIRON STUDIES AT 4 FACILITY, L-- M H E : 16044:301-16044:301 PFL: ADOCK-2700039-C-821019 ( PACKAGE: 821019-8211110439A / 10044/3935 ACH: 8211110439 DATE: 821019 PAGES: 1 L1 INFORMS OF STATUS OF 820808 REQUEST FOR HRC ASSISTANCE RE L2: ENVIROH RESEARCH STUDIES AT FACILITY. REQUEST STILL UNDER L3: REVIEW. FICHE: 16044:300-16044:301 PFL: ADOCK -2700 039-C-821019 PACKAGE: 821019-8211110439* 10004/2763 ACH: 8211080249 DATE: 821005 PAGES: 1 L1 ' TRENCH 18 NOHITORING RECORD FOR'JUL-0CT 1982.' FICHE: $ 15992:298-15992:298 PFL: ADOCK-2700039-C-821005 PACKAGE: 821005-8211080247A 10044/2761 ACH: 8211080247 DATE: 821005

        ..ES:

s 1 L_J FORWARDS ' TRENCH 18 MONITORING RECORD FOR JUL-0CT 1982,' 7

FICHE: 15992:297-15992:297 PFL ADOCK-2700039-C-821005 CKAGE: 821005-8211080247* 1 4/2522 1: 8211060686 DATE: 821025 PACES: 1 L1s SUBMITS RESULTS OF TRITIUM IN WATER ANALYSES OF GRASS L2: SAMPLES TAKEN FROM 820630-0826. FICHE: k) 15972:223-15972:223 PFL: ADOCK-2700039-C-821025 PACKAGE: 821025-8211060686 10044/1445 ACH: 8211030598 DATEt 821008 PAGES: 1 L1 FORWARDS COMPUTER PRINTOUT OF ENVIRON MOHITORING RESULTS OF L2: 1982 DATA FROM SITE PER REQUEST.REPT COHTAINS LATEST RESULTS L3: q FROM STATE OF IL RADIOLOGICAL LAB.W-0 EHCL. FICHE: 15943:102-15943:102 PFL: ADOCK-2700039-C-821008 PACKAGE: 821008-8211030598 10043/3755 ACH: 8210120419 DATE: 820928 PAGES: 4 L1: MOD 5 REVISING TASK REPTS DELIVERY SCHEDULE INCREASING L2: ESTIMATED COST REVISING VOUCHEP SUBMITTAL & SUBSTITUTING r UPDATED MANUAL CHAPTER 3202 TC 'SHEFFIELD TREHCH CAP STUDY.'

 'r dHE:          15691:168-15691:171 PFL:             CONTR--NRC-2-80-74-820928 PACKAGE:         820928-8210120411 A 10043/3748 ACH:             8210120411 DATE:            820928 PAGES:           1 L1               HOTIFICATIGH OF COHTRACT EXECUTION HOD 5 TO 'SHe~FFIELD L2:              TRENCH CAP STUDY.' COHTRACTOR: UNIV OF IL.

FICHE: 15691:167-15691:171 PFL: CONTR--NRC-2-80-74-820928 PACKAGE: 820928-8210120411* 10043/3666 ACH: 8210120320 DATE: 820920 PAGES: 6 L1:

SUMMARY

OF 820908 STEERING COMMITTEE MEETING W-IDHS STATE OF L2: IL USGS & US ECOLOGY TO DISCUSS RESULTS OF PHASE II PORTION L3: g OF TRITIUM MIGRATION STUDY & TO DETERMIME HEED FOR PHASE II L4: INVESTIGATIONS. EXHIBITS EHCL. FICHE: 15689:236-15689:241 PFL: ADOCK-2700039-C-820920 PACKAGE: 820920-8210120320 10043/3182 [^^ 5 : 8210080075 v E: 821006

PZGES: 1 L1: ORDER GRANTING HRC & APPLICANT JOINT MOTION TO CONTINUE I  : PROCEEDINGS UNTIL 830201. HE: 15643:267-15643:267

ADOCK-2700039-C-821006 PACKAGE: 821006-8210080075 10043/1794 ACH: 8210050095 DATE: 821001 PAGES: 3 .

Lit JO]HT MOTION TO CONTINUE PROCEEDINGS UNTIL 830201 TO L2: PROVIDE ADDL TIME FOR SETTLEMENT HEGOTIATIONS. CERTIFICATE OF L3: SVC EHCL. FICHE: 15604:236-15604:238 PFL: ADOCK-2700039-C-G21001 PACKAGE: 821001-8280050095 10042/6931 ACH: 8209220460 DATE: 820817 PAGES: 6 L1 FORWARDS RECENT SAMPLING & ANALYSIS DATA RE TRITIUM L2: M)GRATION INVESTIGATION. PHASE II 0F MONITORING WELL L3 O INSTALLATI0HS COMPLETE. FICHE: 14960:314-14960:319 PFL: ADOCK-27 00 039-C-82 0817 PACKAGE: 820817-8209220460 10042/6191 ACH: 8209200494 F ~E: 820817 L .JES : 2 L1: MOD 2 INCORPORATING ADDL WORK UNDER ARTICLE I EXTENDING L2: PERIOD OF PERFORMANCE TO 830930 & PROVIDING ADDL FUND TO L3: ' SOLUTE TRANSPORT NODEL OF TRITIUM PLUME MIGRATING EAST FROM L4: SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY,' FICHE: 14923:318-14923:319 PFL: CONTR--HRC-2-80-69-820817 PACKAGE: 820817-8209200403A 10042/6186 ACH: 8209200483 DATE: 820817 PAGES: 1 L1: HOTIFICATION OF CONTRACT EXECUTION MOD 2 TO ' SOLUTE L2: TRANSPORT MODEL OF TRITIUM PLUME MIGRATING EAST FR0bt L3: SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY ' CONTRACTOR: L4: USGS. FICHE: 14923:317-14923:319 PFL: CONTR--HRC-2-90-69-820817 PACKAGE: 820817-8209200483* 10042/2501 ACH: 8209020093 DATE: 820806 PAGES: 1 L1: INFORMS THAT HRC DOES NOT OBJECT TO AUTHORIZATION OF f UNSUPERVISED ACCESS OF USGS TO SHEFFIELD SITE FOR CONDUCTING Li STUDIES RE MOVEMENT OF WATER IN UHSATURATED ZONE & EROSIGH l

L4: OF SITE SURFACE. FICHE: 14729:040-14729:040

ADOCK-2700039-C-320806 KAGE: 820806-8209020093 1 1/7004 ACH: 8208170335 DATE: 820813 PAGES: 6 Lir STATENEHT CONCERHING PROGRESS IN ONGOING SETTLEMENT L2 HEGOTIATIDHS W-US ECOLOGY & STATE OF IL. PORTIONS OF 15 L3: PO1 HTS ADDRESSED IN HRC-US ECOLOGY SITE STABILIZATION &

L4: CLOSURE CONDITIONS MET. CERTIFICATE OF SVC EHCL. FICHE: 14367:008-14367:013 PFL: ADOCK-2700039-C-820813 PACKAGE: 820813-8208170335 10041/6906 ACH: 8208170234 CATE: 820611 PAGES: 1 Lir ' TRENCH 18 NOHITORING RECORD JAH-MAR 1982.' FICHE: 0 14369:029-14369:029 PFL: ADOCK-2700039-C-820611 PACKAGE: 820611-8208170227A 10041/6901 ACH: 8208170227 DATE: 820611 P(GES: 1 L1: FORWARDS 'TREHCH 18 MONITORING RECORD JAH-MAR 1982.' THE: 14369 028-14369:029 i- .-1 : ADOCK-2700039-C-820611 PACKAGE: 820611-8208170227* 10041/6067 ACN: 8208130242 DATE: 820707 PAGES: 8 L1: FORWARDS SllMMARY OF 820610 TECHNICAL UPDATE MEETING RE SITE L2: TRITIUM MIGRATION IHVESTIGATION. SAMPLING & ANALYSIS DATA & L3: , MAP OF LOCATIONS OF WELL TO BE DUG IN PHASE 2 EHCL. FICHE: 14333:157-14333:164 PFL: ADOCK-2700039-C-820707 PACKAGE: 820707-8208130242 10041/6007 ACH: 8208130161 DATE: 820712 PAGES: 1 L1: QUARTERLY MONITORING DATA OF PIE 20 METERS & WELLS IN VICINITY L2: OF TREHCH 18 & TRENCH 18 SUMPS FOR APR-JUNE 1982. FICHE: 14339:031-14339:031 PFL: ADOCK-2700039-C-820712 PACKAGE: 820712-8208130158A 10041/6004 ACH: 8208130158 DATE: 820712

  -'ES:           1 L;               FORWARDS QUARTERLY MONITORING DATA OF PIEZONETERS & WELLS IN

L2: VICINITY OF TRENCH 18 & TRENCH 18 SUMPS FOR APR-JUNE 1982. FICHE: 14339:030-14339:031

ADOCK-2700039-C-820712 KAGE: 820712-8208130158*

1 31/4705 ACH: 8208060107 DATE: 820802 PAGES: 8 L1: STATEMENT OF PROGRESS IN SETTLEMENT HEGOTIATIONS. CERTIFICATE L2: OF SVC EHCL. FICHEt 14238:186-14238:193 PFLt ADOCK-2700039-C-820802 PACKAGE: 820802-8208060107 10041/4599 ACH: 8208050502 DATE: 820802 PACES: 3 L1 NOTICE OF CF EASON CHANGE OF ADDRESS. CERTIFICATE OF SVC j L2: EHCL. FICHE: 14214:161-14214:163 PFL: ADOCK-2700039-C-820802 PACKAGE: 820002-8208050502 16041/3986 ACH: 8208040302 DATE: 820715 PAGES: 28 L1:

SUMMARY

OF 820610 MEETING W-IL DEPT OF HUCLEAR SAFETY IL L2: g ATTY GENERAL OFC IL STATE GEOLOGICAL SURVEY & US ECOLOGY TO i

       )         DISCUSS RESULTS OF PHASE I TRITIUM MIGRATION STUDIES &

L~s FINALI2E PLAHS FOR PHASE II STUDIES. FICHE: 14223:230-14223:307 PFL: ADOCK-2700039-C-G20715 PACKAGE: 820715-8208040302 10041/d393 ACH: 6208030258 DATE: 820802 PAGES: 2 Lir ORDER GRANTING NRC 820728 MOTION TO FILE STATUS REPT OH L2: NEGOTIATIONS 10 DAYS AFTER REPTS FILED BY OTHER PARTIES. L3: MOTION CONSISTENT U-COMMISSIGH REGULATIONS. FICHE: 14158:127-14158:128 PFL: ADOCK-2700039-C-G20802 PACKAGE: 820802-8208030258 19041/3287 ACH: 8208030127 DATE: 820607 PF.GES: 3 L1 SAMPLING & ANALYSIS DATA FOR MAR 1982. FICHE: 0 14200:286-14200:288 PFL: ADOCK-2700039-C-320607 PACKAGE: 820607-8208030125A 10041/3286 ACH: 8208030125 ('lE: 820607 L IES: 1 { l ,

L1: FORWARDS SAMPLING & ANALYSIS DATA RECEIVED FROM PHASE 1 L2 STUDY. INFO DISTRIBUTED TO COMMITTEE NEMBERS PRIOR TO 820610

MEETING.

HE: 14200:285-14200:286

ADOCK-2700039-C-820607 PACKAGE: 820607-8208030125*

10041/3282 ACH: 8208030119 DATE: 820707 PAGES: 8 L1: FORWARDS

SUMMARY

OF 820610 TECHNICAL UPDATE MEETING TO L2: g EVALUATE PHASE 1 OF TRITIUM INVESTIGATION. FICHE: 141972353-14197:360 PFL: ADOCK-2700039-C-G20707 PACKAGE: 820707-8208030119 10041/3005 ACH: 8208020224 DATE: 8?0729 PAGES: 5 L1 STATEMENT RE STATUS OF SETTLEMENT HEGOTIATIONS PER ASLB L2: 820714 ORDER. CERTIFICATE OF SVC EHCL. FICHE: 10152:028-14152:032 PFL: ADOCK-2700039-C-820729 PACKAGE: 820729-8208020224 10041/2463 ACH: 8207300095 DATE: 820728 PAGES: 4 i MOTION FOR ORDER PERMITTING HRC TO FILE STATUS REPT OH Lat SETTLEMENT HEGOTIATIOH9 to DAYS AFTER OTHER PARTIES FILE L3: REPTS. CERTIFICATE OF SVC EHCL. FICHE: 14120:320-14120:323 PFL: ADOCK-2700039-C-820728 PACKAGE: 820728-8207300095 10040/6555 ACH: 8207160274 DATE: 820714 PAGES: 2 L1: ORDER GRANTING NRC MOTION TO CONTINUE PROCEEDING UNTIL L2 821001 TO PROVIDE ADDL TIME TO PERMIT SETTLELIENT L3: HEGOTIATIONS. PARTIES REOUESTED TO FILE STATEMENTS OH L4r PROGRESS OF HEGOTIATIONS WITHIH 15 DAYS. FICHE: 13862)(87-13862:088 PFL: ADOCK-2700039-C-320714 PACKAGE: 820714-8207160274 10039/7893 ACH: 8206250067 DATE: 820511 PAGES: 1 L1: RESPONDS TO 820407 REQUEST RE BNL SITE VISIT TO TAKE L2: TREHCH SUMP WATER SAMPLES. FICHE: 13628:297-13628:297 PFL: ADOCK-2700039-C-820511 F^7KAGE: 8205tt-8206250067 1L_s9/4401

ACH: 8206140372 D.~;TE: 820601 ES: 4 TRIP REPT OF G20512 & 13 VISIT TO SHEFFIELD LOW LEVEL WASTE DISPOSAL. FACILITY TO MEET W-STATE OF IL & USGS OFFICIALS TO L3: DISCUSS IMPRESSIOHC OF PERFORMANCE OF SITE SURFACE L4:  % STABILIZATION FEATURES. FICHE: 13510:124-13510:128 PFL: ADOCK-2700039-C-820601 PT.CKAGE: 820601-8206140372 10039/4097 ACH: 8206110350 DATE: 820407 PAGES: 1 L1 RESPONDS TO HRC 820323 LTR REQUESTING ACCESS TO SITE FOR L2: OHGOING STUDY BY BHL. SITE OWNER (STATE OF IL) SHOULD BE L3: HOTIFIED. COMPLIANCE W-LISTED CONDITIONS IN PERFORflANCE OF L4: WORK REQUESTED. FICHE: 13490:225-13490:225 PFL: ADOCK-2700039-C-820407 PACKAGE: 820407-8206110350 10039/4096 ACH: 8206110348 DATE: 820511 PAGES: 4 Lia FORWARDS SAMPLING & ANALYSIS DATA FOR MAR 1982 STEERING L2 COMMITTEE REPT ON TRITIUM INVESTIGATION. FICHE: e 13490:221-13490:224 Is ADOCK-2700039-C-820511 L_5KAGE: 820511-8206110348 10039/1918 s ACH: 8206040215 DATE: 820601 PAGES: 3 L1 JOINT MOTION TO EXTEND CONTINUAHCE UNTIL 21001 TO PROVIDE L2: ADDL TIME FOR SETTLEMENT NEGOTIATIONS. CERTIFICATE OF SVC L3: EHCL. FICHE: 13359:249-13359:251 PFL: ADOCK-2700039-C-820601 PACKAGE: 820601-8206040215 10038/8086 ACH: 8205270476 DATE: 820506 PAGES: 1 L1 RESPONDS TO 820407 LTR TO J SHAFFNER.HRC AGREES TO INDEMNIFY L2 US ECOLOGY IHC AGAINST ALL CLAIMS LOSSES & EXPENSES ARISIwG L3: OUT OF ACTIVITIES OF BHL SHEFFIELD IL LOW LEVEL WASTE L4: FACILITY UNLESS CAUSED BY US ECOLOGY INC. FICHE: 13294:083-13294:083 PFL ADOCK-2700039-C-820506 PACKAGE: 820506-8205270476 10038/3770 ACH: 8205130272 [ ' E : 820405 L ES: 9

1 Ltc FORWARDS

SUMMARY

OF 820326 TECHNICAL UPDATE MEETING W-USGS L2: IN CHAMPAIGH-URBAHA IL RE TRITIUM MIGRATION INVESTIGATION AT SITE PRELIMINARY CORE DESCRIPTIONS FOR USGS BORING 9 567 & g S6G & SAMPLING & ANALYSIS DATA FOR MAR 1982. HE: 13077:352-13077:360 PFL: ADOCK-2700039-C-G20405 PACKAGEi 820405-8205130272 10037/6876 ACH: 8204270165 DATE: 820303 PAGES: 4 Lir ADVISES THAT PURPOSE OF LAB FIELD TRIP TO SITE IS TO COLLECT L2: WATER SAMPLES FROM SEVERAL DISPOSAL SITE TRENCH SUMPS OR L3: WELLS. FICHE: 12874:197-12874:200 PFL: ADOCK-2700039-C-820323 PACKAGE: 820323-8204270163A 10037/6874 ACH: 8204270163 DATE: 820323 PAGES: 1 Lir REQUESTS IMMEDIATE HOTIFICATION SY SITE PERSONNEL IF WATER L2: FOUHD IN ANY SUMPS DURING ROUTINE SUMP NOHITORlHG L3: ACTIVITIES. SAMPLING TO BE DONE UNDER ANAEROBIC CONDITIONS L4: W-SPECIAL PORTABLE EQUIPMENT. FICHE: 12874:196-12874:200 PFL: ADOCK-2700039-C-820323 PACKAGE: 820323-8204270163* 1( J7/4936 L ;J : 8204210424 DATE: 820315 PAGES: 2 L1: MOD 4 AMENDING MEETINGS t TRAVEL PROVIDING ADDL FUNDS t. L2 REPLACING AUTHORIZED REPRESENTATIVE TO 'SHEFFIELD TRENCH CAP L3: STUDY.' FICHE: 12811:129-12811:130 PFL: CONTR--HRC-2-80-74-820315 PACKAGE: 820315-8204210420A 10037/4934 ACH: 8204210420 DATE: 820315 PAGES: 1 L1: HOTIFICATION OF COHTRACT 3XECUTION MOD 4 TO 'SHEFFIELD L2: TREHCH CAP STUDY.' CONTRACTOR: UNIV OF IL. FICHE: 12811:128-12811:130 PFL: CONTR--NRC-2-80-74-820315 PACKAGE: 820315-8204210420* 10037/4330 ACH: 8204200106 DATE: 820405 PAGES: 9 L1: FORWARDS

SUMMARY

OF TECHNICAL UPDATE 820326 MEETING IN L2: CHAMPAIGH-URBAHA IL RE TRITIUM MIGRATION INVESTIGATION P"'1 k PRELINIHARY CORE DESCRIPTIONS FOR USGS BORINGS 567 & 568 & O ' SAMPLING & ANALYSIS DATA FOR MAR 1982.

FICHE: 12742:111-12742:119 PFL: ADOCK-2700039-C-320405 KAGE: 820405-8204200106 1 6/6765 I 8203310379 DATE: 820309 PAGES: 33 L1:

SUMMARY

OF 820224-25 MEETING W-FEDERAL & STATE AGENCIES IN L2: URBAHA IL RE TRITIUM MIGRATION AT SITE. FICHE: # 12469:283-12468:325 , PFL: ADOCK-2700039-C-820309 PACKAGE: 820309-8203310379 10036/5716 ACH: 8203260121 DATE: 820303 PAGES: 6 L1s FORWARDS

SUMMARY

OF FIRST TECHNICAL MEETING FOR TRITIUM L2 MITIGATION INVESTIGATION AT SHEFFIELD.NEXT MEETING L3: 6 SCHEDULED FOR 820326. FICHE: 12440:031-12440:036 PFL: ADOCK-2700039-C-820303 PACKAGE: 820303-8203260121 10036/5072 ACH: 8203240534 DATE: 820310 PAGES: 73 L1 FORWARDS DATA OBTAINED AT 820224-25 MEETING IN CHAMPAIGH IL. 1.2 : DATA INCLUDES SURVEY LOCATIONS ELEVATIONS & BORING LOGS FOR [ 1 g COMPLETED WELLS.IL STATE GEOLOGICAL SURVEY CONTRACT REPT LJ 1981-6 & SHEFFIELD SITE WELL RECORDS. FICHE: 12404:215-12404:260-PFL: ADOCK-2700039-C-820310 PACKAGE: 820310-8203240534 10036/5028 ACH: 8203240411 DATE: 820309 PACES: 31 L1:

SUMMARY

OF 820212 MEETING W-R GAYNOR US ECOLOGY RE L2: RADIOLOGICAL & PHYSICAL DATA ASSOCIATED W-17 USGS WELLS EAST L3: 9 0F SHEFFIELD. DATA TRANSMITTED ATTACHED. FICHE: 12415:043-12415:073 PFL: ADOCK-2700039-C-820309 PACKAGE: 820309-8203240397A 10036/5014 ACH: 8203240397 DATE: 82030s PAGES: 1 L1: FORWARDS DATA RE 17 TEST WELLS CONSTRUCTED BY USGS EAST OF L2: SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY. DATA SHARED L3: W-LICENSEE DUE TO SMALL CONCENTRATIONS OF TRITIUM FOUND. FICHE: $ 12415:042-12415:073 PFL: ADOCK-2700039-C-820309 PACKAGE: 820309-820324039?* I f~6/ 5 0 07 C J: 8203240390

DATE: 820309 PAPESr 7

SUMMARY

OF 820211 MEETING W-USGS STATE OF IL & ROSS HARDIES O'KEEFE BABCOCK & PARSONS RE CAUSE EXTENT & SIGNIFICANCE OF L : OFFSITE TRITIUM MIGRATICH AT SITE. MAPS EHCL. FICHE: 12415:077-12415:083 PFL: ADOCK-2700039-C-820309 PACKAGE: 820309-8203240383A 10036/5001 ACH: 8203240383

  • DATE: 820309 PACES: 1 L1 FORWARDS

SUMMARY

OF 820211 NEETING IN CHICAGO IL RE L2 MIGRATION OF TRITIUM AT GITE. FICHE: 12415:076-12415:083 PFL: ADOCK-2700039-C-820309 PACKAGE: 820309-8203240383* 10036/3775 ACH: 8203190389 DATE: 820317 PAGES: 2 L1: HOTICE OF CHANGE OF ADDRESS. CERTIFICATE OF SVC EHCL. PFL: ADOCK-2700039-C-820317 PACKAGE: 820317-8203190389 10035/5064 ACH: 8202250417 DATE: 820205 PAGES: 8 FORWARDS SITE HOTES FROM 820127 & 28 VISIT TO SHEFFIELD & L.c4 CHAMPAIGH IL. DRAFT 820202 LTR TO IL STATE GEOLOGICAL SURVEY L3: , EHCL. FICHE: 4 12051:314-12051:321 PFL: ADOCK-2700039-C-820205 PACKAGE: 820205-0202250417 10035/3588 ACH: 8202220226 DATE: 820122 PAGES: 1 L1: ADVISES OF 820127 SITE VISIT TO OBSERVE USGS FIELD L2: ACTIVITIES & DRAINAGE IMPROVEMENTS IN VICINITY OF TREHCH 11. FICHE: g, 12013:134-12013:134 PFL: ADOCK-2700039-C-820122 PACKAGE: 820122-8202220226 10035/3163 ACH: 8202190075 DATE: 820217 PAGES: 1 L1: ORDER GRANTING HRC & APPLICANT REQUEST THAT FURTHER L2: PROCEEDINGS BE CONTINUED UNTIL 820601 TO ALLOW HEGOTIATIONS L3: TO PROCEED. FICHE: 11981:330-11981:330 PFL: ADOCK-2700039-C-8^0217 PACKAGE: 820217-6202190075 1f'}5/497 k J: 8202090067

f DATE: 820205 P2CES: 3

JOINT MOTION TO EXTEND CONTINUANCE UNTIL 820601 TO PERMIT TIME FOR SETTLEMENT HEGOTIATIONS.0THER PARTIES DO NOT
OBJECT. CERTIFICATE OF SVC ENCL.

FICHE: 11867:018-11867:020 PFL: ADOCK-2700039-C-820205 PACKAGE: 820205-8202090067 10033/640 ACH: 8112100469 DATE: 811106 PAGES: 3 L1: TRIP REPT OF 811014-16 VISIT TO SPRINGFIELD & CLEN ELLYH L2 IL TO DISCUSS COLLECTION & ANALYSIS OF ENVIROH MONITORING L35 0 DATA. FICHE: 11140:359-11140:361 PFL: ADOCK-2700039-C-811106 PACKAGEt 811106-8112100469 10032/6685 ACH: 8112040063 DATE: 811106 PAGES: 3 L1 4 TRIP REPT OF 811014-16 VISIT TO SPRINGFIELD & GLEN ELLYH IL L2: RE COMPILATION & REPRODUCTION OF ENVIROH NOHITORING DATA L3 CATHERED AT FACILITY. FICHE: 11088:316-11088:318 PFL: ADOCK- 27 0 0 039-C-811106 PACKAGE: 811106-8112040063 1/' 10/7030 t J: 8111020284 DATE: 810930 PAGES: 10 L1 FORWARDS US ECOLOGY LTRS REQUESTING APPROVAL FROM IL DEPT OF L2 HUCLEAR SAFETY & HRC TO PROCEED W-EROSI0H & UNSATURATED FLOW L3: 9 STUDIES.LTRS TO US ECOLOGY GRANTING APPROVAL OF STUDY L4: REQUESTED. FICHE: 10448:064-10448:076 PFL: ADOCK-2700039-C-811020 PACKAGE: 811020-8111020280A 10030/7026 ACH: 8111020200 DATE: 811020 PAGES: 2 L1 DISCUSSES TWO FIELD PROPOSED STUDIES RE MOVEMENT OF WATER L2 THROUGH UNSATURATED ZONE & MEASURE OF RATE OF EROSION FROM L3: jg SITE SURFACE IN RESPONSE TO 810930 LTR. FICHE: 10448:062-10448:076 PFL: ADOCK-2700039-C-811020 PACKAGE: 811020-8111020280* 10030/5580 ACH: 8110280148 DATE: 011020 PAGES: 3 V; MOTION FOR CONTINUANCE OF PROCEEDING UNTIL 820220 TO L / PROVIDE ADDL TIME TO PERMIT SETTLEMENT HEGOTIATIONS. PARTIES

L3: DO HOT OPPOSE NOTION. CERTIFICATE OF SVC EHCL. FICHE: 10360:251-10360:253

ADOCK-2700039-C-811020 KAGE: 811020-8110280148 1 0/5559 CCN 8110230119 DATE: 811022 PAGES: 1 L1: ORDER GRANTING LICENSEE NOTION EXTENDING ADDL PROCEEDINGS L2: TO 820220.

FICHE: 10360:212-10360 212 PFL: ADOCK-2700039-C-811022 PACKAGE: 811022-8110280119 10029/7517 ACH: 8110080492 DATE: 810930 PAGES: 2 LI: MOD 3 EXTENDING PERIOD OF PERFORMANCE TO 831130 & AMENDING L2: REPORTING REQUIREMENT DATES TO 'SHEFFIELD TRENCH CAP STUDY.' FICHE: 10137:061-10137:062 PFL: CONTR--NRC-2-8-74-810930 PACKAGE: 810930-8130080487A 10029/7516 ACH: 8110080487 DATE: 810930 PAGES: 1 L1 HOTIFICATION OF CONTRACT EXECUTION MOD 3 TO 'SHEFFIELD L2: TRENCH CAP STUDY.' CONTRACTOR: UNIV 0F IL. [L.lHEi 10137 060-10137:062 CONTR--HRC-2-80-74-810930 PACKAGE: 810930-8110080487* 16028/7827 ACH: 8109160212 DATE: 810304 PAGES: 5 Ll TRIP REPT OF 810108 a 09 MEETINGS U-LOW LEVEL WASTE MGT L2: $ TECHNICAL ASSISTANCE CONTRACTORS FOR FACILITY. FICHE: 09787:352-09787:356 PFL: ADOCK-2700039-C-810304 PACKAGE: 810304-8109160209A 10028/7824 ACH: 8109160209 DATE: Of0304 PAGES: 1 L1 FORWARDS TRIP REPT OF 810108 6 09 MEETINGS W-LOW LEVEL WASTE L2:

  • MGT TECHNICAL ASSISTANCE CONTRACTORS FOR FACILITY.

FICHE: 09787:351-09787:356 PFL: ADOCK-2700039-C-810304 PACKAGE: 810304-8109160209* 10028/4922 ACH: 8109030291 DATE: 810825 FAGES: 3 ['1 TRIP REPT OF 810722-23 VISIT TO CHICAGO t GLEN ELLYH IL RE

    <J           PARTICIPATION IN ASLB HEARING & RE FACILITY CLOSURE COHCERHS

L3r OF STATE OF IL. FICHE: 09637:113-09637:115

ADOCK-2700039-C-810825 KAGE: 810825-8109030291 1 8/4911 ACH: 8109030278 DATE: 810619 PACES: 5 L1: FORWARDS LTR TO US LCOLOGY INC DESCRIBING USCS PROJECT FOR L2: 9 SHEFFIELD RADSITE. RESPONSE REQUESTED.

FICHE: 09616:188-09616:192 PFL: ADOCK-2700039-C-810814 PACKAGE: 810814-81090302728 10028/4908 ACH: 8109030275 DATE: 810814 PAGES: 1 L1s ' TRENCH 18 MOHITORING RECORD APR-JUNE 1981.' FICHE: # 09616:187-09616:187 PFL: ADOCK-2700039-C-810814 PACKAGE: 810814-8109030272A 10028/4905 ACH: 8109030272 DATE: 810814 PAGES: 1 L1s g FORWARDS ' TRENCH 18 MONITORING RECORD APR-JUNE 1981.' FICHE: 09616:186-09616:186 PfL: ADOCK-2700039-C-810814 [ "KAGE: 610814-8109030272* 1w- 8/373 ACH: 8108200286 DATE: 810818 PACES: 10 L1: 'HRC POLICY & PROCEDURE FOR CONVEYING HEW INFO TO L2: LICENGING BOARDS.' FICHE: 09432:046-09432:055 PFLt ADCCK-2700039-C-810818 PACKAGE: 810818-8108200281AA 10028/970 ACH: 8108200281 DATE: 810818 PAGES: 16 L1: REPLY TO LICENSEE 810729 MOTION TO COMPEL HRC PRODUCTION OF L2: WITHHELD DOCUMEHTS WHICH HRC COHTENDS ARE PRIVILEDGED.HRC L3: VOLUNTARILY PRODUCING DOCUMENTS. ASSERTS NO IMPROPRIETY L4: EXISTED BY WITHHOLDIHC DOCUtiENTS. CERTIFICATE OF Ss'C EHCL. FICHE: 09432:029-09432t063 PFLt ADOCK-2700039-C-810818 PACKAGE: 810818-8108200281* 10027/7758 ACH: 8107240013 DATE: 810722 PAGES: 1 h ORDER GRANTING NRC MOTION TO CANCEL 810724 PREHEARING Lj CONFERENCE.

FICHE: 09137:184-09137:184 PFL: ADOCK-2700039-C-810722 KAGE: 810722-8107240013 1 7/7699 1: 8108140336 DATE: 810807 PAGES: 5 Liz SUPPLEMENTAL ANSWER TO STATE OF IL FIRST SET OF L2: INTERROGATORIES PER ASLB 810416 ORDER CERTIFICATE OF SVC L3: EHCL. FICHE: 09364 261-09364:265 PFL: ADOCK-2700039-C-810807 PACKAGE: 810807-8108140336 10027/5215 ACH: 8108050204 DATE: 810729 PAGES: 31 Lir NOTION TO COMPEL NRC TO PRODUCE WITHHELD DOCUMENTS.NRC HAS L2: WAIVED ANY CLAIM TO PRIVILEGE t CANNOT ASSERT PRIVILEGE AS

 ,     L3:         TO DOCUMEHTS ALREADY EXHIBITED & EXAMINED BY US ECOLOGY.

L4r CERTIFICATE OF SVC EHCL. FICHE: 09260:198-09260:293 PFL: ADOCK-2700039-C-810729 PACKAGE: 880729-8108050204* 10027/3418 ACH: 8807300109 DATE: 810713 PAGES: 3 REQUESTS EHCL SUBPOEHA AD TESTIFICANDUM BE ISSUED TO TS

      ~

r Lma BAER, FICHE: 09195:011-09195:013 PFL: ADOCK-2700039-C-810713 PACKAGE: 810713-8107300109 10027/129 ACH: 8107200272 DATE: 810714 PAGES: 3 L1: INFORMS THAT LISTED INDIVIDUALS MAY BE CALLED AS WITNESSES L2s IN PROCEEDIHC CUPPLEMEtlTING 801103 LIST. FICHE: 09074:278-09074:280 PFL: ADOCK-2700039-C-810714 PACKAGE: 810714-8107200272 10026/4745 ACH: 8107080285 DATE: 810702 PAGES: 2 L1: FORWARDS DOCUMENTS REQUESTED UPON COMPLETION OF DISCOVERY L2: PER 810616 LTR. REQUESTS PAYMENT.u-O EHCLS. FICHE: 08973:335-08973:336 PFL: ADOCK-2700039-C-810702 PACKAGE: 810702-8107080285 10026/4157 ACH: 8107070080 [

     ,]E         810531
     ,   iES:      181 1

LI: EVALUATION OF TRENCH SUBSIDENCE AHD STABILIZATION AT L2: g SHEFFIELD LOW-LEVEL RADI0 ACTIVE WASTE DISPOSAL FACILITY.FIVE L : OVERSIZE DRAWINGS ENCL. APERTURE CARDS AVAILA8LE IN PDR. HE: 08964:001-08964:194

ADOCK-2700039-C-810531 PCCKAGE: 810531-8807070080 10026/3569 ACH: 81070204t7 DATE: 810608 PAGES: 1 LI: HOTICE OF WITHDRAWAL OF APPEARANCE IN PROCEEDING, FICHE: 08936:278-08936:278 PFL: ADOCK-2700039-C-81060R PACKAGE: 810609-8107020417 10026/3441 ACH: 8107020285 DATE: 810610 PAGES: 1 Lf: REQUESTS HRC DOCUMENTS DESIGHATED IN US ECOLOGY IHC L2: DISCOVERY REQUESTS PRESENTED IN 810501 PROCEEDING.RELATED L3: CORRESPONDENCE.

FICHE: 08926:353-08926:353 PFL: ADOCK-2700039-C-810610 PACKAGE: 880610-8807020285 10026/1689 ACN: 8106260312 DATE: 810622 PAGES: 6 rn ORDER RULING ON HRC & STATE OF IL NOTIONS TO COMPEL ANSWERS Lea TO INTERROGATORIES DIRECTED TO US ECOLOGY INC.PREHEARING L3: CONFERENCE SCHEDULED FOR 810724 IN DES PLAIhES IL.ASLB L4: WILL REVIEW DOCUMENTS WITHHELD BY APPLICANT, FICHE: 08G54:336-08354:341 PFL: ADOCK-2700039-C-810622 PACKAGE: 880622-8106260312 10026/1492 ACH: 8106260026 DATE: 810624 PAGES: i Ll: IHFORMS THAT DISCOVERY DOCUMENTS WILL BE FORWARDED WITHIH L2: HEXT FEW WKS IN RESPONSE TO 810616 LTR. FICHE: 08868:048-08868:048 PFL: ADOCK-2700039-C-810624 PACKAGE: 880624-8106260026 10026/1031 ACH: 8806230676 DATE: 880616 PAGES: 1 Lf: IHFORMS OF PENDING SITE VISIT OH 810624 TO OBSERVE FIELD L2: ACTIVITIES OF IL GEOLOGICAL SURVEY & USGS, FICHE: $ 08334:246-08834:246 PFL: ADOCK-2700039-C-810616 PACKAGE: 880616-8106230676 If'16/174 L-): 8106190307

4 DATE:' OIO615 PAGES:- 10 SUPPLEMENTAL ANSWERS TO FIRST SET OF INTERROGATORIES 14 55 56 & 82-87 PER ASLB 810416 ORDER. CERTIFICATE OF SVC EHCL,

RELATED CORRESPONDENCE.

FICHE: 08806:268-08806:277 PFL: ADOCK-2700039-C-810615 PACKAGE: 810615-8106t9030/ 10025/5063 ACHR 8806090599 DATE: 801114 PAGES: 36 Lf IE WASTE PACKAGING REPT 15000027-80-62 ON 800930,NO L2: H0HCOMPLIANCE NOTED.N4JOR AREAS INSPECTED TRANSIT TRAILERS L3: ki 440654 & 440f32. SHIPPING PAPERS & PHOTOGRAPHS ENCL. FICHE: 08738:088-087387123 PFL: ADOCK-7000820-C-810526 PACKAGE: SIO526-8806090590A ~ '10025/5055 ACH: 8106090590 DATE: 810526 PAGES: 2 Lf FORWARDS IE INSP REPT 70-0820-80-19 & WASTE PACKAGING REPT L2: 15000027-80-62 OH 801006-24 & 0930 RESPECTIVELY. FICHE: 08738:061-08738:123 PFLt ADOCK-7000820-C-810526 PACKAGE: 810526-8106090590* 10025/5027 f'J LaiE: _ 8106090558 810605 PAGES:, 16 LI: ANSWER OPPOSING STATE OF IL SECOND NOTION TO COMPEL L2: PRODUCTION OF DOCUNENTS.US ECOLOGY HAS HOT DELIBERATELY L3: WITHHELD EVIDENCE OR RESPONDED TO REQUESTS IN EVASIVE OR L4: DECE!TFUL NAHHER. CERTIFICATE OF SVC EHCL. FICHE: 08738:034-08738:049 PFL: ADOCK-2700039-C-810605 PACKAGE: 810605-8106090558 10025/2702 ACHR 8106020441 DATE: 810528 PAGES: 4 Lf: RESPONDS TO 810421 LTR RE ADEQUACY OF US ECOLOGY TRENCH L2: CAPPING PROPOSAL. REQUEST FOR INFO HECESSARY FOR FULL L3: g EVALUATION OF PROPOSAL EHCL. FICHEr 90289:349-90289t352 PFL: ADOCK-2700039-C-810528 PACKAGE: 810528-8106020441 10025/2530 ACH: 8106020277 DATE: 810522 PAGES: 24 LI: SECOND NOTION TO CONPEL US ECOLOGY TO ANSWER P' INTERROGATORIES. LICENSEE FAILED TO RENDER ALL DOCUNENTS L1l REQUIRED TO BE PRODUCED PER ASLB ORDERS. CERTIFICATE OF SVC

4

    ~

L41 EHCL.RELATED CORRESPONDENCE. FICHE: 08676:081-08676:104

ADOCK-2700039-C-810522 KAGE: 810522-8106020277 1 4/6117 ACH: 8105150109 DATE: 810513 PAGES: 3 L1: HOTICE OF APPEARANCE IN PROCEEDING. CERTIFICATE OF SVC ENCL.

FICHE: 08539:063-00539:065 PFL: ADOCK-2700039-C-810513 PACKAGE: 810513-8105150109 10024/3070 ACH: 8105050189 DATE: 810420 PAGES: 1 L1 ADVISES THAT JJ SCOVILLE WILL-ASSUME DUTIES OF PRESIDENT OF L2 US ECOLOGY INC EFFECTIVE 810420. FICHE: 08458:225-08458:225 PFL: ADOCK-2700039-C-810420 PACKAGE: 880420-8105050189 10024/2955 ACH: 8105040627 DATE: 880407 PAGES: 1 Lt RESP 0HDS TO 810311 LTR RE REQUEST BY US ECOLOGY TO HOLD L2: PROPRIETARY CERTAIN DOCUMENTS FILED W-PA,RT OF 761104 L3: APPLICATI0H. IDENTIFIES DOCUMENTS HO LONGER REGARDED AS [~') PROPRIETARY. Es4HE: 08447:189-68447:189 PFL: ADOCK-2700039-C-810407 PACKAGE: 880407-8105040627 10024/2033 ACH: 8104300510 DATE: 880421 PAGES: 2 LI: < ACK RECEIPT OF 810327 LTR. REQUESTS NEETING OF HRC & US L2t ECOLOGY TO DISCUSS NRC TECHNICAL BASIS FOR REJECTING US L3: > ECOLOGY PROPOSAL RE TREHCH CAPPING DEFICIENCY. FICHE: \ 08408:037-08408:038 PFL: ADOCK-2700039-C-810421

         .PACKACE:             880421-8104300510 10024/66 ACH:               8104230552
DATE
. ,0 4 15 PAGES: 8 Lt RESPONSE IN OPPOSITION TO HRC MOTION FOR ORDER COMPELLING l L2: DISCOVERY. PROPRIETARY INFO SUBJ OF PENDING MOTION.US L3: ECOLOGY HAS OPEHED FILES FOR INSP. CERTIFICATE OF SVC EHCL.

i FICHE: 08340:032-08340:039 PFL: ADOCK-2700039-C-810415 PACKAGE: 810415-8104230552 10023/0187 (^^l: 8804230374 ( L_JE: 880415

                -                 - _ _ _ _ _ . , - . - - . _ . _ . . . . - . . - . . - , , , . . . _ . . - . . ~ _ . - -- , - . , . _

PEGES: 8 - Lf ANSWER OPPOSING NRC SECOND MCTION FOR ORDER COMPELLING L : US ECOLOGY TO RESPOND TO CERTAIN INTERROGATORIES & REQUESTS TO PRODUCE. LICENSEE HAS MADE FILES AVAILABLE TO PARTIES.

  • RELATED CORRESPONDENCE. CERTIFICATE OF SVC EHCL.

FICHE: 08340:102-08340:109 PFL: ADOCK-2700039-C-810415 PACKACE: 810415-8104230374 10023/8047 ACli: 8104230151 DATE: 880416 PAGES: 2 Ll ORDER RULING OH STATE OF IL 810309 MOTION FOR CLARIFICATION. L2: LICENSEE DIRECTED TO AHSVER IL INTERROGATORIES 55 56 & L3: 82-87 IHTERVENOR INTERROGATORIES 2 3 & 11 NEED HOT BE L0r ANSWERED.REOUEST FOR CERTIFICATION DENIED. FICHE: 08337 089-08337:090 PFL: ADOCK-2700039-C-810416 PACKAGE: 810416-8104230151 10023/8045 ACil: 8104230144 DATE: 880416 PCGES: 2 L1 ORDER RULING OH US ECOLOGY 810310 MOTION FOR CLARIFICAiIGH. L2 INFO BEARING OH OR ACTIONS REGARDING SITE COHDITIONS MUST BE L3: PRODUCED. FINANCIAL INFO ARRANGEMENTS BETWEEN TELEDYNE & US L4r ECOLOGY HEED HOT 8E PRODUCED. F;ICHE: 08337:087-08337:088 f >: ADOCK-2700039-C-810416 i- JKAGE: 880416-8804230144 10023/6954 ACH: 8104210091 DATE: 880417 PAGES: 1 LI: DISCUSSES 810416 TELCON.HRC WILL CONDUCT FILE SEARCH AT L2 US ECOLOGY LOUISVILLE KY OFC ON 810504 & CONTINUE THROUGH L3: 810507 IF HECESSARY. FICHE: 08309:148-08309:148 PFL: ADOCK-2700039-C-810417 PACKAGE: 880417-8104210091 10023/6921 ACH: 8104210035 DATE: 810408 PAGES: 2 L1: ADVISES THAT OFC OF EXECUTIVE LEGAL DIRECTOR IS HOT PREPARED L2: FOR

SUMMARY

DISPOSITION OR HEARING PHASE OF US ECOLOGY L3: PROCEEDING. PROMPT ACTION IS REGUIRED TO IDENTIFY DISCIPLINES L4: & INVOLVE EXPERT PERSONNEL IN REVIEW & DISCOVERY. FICHE: 08308:193-08308:194 PFL: ADOCK-2700039-C-810408 PACKAGE: 880408-8104210035 , 10023/4004 ACH: 8804130063 IlE 810409 L lES: 1

Lir DISCUSSES 810408 TELCOH.NRC WILL CONDUCT FILE SEARCH OF US L2: ECCLOGY LOUISVILLE KY OFC OH 810420 CONTINUING THROUGH L : 810423 IF HECESSARY. HE: 08243:130-08243:130

ADOCK-2700039-C-810409 PACKAGE: 880409-8104130063 10023/2941 ACH: 8IO4090160 DATE: 810319 PAGES: 1 L1: REQUESTS ENGINEERING DRAWINGS PLANS & SPECS RE EARTHEN BERM L2s CONSTRUCTED BY US ECOLOGY AROUND PERIMETER OF CHEMICAL WASTE L3: $ DISPOSAL SITE.NRC EVALUATING POTENTIAL FOR INTERACTION L4: BETUEEN CHEMICAL WASTE & RADWASTE AT FACILITY.

FICHE: 08182:354-08182:354 PFL: ADOCK-2700039-C-810319 PACKAGE: 810319-8104090160 10023/2830 ACil: 8104090030 DATE: 810319 PAGES: 2 Liz MOD 2 CHANGING FINAL REPORTING REQUIREMENTS 6 CONSIDERATICH L2 & PAYMENT TO ' EVALUATION OF TRENCH SUSSIDENCE & L3r STABILIZATION AT SHEFFIELD LOW LEVEL NASTE DISPOSAL L4: FACILITY.' FICHE: 08'l82:337-08182:338 PFL: COHTR--HRC-2-80-67-810319 P 810319-8104090023A 1(CCKAGE: 13/2825 L ja 8804090023 DATE: 810319 PAGES: 1 Lt. HOTIFICATION OF CONTRACT EXECUTION MCD 2 TO 'EVALUATIOH OF L2: TRENCH SUSSIDEHCE & STABILIZATION AT SHEFFIELD LOW LEVEL L3: WASTE DISPOSAL FACILITY.' CONTRACTOR: RALPH STONE & CO INC. FICHE: 08182:336-09102:338 PFL: CONTR--NRC-2-80-67-810319 PACKAGE: 810319-8104090023* 10023/1598 ACH: 8104060681 DATE: 810324 PAGES: 2 L1: ACK RECEIPT OF 810316 RESPONSE TO US ECOLOGY DISCOVERY L2: REQUESTS. INFO FORWARDED INCONPLETE. REQUESTS ADDL INFO & L3: CLARIFICATION. FICHE: 08116:147-08116:148 PFL: ADOCK-2700039-C-810324 PACKAGEt 810324-8104060681 10023/1130 ACH: 8104030581 DATE: 810327 PAGES: 2 L1: RESPONDS TO 810210 LTR TRANSMITTING US ECOLOGY PROPOSAL FOR I ' ^1 RECOMPACTING & RECOVERING TRENCHES ABOVE BASE OF EXISTING Lj 9 CAP AT FACILITY. PROPOSAL LACKS TECHNICAL DASES RE

L4: MINIMIZATION OF TREHCH SETTLEMENT. FICHE: 08101:101-08101:106

ADOCK-2700039-C-810327 KAGE: 810327-8104030581 1 3/571 ACH: 8104020292 DATE: 810331 PACES: 12 L1: SECOND MOTION FOR ORDER C0t1PELLING US ECOLOGY TO RESPOND TO L2: CERTAIN INTERROGATORIES & REQUESTS FOR PRODUCTION OF L3: DOCUMENTS. INFO SHOULD BE PROVIDED BEFORE LICENSEE ALLOWED TO L4: INTRODUCE EVIDEHCE IN PROCEEDING. CERTIFICATE OF SVC ENCL.

FICHE: 08086:009-08086:020 PFL: ADOCK-27 0 0 039-C-810331 PACKAGE: 810331-8104020287A 10023/568 ACH: 8104020287 DATE: 810331 PAGES: 2 L1: ADVISES 810316 LIST OF TECHNICAL DOCUMENTS DOES NOT CONTAIN L2: DOCUMENTS RE US ECOLOGY INTERROGATORIES 3(B ) 16 & 17 IN L3: RESPONSE TO 810324 LTR. INFO SOUGHT IS IN WILLSTE BLDG & L4: ARRANGEMENTS CAN BE MADE TO SEARCH DOCUMENTS. FICHE: 00006:007-08086:020 PFL: ADOCK-2700039-C-810331 PACKAGE: 810331-8104020287* 10022/8118 ACH: 8104010050 f TE: 810330 L JES: 10 L1: RESPONSE OPPOSING LICENSEE 010310 MOTION FOR CLARIFICATION L2: OF PREHEARIHG CONFERENCE ORDER.ASLB RULING CORRECT & L3: SUPPORTED BY RECORD. LICENSEE FAILED TO SUPPORT CLAIM OF INFO L4: BE(HG PROPRIETARY OR CONFIDENTIAL. CERTIFICATE OF SVC ENCL. FICHE: 08072:126-08072:135 PFL: ADOCK-2700039-C-810330 PACKAGE: 810330-8104010050 10022/7191 ACH: 8103270599 DATE: 810325 PAGES: 6 L1 RESPONSE IN OPPOSITIGH 10 STATE OF IL 810309 MOTION TO L2: CLARIFY 810225 PREHEARING CONFEREHCE ORDER. ORDER CLEARLY L3: DISMISSED INTERROGATORIES 55 56 & 82 AS IRRELEVANT & CALLING L41 FOR SPECULATIOH. CERTIFICATE OF SVC EHCL. FICHE: 08034:061-08034:066 PFl. : ADOCK-2700039-C-810325 PACKAGE: 810325-8103270599 10022/7136 ACH: 8103270507 DATE: 810313 PAGES: 1 Ll REVISED PAGE 5 TO MOTICil FOR CLARIFICATION. f'0HE: 08034:133-08034t133 l (_, ADOCK-2700039-C-810313 l

1 l PZCKAGE: 810313-8103270502A 10022/7131 A N 8103270502 E 810313 ES: 1 Lt: FORWARDS REVISED PAGE 5 TO US ECOLOGY 810310 MOTION FOR L2: CLARIFICATIDFi.LINE INADVERTENTLY OMITTED FROM ORIGIHAL L3: SUBMISSIDH. FICHE: 08034:132-08034:133 PFL: ADOCK-2700039-C-010313 FACKAGE: 810313-8103270502* 10022/6703 ACH: 8103260743 DATE: 810316 PAGES: 21 L1: ANSWERS TO STATE OF IL FIRST SET OF INTERROGATORIES RE L2 NUCLEAR ENGINEERING CO & TELEDYNE INC RELATIONSHIP DECISION L3: TO A8ANDON FACILITY DECOMMISSIONING COSTS & NAINT OF L4: FACILITY. CERTIFICATE OF SVC EHCL RELATED CORRESPONDENCE. FICHE: 08036:002-08036:022 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-8103260743 10022/6699 ACH: 8103260739 DATE: 810316 PAGES: 10 L1: ANSWERS TO HRC FIRST SET OF INTERROGATORIES & REQUEST FOR L2 PRODUCTION OF DOCUMENTS. CERTIFICATE OF SVC EHCL.RELATED i , CORRESPONDENCE. L-.JHE: 08035:354-08036:001 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-8803260739 10022/6531 ACH: 8103260512 DATE: 810311 PAGES: 2 Ll ADVISES THAT OHLY PROCEDURE G-004 & SECTION 4.0 0F GEOLOGY & L2: GEOTECHNICAL ENGINEERING REPT ON TREHCHES 14 & 14A BE L3: CONSIDERED PROPRIETARY PER 761229 30 & 770907 LTRS. REQUESTS L4: JUSTIFICATION FOR OTHER MATL EEIHG PROPRIETARY. FICHE: 08037:204-08037:221 PFL: ADOCK-2700039-C-810311 PACKAGE: 8103:1-8103260512* 10022/4962 ACH: 8103230724 DATE: BIO 316 PAGES: 24 L1: SECOND RESPONSE TO US ECOLOGY REQUEST FOR ADMISSIONS L2: INTERROGATORIEG t PRODUCTION OF DOCUf1ENTS PER ASLB 810226 L3: ORDER. DOCUMENTS AVAILABLE UP0H REQUEST. AFFIDAVIT & L4: CERTIFICATE OF SVC ENCL, FICHE: 07974:126-07974:149 PFL: ADOCK-2700039-C-810316 ['^^1K A GE : 810316-8103230724 li 22/4916

ACH: 8103230671 DATE: 810316 P ES: 14 STATE OF IL SECOND RESPONSE TO INTERROGATORIES FR0bt CHICAGO

SECTION ANS PER ASLB 810226 ORDER. INVOLVES IDENTIFICATION OF L3: DOCUMENTS RELIED UPON FOR PREPARATION OF POSITION OH LICENSE L4: TERMINATION. AFFIDAVIT EHCL.RELATED CORRESPONDEHCE.

FICHE: 07973:338-07973:351 PFL: ADOCK-2700039-C-810316 PACKAGE: 010316-8103230671 10022/4313 ACH: 8103200714 DATE: 810309 PAGES: 8 Lt: MOTION TO CLARIFY & RECONSIDER IN PART ASLB 810225 L2: PREHEARING CONFERENCE ORDER & ORDER RULING ON DISCOVERY L3: REQUESTS OBJECTIONS & MOTIONS. ALTERNATELY REQUESTS L4: QUESTIONS 8E REFERRED TO COMMISSION.W-CERTIFICATE OF SVC. FICHE: 07970:007-07970:014 PFL: ADOCK-2700039-C-810309 PACKAGE: 810309-8103200714 10022/4299 ACH: 8103200707 DATE: 810310 PAGES: 12 Ll MOTION FOR CLARIFICATION OF PREHEARING CONFERENCE ORDER & L2 RULING OH DISCOVERY REQUESTS OBJECTIONS & If0TIONS. ORDER L3: SHOULD HOT BE CONSTRUED TO REQUIRE US ECOLOGY TO PRODUCE I 't PROPRIETARY OR PRIVILEGED DOCUMENTS.W-CERTIFICATE OF SVC. L_jHE: 90l93:296-90193:307 PFL: ADOCK-2700039-C-810310 PACKAGE: 810310-8103200707 10022/2313 ACH: 8103170532 DATE: 801112 PAGES: 6 LI: IE INSP REPT 27-0039-80-02 OH 801022,HO HONCOMPLIANCE NOTED. L2: MAJOR HREAS INSPECTED: DRAINAGE & EROSION AT SITE.J SHAFFHER L3: Qt AFFIDAVIT & CERTIFICATE OF SVC ENCL. FICHE: 90f89:080-90189:091 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-8103170513C 10022/2305 ACH: 8803170524 DATE: 801128 PAGES: 1 LI: FORWARDS 301128 TRIP REPT OH 801014-15 SITE VISIT RE L2: ' OBSERVATION & COMMENTS OH SURFACE CONDITIONS IN SPECIFIED L3: AREAS OF SITE, FICHE: 90189:079-90189 079 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-88031705138 10022/2300 i'~ ' ) : 8103170519 LE 801114

PAGES: 1 LI: DISCUSSES 801112 TELCON. SURVEY & MAP MADE FROM TWO 9 BENCHPARKS WHICH ARE FILE MARKS OH INSIDE OF WELL CASINGS. HE: 90189:078-90189:078

ADOCK-2700039-C-810316 PACKAGE: 810316-81031705134 10022/2295 ACH: 8103170513 DATE: 810316 PAGES: 19 Lt RESPONSE TO US ECOLOGY 801010 & 24 REQUESTS FOR ADMISSIONS L2: INTERROGATORIES & REQUESTS FOR PRODUCTION OF DOCUMENTS.

L3: REQUESTS FOR ADMISSIGHS DEHIED. FICHE: 07930:249-07930:267 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-8103170513* 10022/2166 ACH: 8103170340 DATE: 810316 PAGES: 2 L1: FORWARDS LIST OF TECHNICAL DOCUMENTS IN NRC FILES IN WILLSTE L2: BLDG IN SILVER SPRING MD PER 810309 TELCON. SITE FILES WILL L3: BE SEARCHED OH 810324 & 25. LOUISVILLE KY OFC FILE SEARCH TO L4: BE CONDUCTED OH 810414 & 15.W-0 EHCL. FICHE: 07924:033-07924:034 PFL: ADOCK-2700039-C-810316 PACKAGE: 810316-8103170340 10021/6329

'   9:       8103050049 L.JE:        810225 PAGES:       2                                                              (

Lt DISCUSSES 810216 TELCON W-EJ REIS RE ARRANGEMENTS TO E' XAMINE L2: HRC DOCUMENTS & TO SCHEDULE MEETING TO DISCUSS CLOSURE L3: CONDITIONS IN ACCORDANCE W-PREHEARING CONFERENCE. FICHE: 07828:168-07828:170 PFL: ADOCK-2700039-C-810225 PACKAGE: 810225-8103050849 10021/4585 ACH: 8103030385 DATE: 810210 PAGES: 2 L1 FORWARDS US ECOLOGY PROPOSALS FOR RECOMPACT1HG & RECOVERING L2: TRENCHES APOVE BASE OF EXISTING CAPS. 8 FICHE: 07790:024-07790:025 PFL: ADOCK-2700039-C-810210 PACKAGE: 810210-8103030385 10021/4200 . ACH: 8103020587 { DATE: 810212 PAGES: 9 Lt COUNTY OF BUREAU AHSWERS TO HUCLEAR ENGIHEERING CO L2: INTERROGATORIES.H0TICE OF WITHDRAWAL OF APPEARANCE IN L3: PROCEEDING HOTICE OF APPEARANCE IN PROCEEDING & CERTIFICATE ['l 0F SVC EHCL.RELATED CORRESPONDENCE. k_jHE : 07782:065-07782:073

PFL: ADOCK-2700039-G-810212 PZCKAGE: 810212-8103020587 ft 1/3785

8102280598 E: 810113 PC.GES: 1 Lir MOD 2 OBLIGATING IHCRENENTAL FUNDING TO 'SHEFFIELD TREHCH L2: CAP STUDY.'

FICHE: 07775:079-07775:079 PFL: CONTR--HRC-2-80-74-810113 PACKAGE: 810113-8102280596A 10021/3784 ACH: 8802280596 DATE: Of0113 PAGES: 1 LI: HOTIFICATIDH OF CONTRACT EXECUTION MOD 2 TO 'SHEFFIELD L2: TRENCH CAP STUDY,' CONTRACTOR: BOARD OF TRUSTEES UNIV 0F L3: IL. FICHE: 07775:078-07775:079 PFL: CONTR--hRC-2-80-74-810113 PACKAGE: 810113-8102280596* 10021/3400 ACil: 8102270770 DATE: 880225 PAGES: 1 Lf CONFIRMS 810225 TELCON THAT HRC EXAM OF HUCLEAR ENGINEERING L2: CO IHC RECORDS WOULD COMMEHCE OH 810324 INSTEAD OF 810319. FICHE: 07768:200-07768:280 t s ADOCK-2700039-C-810225 L JKAGE: 810225-8102270770 10021/3359 ACH: 8102270710 DATE: 810225 PAGES: 2 Lf ORDER CHANGING HANE OF HUCLEAR ENGINEERIHG CO IHC TO L2 US ECOLOGY INC AT COUNSEL REQUEST.INTERVENOR SCHIELER ET AL L3: MOTION TO WITHDRAW FROM PROCEEDING BUT REMAIN OH SVC LIST L4r GRANTED.ASLB CAHil0T GRANT REQUEST RE FUTURE PARTICIPATIOH. FICHE: 07768:218-07768:219 PFL: ADOCK-2700039-C-810225 PACKAGE: 810225-8102270710 10021/3270 ACH: 8102270594 DATE: 810225 PAGES: 5 L1: ORDER SUSTAINING US ECOLOGY IHC OBJECTIOH TO HRC REQUEST 7. L2: REQUESTS 1 28& 10 TO BE IDENTIFIED BY US ECOLOGY IF L3: PREVIOUSLY FILED GR MADE AVAILABLE FOR IHSP.HRC 08dECTIONS L4r TO US ECOLOGY REQUESTS 1-10 11C 12A & 13-15 SUSTAINED. FICHE: 07773:002-07773:006 PFLt ADOCK-2700039-C-810225 PACKAGE: 810225-8102270594 10021/2538 (~): 8102260174 E Et 810212 V

P.ls'ES : 8 L1: REQUEST 8Y INTERVEHORS SCHIELER ET AL & ASSOCIATED CITIZENS

FOR THE PROTECTIOH OF ENVIROH TO WITHDRAW AS PARTIES BUT RETAIN CERTAIN RIGHTS. ORIGINAL ISSUES HAVE BEEN RESOLVED.
W-CERTIFICATE OF SVC.

FICHE: 07766:295-07766:302 PFL: ADOCK-2700039-C-810212 P2CKAGE: 810212-8102260174 10021/2206 i ACH: 8102250419 DATE: 810220 PACES: 1 L1 INFORMS THAT HECESSARY PERSONNEL ARE NOT AVA1LABLE TO L2: CONDUCT 810319 DISCOVERY AS PREVIOUSLY INDICATED. APPLICANT L3: ADVISED THAT EXAMINATIGH OF APPLICANT DOCUMENTS COULD BEGIN L4: OH 810324 AT SHEFFIELD KY & CONTIHUE IN LOUISVILLE KY. FICHE: 07754:320-07754:320 PFL: ADOCK-2700039-C-810220 PACKAGE: 810220-8102250419 10020/7985 ACH: 8102180442 DATE: 810213 PAGES: 244 L1: TRANSCRIPT OF 810213 HEARING IN DES PLAIHES IL RE SHEFFIELC L2: IL LOW LEVEL WASTE BURIAL SITE.PP 173-415. FICHE: 07714:001-07714:24S PFL: ADOCK-2700039-C-810213 PACKAGE: 810213-8102180442 ff 70/7560 J 8102170437 DATE: 810210 PAGES: 2 L1: e FORWARDS US ECOLOGY PROPOSALS FOR RECOMPACTING & RECOVERING L2: TREHCHES ABOVE BASE OF EXISTIHG CAPS. FICHE: 07686:050-07686:051 PFL: ADOCK-2700039-C-810210 PACKAGE: 810210-8102170437 j 10020/7425 ACH: 8102170289 DATE: 810210 PAGES: 3 L1: HOTICE OF APPEARANCE IN PROCEEDIHG. CERTIFICATE OF SVC EHCL. FICHE: 07677:132-07677:134 PFL: ADOCK-2700039-C-810210 PACKAGE: 810210-8102170289 10020/6526 ACHt 8102100740 DATE: 810106 PAGES: 1 L1: MOD 1 CHAHGING HRC PRO. JECT OFFICER FROM G TURI TO D SIEFKEN L2: TO ' EVALUATION OF LOCATIGH & RATES OF GROUNDWATER DISCHARGE L3: FROM SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY. FICHE: 07658:228-07658:228 F', CONTR--NRC-2-00-69-810106 L iKAGE: 810106-8102100729A

10020/6515 ACH: 8102100729 l TE: 810106 ES: I t HOTIFICATION OF CONTRACT EXECUTION MOD 1 TO ' EVALUATION OF L2: LOCATION & RATES OF GROUNDWATER DISCHARGE FROM SHEFFIELD LOW L3: LEVEL WASTE DISPOSAL FACILITY.' CONTRACTOR:US DOI. FICHE: 07658:227-07658:228 PFL: CONTR--NRC-2-80-69-810106 PACKAGE: 810106-8802300729* 10020/6483 ACH: 8102100700 DATE: 010106 PAGES: 1 L1: MOD 1 CHANGING HRC PROJECT OFFICER FROM G TURI TO D SEIFKEH L2: TO ' EVALUATION OF TRENCH SUSSIDEHCE & STABILIZATION AT L3: SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY.' FICHE: 07662:240-07662:240 PFL: CONTR--NRC-2-80-67-810106 PACKAGE: 810106-8102100692A 10020/6481 ACH: 8102100692 DATE: 810106 PAGES: 1 L1: NOTIFICATION OF CONTRACT EXECUTION NOD 1 TO ' EVALUATION OF L2: TRENCH SUSSIDENCE & STABILIZATION AT SHEFFIELD LOW LEVEL L3: WASTE DISPOSAL FACILITY.' CONTRACTOR: RALPH STONE & CO INC. FICHE: 07662:239-07662:240 f T: CONTR--HRC-2-80-67-810106 L.;KAGE: 810106-8102100692* 10020/6352 ACH: 8102100549 DATE: 810209 PAGES: 3 L1: HOTICE OF APPEARANCE IN PROCEEDING. CERTIFICATE OF SVC ENCL. FICHE: 07662:143-07662:145 PFL: ADOCK-2700039-C-810209 PACKAGE: 810209-8102100549 10020/5102 ACH: 8102060135 DATE: 810202 PAGES: 1 L1: ADVISES THAT HUCLEAR ENGINEERING CO CHANGED HAME TO L2: US ECOLOGY INC. FICHE: 07639:022-07639:022 PFL: ADOCK-2700039-C-810202 PACKAGE: 810202-8102060135 10020/3350 ACH: 8102020168 DATE: 810122 PAGES: 3 l Ll: ORDER SCHEDULING 810213 PREHEARING CONFERENCE IN DES L2: PLAINEG IL RE DISCOVERY REQUESTS FILED MOTI0h5 & OTHER .) '^3

   ; ,HE:

MATTERS. CERTIFICATE OF SVC EHCL, 07597:295-07597:297

PFL: ADOCK-2700039-C-810122 PECKAGE: 810122-810202016G 1 20/2800

8101300116 E: 810112 PAGES: 3 Ll: g FORWARDS TRIP REPT RE 801124-25 NEETINGS W-IL COVT 4GENCIES L2: & USGS RE STATUS OF LOW LEVEL WASTE DISPOSAL AT SHEFFIELD L3: FACILITY.

FICHE: 07579 341-07579 343 PFL: ADOCK-27 0 0 039-C-G 101 12 PACKAGE: 880112-8101300116 10020/201t ACH: 8101280075 DATE: 810102 PAGES: 1 L1: MOD 6 REVCKING CHANGE ORDER TO CONTRACT MOD 5 TO 'EIS ON L2: SHEFFIELD LOW LEVEL WASTE DISPOSAL SITE.' FICHE: 07555:116-07555:116 PFL: COHTR--HRC-2-78-35-810102 PACKAGE: 810102-8101280060A 10020/2000 ACH: 8101280060 DATE: 810102 PAGES: 1 L1: NOTIFICATION OF COHTRACT EXECUTIGH NOD 6 TO 'EIS ON L2:

              ' SHEFFIELD LOW LEVEL WASTE DISPOSAL SITE.' CONTRACTOR:HUS L3:            CORP.

i~'HE: 07555:115-07555:116 L la C0HTR--HRC-2-78-35-810102 PACKAGE: 810102-8101280060* 10020/1991 ACH: 8101280041 DATE: 810122 PAGES: 4 L1: H0TICE OF ASLB RECONSTITUTIOH.AC GOODHOPE CHAIRMAH JR KLIHE L2: & FJ REMICK HEMBERS. CERTIFICATE OF SVC ENCL. FICHE: 07555:092-07555:094 PFL: ADOC K-27 0 0 039-C-810122 PACKAGE: 810122-8101200041 10019/6479 ACH: 8101160120 DATE: 811229 PAGES: 1 L1: ADVISES THAT HUCLEAR ENGIHEERING CO IHC IS CHAHGING HAME TO L2: US ECOLOGY IHC. FICHE: 07469:337-07469:337 PFL: ADOCK-2700039-C-801229 PACKAGE: 801229-8101160120 10019/6418 ACH: 8101150925 DATE: 801209 PAGES: 6

 l            HUCLEAR REACTOR REGULATIGH OFC LETTER 19 REVISIGH 1 LJ             FORWARDING REVISED PROCEDURES FOR HOTIFYING LICEHSING BOARDS

L3: OF RELEVANT HEW INFO. FICHE: 94498:352-94498:357

ADOCK-2700039-C-801209 KAGE: 801209-8101150925 1 9/952 ACH: 8012300256 DATE: 801222 PACES: 20 L1: RESPONSE TO AMS 801202 MOTION FOR ORDER COMPELLING HRC TO L2: ANSWER INTERROGATORIES.AHSWERS INTERROGATORIES 4 7 10 & 15.

L3: AHS MOTIGH UNTIMELY. SUPPORTIVE DOCUMENTATION AFFIDAVITS & L4: CERTIFICATE OF SVC EHCL. FICHE: 07358:131-07358:150 PFL: ADOCK-2700039-C-801222 PACKAGE: 801222-8012300256 10019/838 ACH: 8012300046 DATE: 801205 PACES: 14 L1: RESPONSE IN OPPOSITIGH TO HUCLEAR ENGINEERING CO IHC (NECO ) L2: 801115 MOTION TO COMPEL HRC TO ANSWER HECO REGUESTS FOR L3: ADMISSIGHS & INTERROGATORIES & TO COMPEL PRODUCTION OF L4: DOCUMENTS. CERTIFICATE OF SVC EHCL. FICHE: 07356:133-07356:146 PFL: ADOCK-2700039-C-801205 PACKAGE: 801205-8012300046 10018/7906 ACH: 8012230006

 / IE:          801202
 !.  '.ES :     8 L1             REQUEST FOR ORDER COMPELLING HRC TO ANSWER AHS CHICAGO L2:            SECTION INTERROGATORIES 4 7 9 10 & 15. CERTIFICATE OF SVC L3:            EHCL.

FICHE: 07311:155-07311:162 PFL: ADOCK-2700039-C-801202 PACKAGE: 801202-8012230006 10018/7642 ACH: 8012220300 DATE: 801202 PAGES: 6 L1 REQUEST FOR ORDER COMPELLING STATE OF IL TO ANSWER L2: INTERROGATORIES 1 679& 10 FULLY & COMPLETELY. RESPONSES L3: DTD 801031 UNCLEAR & UHRESPONSIVE. CERTIFICATE OF SVC ENCL. FICHE: 07307t301-07307:306 PFL: ADOCK-2700034-C-801202 PACKAGE: 801202-8012220300 10018/6915 ACH: 8012180393 DATE: 801t20 PAGES: 6 L1: TRIP REPT OF 801014-15 VISIT TO LOW LEVEL WASTE DISPOSAL L2: FACILITY RE GEHERAL OBSERVATION OF SURFACE CONDITIONS & L3: LEVEL OF COMPLIANCE TO HRC PEQULST FOR IMPROVEMENTS.ONE f' - kS GVERSIZED DRAWING ENCL.

 ; JHE :        07272:328-07272:334

PFL: ADOCK-27 0 0 039-C-0 01128 PACKAGE: 801128-8012180393 1 O/5607

8012120542 E: 801201 PAGES: 29 L1: ANSWER TO NRC & STATE OF IL MOTIONS FOR ORDER COMPELLING L2 RESPONSE TO CERTAIN INTERROGATORIES & REQUESTS FOR L3: DOCUMENTS.URCES DENIAL OF MOTIONS & REFOCUSING OH DESIGNATED L4: ISSUES.W-CERTIFICATE OF SVC.RELATED CORRESPONDENCE.

FICHE: 07237:071-07237:099 PFL: ADOCK-2700039-C-801201 PACKAGE: 801201-8012120542 10018/2948 ACH: 8012040159 DATE: 801107 PAGES: 1 L1s NOTIFICATIGH OF CONTRACT EXECUTIGH MOD 5 TO 'EIS OH L2: SHEFFIELD LOW LEVEL WASTE DISPOSAL SITE.' COHTRACTOR:HUS L3: CORP, PFL: C0HTR--NRC-2-78-35-801107 PACKAGE: 80tt07-8012040159 10018/2823 ACH: 8012030903 DATE: 801112 PACES: 4 L1: MOD 5 DELETING & ADDING TASKS TO 'EIS OH SHEFFIELD LOW LEVEL L2: WASTE DISPOSAL SITE MAR 1979.' i ): COHTR--NRC-2-78-35-801112 L .;KAGE: 801112-8012030903 10018/1977 ACH: 8012030001 DATE: 801015 PACES: 34 L1: RESPONDS TO FOIA REQUEST FOR DOCUMENTS RE SITES USED FOR L2 DUMPING RADWASTE IH DACIFIC OCEAH. FORWARDS DOCUMENTS LISTED L3: IN APPS A B C & D.IhF0 PARTIALLY WITHHELD:HOME ADDRESSES & L4: TELEPHONE HUMBERS (REF FOI A EXEMPTION 6 ). PFL: F0 ( A--SP A IH8 0-456-8 01015 PACKAGE: 801015-801203000t* 10018/1498 ACH: 8012020110 DATE 801103 PAGES: 2 Ltd - RESPONDS TO HRC 800222 LTR RE VIOLATIONS HOTED IN WASTE L2 \ PACKAGING INSP REPT 15000039-79-08E. CORRECTIVE ACTIONS: L3: ' SHIPPING CASKS IN USE & ALL CASKS LEAVING STATION LABELED L4: \ ' RADIOACTIVE LSA.' FICHE:DN 07147:269-07147:270 PFL: ADOCK-5000254-0-801114 PACKAGE: 801114-80120200994 10018/1491 ACH: 8012020099 [ RE: 801114 L ..ES: 1

  .L1 :          ACK RECEIPT OF 801103 0509 & 0318 LTRS INFORMING HRC OF L2:           STEPS TAKEN TO CORRECT VIOLATIONS NOTED IN WASTE PACKAGING l :           INSP REPT 1500A039-79-00E.

4 ADOCK-5000254-0-801114 KAGE: 801114-8012020099* 10018/574 ACH: 8011250694 DATE: 801114 PACES: 39 Liz MOTION TO COMPEL ANSWERS TO CERTAIN OF INTERVENOR FIRST SET L2: OF INTERROGATORIES TO NUCLEAR EHGINEERING CO. LEGAL L3: RELATIONSHIP BETWEEN PARENT & SUBSIDIARY CORPORATIONS IS L4: RELEVANT. CERTIFICATE OF SVC EHCL. FICHE: 07068:210-07068:248 PFL: ADOCK-2700039-C-001114 PACKAGE: 801114-8011250694 10010/535 ACH: 8011250633 DATE: 801118 { PAGES: 13 L1: RESPONSE TO HUCLEAR ENGINEERING CO REQUEST FOR ADMISSIGHS L2: INTERROGATORIES & REGUEST FOR PRODUCTION OF DOCUMENTS. L3: 1HCLUDES LIST OF WITNESSES TO BE CALLED & AREAS OF L4: TESTIMONY.W-AFFIDAVIT & CERTIFICATE OF SVC. FICHE: 07068:187-07068:199 PFL: ADOCK-2700039-C-801118 PACKAGE: 801118-8011250633 10018/141 I 1: 8011250045 L.J E : 801114 PAGES: 4 L1 REQUEST FOR ORDER TO COMPEL APPLICANT HUCLEAR ENGIHEERING L2: CO TO ANSWER 801010 REQUEST FOR DESIGHATION OF WITHESSES TO L3: BE USED AT HEARING. CERTIFICATE OF SVC EHCL. FICHE: 07056:208-07056:211 PFL: ADOCK-2700039-C-801114 PACKAGE: 001114-8011250045 10018/136 ACH: 8011250038 DATE: 801118 PAGES: 4 L1: WITHDRAWAL OF 801010 NOTICE OF DEPOSITI0H & REQUEGT FOR L2: PRODUCTION OF DOCUMENTS UHTIL AFTER COMPLETION OF WRITTEH OR L3: DOCUMENTARY DISCOVERY. CERTIFICATE OF SVC EHCL. FICHE: 07056:201-07056:204 PFL: ADOCK-2700039-C-801118 PACKAGE: 801118-8011250038 10017/7988 ACH: 8011240159 DATE: 801117 PAGES: 18 L1: MOTIGH TO COMPEL HUCLEAR EHCINEERING CO TO PRODUCE DOCUMENTS L2: PURSUANT TO 801010 REQUEST. CERTIFICATE OF SVC EHCL. C'1HE: 070412131-07041:148

  '. _ l         ADOCK-2700039-C-801117

PACKAGE: 801117-8011240159 10017/6721 A is 8011190171 E: 801114 ES: 17 L1 MOTION FOR ORDER COMPELLING HUCLEAR ENGINEERING CO TO L2: RESPOND TO CERTAIH OF HRC 801010 FIRST SET OF L3: IHTERROGATORIES & REQUEST FOR PRODUCTION OF DOCUMENTS. INFO L4: MAY REVEAL BACKGROUND FACTS. CERTIFICATE OF SVC ENCL. FICHE: 06998:208-06998:224 PFL: ADOCK-27 0 0 039-C-8 01114 PACKAGE: 801114-8011190171 10017/6712 ACH: 8011190159 DATE: 801115 PAGES: 24 Liz MOTIDH TO COMPEL NRC RESPONSE TO REQUESTS FOR ADMISSIONS & L2: INTERROGATORIES & REQUEST FOR PRODUCTION OF DOCUNENTS.HRC L3 801023 OBJECTIONS & 801103 AHSWERS DEPRIVE UTIL OF L4: OPPORTUNITY TO PRESENT THEORY OF CASE.W-CERTIFICATE OF SVC. FICHE: 06998:318-06998:340 PFL: AD OCK-27 0 0 039-C-8 01115 PACKAGE: 801115-8011190135B 10017/6701 ACH: 8011190145 DATE: 801115 PAGES: 7 L1: MOTION TO COMPEL STATE OF IL RESPONSE TO REQUESTS FOR ADMISSIGHS & INTERROGATORIES & REQUEST FOR PRODUCTION OF L.  ; DOCUNCitT9.7L HEITHER FILED OBJECTION HOR ANSWERS PER ASLD L4: 800909 PREHEARING CONFERENCE ORDER. FICHE 06998:311-06998:317 PFL: ADOCK-2700039-C-801115 PACKAGE: 801115-8011190135A 10017/6693 ACH: 8011190135 DATE: 801tl5 PAGES: 3 L1: NOTION TO COMP 5L INTERVEHORS SCHIELER ET AL & COUNTY OF L2: BUREAU RESPONSES TO INTERROGATORIES.IHTERVENORS FAILED TO L3: COMP 8.Y W-ASLB 800909 PREHEARING C0NFERENCE ORDER REQUIRING L4: OBJECTIONS BY 801020 OR RESPONSE BY 801101. FICHE: 06998:308-06998:340 PFL: ADOCK-2700039-C-801115 PACKAGE: 801115-8011190135* 10017/6103 ACH: 8011180152 DATE: 801112 PAGES: 4 L1: .

SUMMARY

OF 000925 NEE HG W-HECO IN WASHIHGTOH DC RE HRC L2: SITE CLOSURE COHDITI 15 FOR DISPOSAL FACILITY.SEVERAL L3: CLARIFICATIONS MAtj BUT HO FORMAL AGREEMENTS OR COMMITMENTS. PFL: ADOCK-2700039-C7 801112

' ^9KAGE : 801112-801118Af52 1 U 7/4398             [

ACH: 8011120065 DATE: 801029 ES: 1 gg CHARACTERIZATIDH OF EXISTING SURFACE CONDITIONS AT SHEFFIELD

LOW LEVEL WASTE DISPOSAL FACILITY.

FICHE: 06953:326-06953:326 PFL: ADOCK-2700039-C-86'029 PACKAGE: 8 01029-8 01112 0061a 10017/4395 , ACH: 8011120061 DATE: 801029 PAGES: 1 LI: FORWARDS OMITTED PAGE 31 0F HUREG-CR-1683 ' CHARACTERIZATION L2: jg 0F EXISTING SURFACE CONDITIONS AT SHEFFIELD LOW LEVEL WASTE L3: FACILITY.* FICHE: 06953:325-06953:326 PFL: ADOCK-2700039-C-801029 PACKAGE: 801029-8011120061* 10017/4282 ACH: 8011110593 DATE: 801107 PAGES: 12 L1: RESPONSE IN OPPOSITION TO HUCLEAR ENGINEERING MOTION TO L2: STRIKE STATE OF IL 801020 OBJECTION TO DISCOVERY, REQUESTS L3: EXTENSION UNTIL 801118 TO RESPOND TO REQUESTS.W-AFFIDAVIT L4 K ANSPACH 801031 LTR DRAFT STIPULATION & CERTIFICATE OF SVC. FICHE: 06946:255-06946:266 PFL: ADOCK-2700039-C-801107

     ~KAGE:    801107-8011110593 1L j7/4078 ACH:         8011110115 DATE:        801023 PAGES:       5 L1:          ADVISES THAT VISIT TO DISPOSAL SITE IS SCHEDULED FOR L2:          801020-29 TO REVIEW MAINT OF RECORDS & DISCUSS OPERATING L3:          EXPERIENCE.

FICHE: 06943:319-06943:323 PFL: ADOCK-2700039-C-801023 PACKAGE: 801023-8011110115 10017/3810 ACH: 8011100233 DATE: 801103 PAGES: 3 L1: STIPULATION SETTING 801118 AS DATE FOR STATE OF IL TO L2: RESPOND TO INTERROGATORIES & REQUESTS FOR DOCUMENTS & L3: ADMISSIGHS.IL WILL CONTINUE SCHEDULED DEPOSITIONS.TB CONHER L4: 801103 LTR TO STATE OF IL EHCL. FICHE: 06929:067-06929:069 PFL: ADOCK-2700039-C-801103 PACKAGE: 801103-8011100233 10017/3805 ACH: 8011100225 DATE: 801031 1 FT E'3 : 7 t _j RESPONSE TO HRC FIRST SET OF INTERROGATOPIES & REQUEST FOR

L2: PRODUCTION OF DOCUMENTS. EXPLAINS CURRENT STATUS OF LEASE L3: ENTERED & TERMINATED W-STATE OF IL RE LOW LEVEL RADUASTE

DISPOSAL. CERTIFICATE OF SVC ENCL.

HE: 06929:058-06929:064 3

ADOCK-2700039-C-001031 PCCKAGE: 801031-8011100218A 10017/3803 ACH: 8011100218 DATE: 801031 PAGES: 12 L1: RESPONSE TO STATE OF IL FIRST SET OF INTERROGATORIES.

L2: IDENTIFIES PRESENT & PAST EXECUTIVES EMPLOYEES WORKING IN L3: FACILITY COHTRACTORS & COHSUL1dNTS.RELATED CORRESPONDENCE. FICHE: 06929:048-06929t064 PFL: ADOCK-2700039-C-801031 PACKAGE: 8 01031 -8 01110 0218+ 10017/2966 ACH: 8011060388 DATE: 801103 PAGES: 17 L1: RESPONSE TO AHS CHICAGO SECTION INTERROGATORIES 1-3568 L2: 11-14 & 16-19. IDENTIFIES PERSONS INVOLVED IN PREPARATION OF L3: HRC POSITION & EXPERTS INTENDED TO BE CALLED AS WITNESSES. L4: AFFIDAVITS & CERTIFICATE OF SVC EHCL. FICHE: 06911:002-06911:018 PFL: ADOCK-2700039-C-801103 PACKAGE: 801103-8011060380 10017/2884 1: 8011060248 L .Es 801103 PAGES: 38 L1: RESPONSE TO UTIL 801010 INTERROGATORIES & REQUESTS FOR L2: ADMISSIONS & PRODUCTION OF DOCUMENTS. CITES & DOCUMENTS L3: INSTANCES OF N0HCOMPLIANCIS HOTED IN IE INSP REPTS.IHSP L4: CORRESPONDENCE AFFIDAVITS & CERTIFICATE OF SVC ENCL. FICHE: 02319:196-02319:196 FICHE: 94533:054-94533:091 PFL: ADOCK-2700039-C-001103 PACKAGE: 801103-8011060248 10017/2843 ACH: 8011060192 DATE: 801104 PAGES: 4 L1: RE' ONSE STATING HO OBJECTION TO HUCLEAR ENGINEERING CO L2: 80 014 NOTION TO REOPEH DISCOVERY. CONDITIONS POSITION OH MOD L3: OF SCHEDULE TO ALLOW SUFFICIENT TIME FOR HRC TO RESPOND TO L4: DISCOVERY REQUESTS. CERTIFICATE OF SVC EHCL. FICHE: 06912:094-06912:097 PFL: ADOCK-2700039-C-001104 PACKAGE: 801104-8011060192 10017/2405 ACH: 8011050151 DATE: 801031

"~'ES:    8 Lj        RESP 0 HSE TO AHS CHICAGO SECTION IHTERROGATORIES. IDENTIFIES

L2: PERSONS INTENDED TO BE CALLED AS WITHESSES & PERSONS L3: CONSULTED BY UTIL.0BJECTS TO REMAINING INTERROGATORIES. CERTIFICATE OF SVC EHCL. HE: 06897:291-06897:298

ADOCK-2700039-C-801031 PACKAGE: 801031-8011050151 10017/2376 ACH: 8011050050 DATE: 801030 PAGES: 7 L1: REQUEST TO STRIKE STATE OF IL 801020 GENERAL OBJECTION TO L2: DISCOVERY REQUESTS. REQUEST IS IN DISREGA.tD OF COMMISSIGH L3: RULES OF PRACTICE & ASLB 800909 DISCOVERY ORDJR.0BJECTION L4: WAIVED DUE TO UNTIMELY FILING. CERTIFICATE OF SVC EHCL.

FICHE: 06897:260-06897:266 PFL: ADOCK-2700039-C-801030 PACKAGE: 801030-8011050050 10017/2285 ACH: 8011040646 DATE: 801008 PAGES: 1 L1: ACK RECEIPT OF 800509 LTR INFORMING HRC OF STEPS TAKEN TO L2: CORRECT VIOLATIONS NOTED IN WASTE PACKAGING INSP REPT L3: 15000039-79-08. FICHE: 06075:357-06075:359 PFL: ADOCK-5000254-0-801008 J PACKAGE: 801008-8011040646 10017/2102 1: 8011040379 aE 801031 PAGES: 2 L1: FORWARDS UNEXECUTED STIPULATION RE DEFERRING 1AKING OF L2: DEPOSITI0HS UNTIL WRITTEH DISCOVERY IS COi1PLETED & DEFERRING L3: STATE OF IL RESPONSES TO LICENSEE DISCOVERY. REQUESTS L4: SIGHATURE IF CLIENT IS AGREEABLE RELATED CORRESPONDEHCE, FICHE: 06873:349-06873:350 PFL: ADOCK-2700039-C-801031 PACKAGE: 801031-8011040379 10017/1026 ACH: 8010300465 DATE: 801002 PT.GES: 1 LI: o NOTIFICATIDH OF FL D0YLE 801007 FAMILIARIZATION VISIT TO L2: SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY.COHVEYS SEIFKEN L3: & SHAFFHER REQUEST TO VISIT SITE OH 801014-15 TO OBSERVE L4: SITE CONDITInHS & GATHER ENVIROH ASSESSNENT INFO. FICHE: 06332:202-06832:202 PFL: ADOCK-2700039-C-801002 PACKAGE: 801002-8010300465 10017/984 ACH: 8010300369 DATE: 800916 PAGES: 8 [ 'e WASTE PACKAGING INSP REPT 15000039-80-15 OH 800727-0801. Es , HO H0HCOMPLIANCE HOTED.N4JOR AREAS INSPEC1ED: SHIPPING PAPER s

             \

d

L3: , DOT PLACARDING RADIATION LEVELS REMOVABLE CONTAMINATION & L4: DOT MARKING & LABELING REQUIREMENTS FOR FACKAGES. HE: 06836:337-06836:344

ADOCK-5000280-0-800919 KAGE: 800919-8010300360A 10017/978 ACH: 8010300360 DATE: 800919 P2GES: 2 L1:

FORWARDS WASTE PACKACING INSP REPT 15000039-80-15 ON L2: ' 800727-0801.H0 H0HCOMPLIANCE HOTED. FICHE: 06836:335-06836:344

                \

PFL: ADOCK-5000280-0-800919 PACKA _ 800919-8010300360* 10017/940 ACH: 8010300179 DATE: 800916 PAGES: 8 LI: WASTE PACKAGING INSP REPT 15000039-80-15 ON 800727-0801. L2: H0 HONCOMPLIANCE HOTED. MAJOR AREAS INSPECTED: SHIPPING PAPER L3: DOT PLACARDING RADIATION LEVELS REMOVABLE COHTAMIHATION & L4: DOT MARKING G LA8ELING REQUIREMENTS FOR PACKAGES, FICHE: 06834:322-06834:329 PFL: ADOCK-5000335-0-800919 PACKAGE: 8 00919-8 0103 00168a 10017/937 ACH: 8010300168 DATE: 800919

   'ES:           2 L   ,             FORWARDS WASTE PACKAGING INSP REPT 15000039-80-15 ON L2:               800727-0801.HO H0HCOt1PLIANCE HOTED.

FICHE: 06034:320-06834:329 PFL: ADOCK-5000335-0-800919 PACKAGE: 800919-8010300168* 10017/916 ACH: 8010300111 DATE: 801006 PAGES: 2 L1: FORWAR91' 'CHARACTERI2ATION OF EXISTING SURFACE CONDITIONS AT L2: SHEFFIEl.D LOW LEVEL WASTE DISPOSAL FACILITY ' FINAL REPT FOR L3: # JUL 1980. FICHE: 06034:178-06834:281 PFL: ADOCK-2700039-C-801006 PACKAGE: 801006-8010300111* 10017/828 ACH: 8010290380 DATE: 801024 P2GES: 13 L1: REQUESTS FOR ADHISSIGHS INTERROGATORIES & REQUEST FOR L2: PRODUCTION OF DOCUMENTS RE HUREG-CR-1683 OH CHARACTERIZATIOH L3: OF EHIST1HC SURFACE CONDITIGHS. CERTIFICATE OF SVC.RELATED L4: CORRESPONDENCE. FICHE: 06025:320-06025:332 I~5: ADOCK-2700039-C-801024 L JKAGE: 801024-8010290300

10017/802 CCH: 8010290348 E: 801027 ES: 1

INFORMS THAT OH 801027 ALAB-606 BECAME FINAL AGEHCY ACTION L2: FOR PURPOSES OF JUDICIAL REVIEW.

FICHE: 06325:205-06G25:205 PFL: ADOCK-2700039-C-801027 PACKAGE: 801027-8010290348 10017/530 ACH: 80102G0621 D.';TE : 801023 PAGES: 1 Lir FORWARDS HRC 801023 OBJECTIONS TO HUCLEAR ENGINEERING . L2: INTERROGATORIES t REQUESTS FOR ADMISSIGHS & PRODUCTION OF l L3: DOCUMENTS. PLEADING CONSTITUTES REPLY TO TB CONNER 80f010 LTR L4: TO WJ DIRCKS.k-0 EHCL. FICHE: 06324:295-06G2J 295 PFL: ADOCK-2700039-C- 801023 PACKAGE: 801023-8010280611 10017/293 ACH: 8010280267 DATE: 800919 PAGES: J 2 Lir y FORWARDS WASTE PACKAGING INSP REPT 15000039-80-15 OH l L2 . 800727-0808.HO NOHCOMPLIANCE NOTED. FICHE: 06G24:069-06G24:078 ff FL : ADOCK-5000261-0-800919 TKA E: 800919-80102802674 1LJ7/139 ACH: 8010200015 DATE: 801020 PAGES: 4 LI: HOTICE OF APPEARANCE IN PROCEEDING. NOTICE OF SN SEKULER L2: WITHDRAWAL & CERTIFICATE OF SVC EHCL. FICHE: 06321:241-06021:244 PFL: ADOCK-2700039-C-801020 PACKAGE: 301020-8010280015 10017/134 ACH: 8010200010 DATE: 801023 PAGES: 27 LI: RESPONSE IN OPPOSITION TO HUCLEAR ENGINEERIHC 801010 L2 REQUESTS FOR ADMISSIONS INTERROGATGRIES & DOCUMENTS PREMISED L3: OH REQUESTS. SEEKS PROTECTIVE ORDER DUE TO FACTUAL & LEGAL L4: IRRELEVANCE. CERTIFICATE OF SVC ENCL. FICHE: 06G21:109-06G21:215 PFL: ADOCK-2700039-C-801023 PACKAGE: 801023-80 f 0280010 10016/7600 ACH: 8010230424 DATE: 801021 PAGES: 2

/ ^l           FORWARDS CORRECTED PAGE 6 TO OBJECTIONS BY HUCLEAR

(. ENGINEERING CO IHC TO HRC FIRST SET OF IHTERR0CATORIES &

L3: REQUEST FOR PRODUCTION OF DOCUMENTS.RELATED CORRESPONDEHCE. FICHE: 03653:271-03553:272 PFL: ADOCK-2700039-C-801021

       'KAGE: 801021-8010230424 1916/7505 f.CH:       8010240074 DATE:       801021 PACES:      1 L1:         ORDER CLAR?FYING HASLP 800909 PREHEARING CONFERENCE ORDER L2:         UP0H HRC N0?!ONS.EVIDEHCE OH THREE ISSUES OF ORDER WILL BE L3:         HEARD AT HEARINGS AFTER WHICH INITIAL DECISIGH WILL BE L4:         ISSUED. TIME WILL BE GRANTED TO PARTIES RE DEPOSITIONS.

FICHE: 06795:270-06795:270 PFL: ADOCK-2700039-C-801021 PACKAGE: 801021-8010240074 10016/7499 ACH: 8010240065 DATE: 801020 PACES: 2 L1: RESPONSE IN OPPOSITIGH TO ALL IHTERROGATORIES & REQUESTS FOR L2: PRODUCTION OF DOCUMENTS & ADMISSIONS SERVED OH STATE OF IL. L3: SPEC'7 - 09JECTIGHS & ANSWERS WILL BE FILED IN PROPER TIME. LC: CERiar tCATE OF SVC EHCL.RELATED CORRESPONDENCE. FICHE: 06795:259-06795:260 PFL: AD0CK-2700039-C-801020 PACKAGE: 801020-8010240065 10016/6956 ACH: 8010220537 r~ E : 801020 L 2ES: 1 L1s ORDER GRANTING EXTENSIGH UHTIL 801027 FOR COMMTSSIGH TO L2: ELECT WHETHER TO REVIEW ALAO-606. FICHE: 06777:091-06777:091 PFL: ADOCK-2700039-C-801020 PACKACF: 801020-8010220537 10016/6?46 ACH: S010220520 DATE: 8C1020 PACES: 7 L1: MOTION TO VACATE STATE OF IL 801010 NOTICES OF DEPOSITION & L2: REQUESTS FOR PRODUCTION OF DOCUMENTS. REQUEST CONTRARY TO L3: ASLB 800909 ORDER & FAILS TO COMPLY W-RULES OF PRACTICE. FICHE: 03506:001-03506:001 PFL: ADOCK-2700039-C-001020 PACKAGE: 801020-8010220520 10016/6945 ACH: 8010220515 DATE: 801020 PACES: 7 L1: RESPONSE IN OPPOSITIGH TO HRC FIRST SET OF INTERROGATORIES L2: & REQUEST FOR PRODUCTION OF DOCUMENTS. FILES ALREADY L3: INSPECTED & ARE STILL OPEN FOR FURTHER IHSP.CERTAIN INFO L4: PRIVILEGED RE WORK PRODUCT & CLIEHT-ATTY COMMUHICATIONS. HE: 03506:001-03506:001 ["]j L i ADOCK-2700039-C-001020

       .P2CKAGE:             '801020-8010220515 l 10016/6939
- 8010220508
  • E- 801020
  • ES: 10 Lf RESPONSE IN OPPOSITION TO STATE OF IL FIRST' SET'0F L2: INTERROGATORIES. FILES ALREADY INSPECTED & ARE'STILL OPEN.

L3: FOR FURTHER INSP.CERTAIN INFO PRIVILEGED RE WORK-PRODUCT & L4: CLIENT-ATTY COMMUNICATIONS. '

      . FICHE:                03506:00t-03506:001                                                                               a
       'PFL:                  ADOCK-2700039-C-801020 PACKAGE:              801020-8010220508 10016/6847 ACH:                 8010226319 DATE:                801020 PAGES:               6 Lil'                 RESPONSE IN OPPOSITION TO CHICAGO SECTION OF ANS
L2: INTERROGATORY 4 BASED UPON INCORRECT ASSUMPTION 7 &:9 FOR I L3 ANSIGUITY & 10 & 15 FOR LACK OF SPECIFICITY. CERTIFICATE OF j' L4: SVC EHCL.

FICHE: 06776:341-06776:346 PFL: ADOCK-2700039-C-801020 i PACKAGE: 801020-8010220319 l 10016/6146 4 ACH: ~8010200653 ) DATE: 800925 PAGES: 3 Ll COHTRACT: ' EVALUATION OF LOCATION & RATES OF GROUNDWATER [ [) DISCHARGE FROM SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY ' 1 Lv AWARDED TO DOI. 4 FICHE: 06753:322-06753:324 PFL: CONTR--HRC-2-80-69-800925 PACKAGE: 800925-8010200646A 10016/6142 ' . ACH' 801020064G , DATE: 800925

PAGES
1

! L1: HOTIFICATION OF COHTRACT EXECUTION: ' EVALUATION OF LOCATION i L2 & RATEG OF GROUNDWATER DISCHARGE FROM SHEFFIELD LOW LEVEL ! L3: WASTE DISPOSAL FACILITY ' AWARDED TO DOI. l FICHE: 06753:321-06753:324 l PFL: CONTR--HRC-2-80-69-800925 PACKAGE: 800925-8010200646* 10016/6127 l ACH: 8010200623 l DATE: 800930 PAGES: 11 Lt: CONTRACT: ' LOW LEVEL WASTE RADWASTE RECORDS FOR HECO SITES ! L2: AWARDED TO HUCLEAR ENGINEERIHC CO INC. ! FICHE: 06752 353-06752:363 l PFL: CONTR--HRC"2-80-59-800930 i PACKAGE: 800930-80f02006134 l 2 0016/6118 ( 4: 8010200613 l {~"lf v E: 800930 e

                                   /

PCGES: 1 L1: HOTIFICATION OF CONTRACT EXECUTION ' LOW LEVEL WASTE RADWASTE L : RECORDS FOR HECO SITES ' AWARDED TO NUCLEAR ENGINEERING CO IHC. HE: 06752:352-06752:363 PFL: CONTR--NRC-2-80-59-800930 PACKAGE: 800930-8010200613* 10016/6081 ACH: 8010200560 DATE: 801010 PC.GES: 7 L1 HUCLEAR ENGINEERING CO REQUESTS FOR INTERROGATORIES & L2: REQUESTS FOR PRODUCTION OF DOCUMENTS ADDRESSED TO INTERVEHOR L3: COUNTY OF BUREAU. CERTIFICATE OF SVC EHCL. FICHE: 06747:001-06747:001 PFL: ADOCK-27 0 0 039-C-8 01010 PACKAGE: 801010-8010200517AD 10016/6075 ACH: 8010200550 DATE: 801010 PAGES: 8 L1 HUCLEAR ENGINEERING CO INTERROGATORIES & REQUESTS FOR L2: PRODUCTION OF DOCUMENTS ADDRESSED TO INTERVENORS. FICHE: 067474001-06747:001 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010200517AC 10016/6071 ACH: 0010200545 [~ TE: 801010 LG ES: 9 L1: HUCLEAR ENGINEERING CO REQUESTS FOR ADMISSIGHS L2: INTERROGATORIES & REQUESTS FOR PRODUCTION OF DOCUMENTS L3: ADDRESSED TO STATE OF IL. FICHE: 06747 001-06747:001 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010200517A8 10016/6067 ACH: 8010200537 DATE: 801010 PAGES: 18 L1: HUCLEAR ENGIHEERING CO REQUESTS FOR ADMISSIGHS L2: IHTERROGATORIES & REQUESTS FOR PRODUCTION OF DOCUMENTS RE L3: HRC PAST ACTIONS & POSITIONS CONCERNING CONDITIONS AT LG: SHEFFIELD SITE. PFL: ADOCK-27 00 039-C-8 01010 PACKAGE: 801010-8010200517AA 10016/6063 ACH: 8010200531 DATE: 801010 PAGES: 1 L1: REQUESTS THAT ASLA8 DIRECT HRC TO RESPOND TO INTERROGATORIES L2: CONTAINED IN ENCL REQUESTS FOR ADt1ISSIGHS INTERROGATORIES & L3: REQUESTS FOR PRODUCTION OF DOCUMENTS. [-]HE: 06747:001-06747:001 (_/. : ADOCK-2700039-C-801010 l

PACKACE: 801010-8010200517 A 10016/6054 1 8010200517 E: 801010 iES: 1 L1: FORWARDS HUCLEAR ENGINEERING CO REQUESTS FOR ADMISSIONS L2: INTERROGATORIES & REQUESTS FOR PRODUCTION OF DOCUMENTS L3: ADDRESSED TO HRC STATE OF IL & INTERVEHORS. DISCOVERY REQUEST LG: RESPONSE DEADLINE IS 801101.RELATED CORRESPONDENCE. FICHE: 06747 001-06747:001 PFL: ADOCK-2700039-C-801010 PCCKAGE: 801010-8010200517* 1001C/5606 ACH: 8010170391 DATE: 801014 PCGES: 5 L1: REQUEST FOR 2-WK EXTENSION IN ALL PHASES OF ASLB 800909 L2: PREHEARING CONFERENCE ORDER RE DISCOVERY SCHEDULE DUE TO L3: RECENT AVAILABILITY OF REPT OH SITE SURFACE CONDITIONS. L4: CERTIFICATE OF SVC EHCL. FICHE: 06743:264-04743:268 PFL: ADOCK-27 0 0 039-C-8 01014 PACKAGE: 801014-8010170391 10016/5395 ACH: 8010160782 DATE: 801015 PAGES: 5 L1: REQUEST FOR 2-WK EXTENSIGH IN DISCOVERY SCHEDULE RE l ' CHARACTERIZATION OF EXISTING SURFACE CONDITIONS AT

t. s i SHEFFIELD LOW LEVEL WASTE DISPOSAL FACILITY' DUE TO RECENT L4: AVAILABILITY. CERTIFICATE OF SVC ENCL.

FICHE: 06747:001-06747:001 PFL: ADOCK-2700039-C-801015 ' PACKAGE: 801015-8010160782 10016/5393 ACH: 8010160777 DATE: 801010 PAGES: 22 Ll: FIRST SET OF INTERROGATORIES TO APPLICANT NUCLEAR L2: ENGINEERING CO SOLICITING INFO RE ORGANIZATION SHARE 0WNERS L3: DECISIDH TO ABANDON FACILITY RADUASTE COHTAINERS & REMOVAL LG OF RADIOACTIVE MATL. CERTIFICATE OF SVC EHCL. j FICHE: 06728:065-06728:086 PFL: ADOCK-27 0 0 039-C-8 01010 PACKAGE: 801010-8010160774A 10016/5392 ACH: 8010160774 DATE: 801010 PAGES: 2 REQUEST FOR DESIGNATION OF INTERVEHOR WITHESSES. LI: FICHE: 06728:063-06728:086 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010160774* I"l6/4890 f ( -.]: 8010150639

DETE: 801010 PEGES: 7

FIRST REQUEST FOR PRODUCTION OF DOCUMENTS OF APPLICANT HUCLEAR ENGIHEERING CO. REQUESTS INSP REPTS & OOCUMENTS
DESCRIBING RADIONUCLIDE NIGRATION TRENCH FAILURE & LEACHING L4: TESTS. CERTIFICATE OF SVC ENCL.RELATED CORRESPONDENCE.

FICHE: 06710:313-06710:322 PFL: ADOCK-2700039-C-801010 PCCKAGE: 801010-8010150639 10016/488V ACH: 8010150636 DATE: 801010 PCGES: 4 L1 APPLICATIOH FOR SUBPOEHA FOR 801104 DEPOSITION OF JH HEEL. L2: CERTIFICATE OF SVC EHCL.RELATED CORRESPONDEHCE. FICHE: 06710:307-06710:310 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150636 10016/4857 ACH: 8010150603 DATE: 801010 PAGES: 6 L1: INTERROGATORIES SOLICITING INFO RE IDENTITY OF THOSE L2: INVOLVED IN HRC POSITION ON CONDITIONS FOR TERHINATION OF L3: HUCLEAR ENGIHEERING CO OL WITHESSES & DOCUMENTS RELIED UPOH. LG: CERTIFICATE OF SVC EHCL.RELATED CORRESPONDEHCE. FICHE: 067f0:200-06710:285 PFL: ADOCK-2700039-C-801010 F 'K AGE : 801010-8010150603 IL J6/4854 ACH: 8010150596 DATE: 801010 PAGES: 5 L1: INTERROGATORIES DIRECTED TO OTHER INTERVEHORS REOUESTING L2 IDENTITY OF PERSONS & DOCUMENTS USED IN FORMULATING POSITION L3: ON NRC COHDITIONS PROPOSED FOR NUCLEAR ENGINEERING CO OL L4: TERMINATION.W-CERTIFICATE OF SVC.RELATED CORRESPONDENCE. FICHE: 06710:275-06710:279 PFL: ADOCK-2700039-C-801010 PACKAGE 801010-8010150596 10016/4841 ACN 8010150577 DATE: 801010 PAGES: 4 L1: HOTICF OF V DEPO 1X DEPOSITION & REQUEST FOR PRODUCTION OF L2: DOCUMENTS. CERTIFICATE OF SVC ENCL. FICHE: 06710:339-06710:342 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150537H 10016/4836 ACH: 8010150569 DATE: 801010 PAGES: 2 F^1 NOTICE OF RE PHALEN & A ARMBRUST DEPOSITIONS & REOUEST FOR L_j PRODUCTION OF DOCUMENTS.

FICHE: 06710:337-06710:338 PFL: ADOCK-2700039-C-801010 KAGE: 801010-8010150537G 1 6/4834 is 8010150567 DATE: 801010 PAGES: 2 L1: HOTICE OF D BUCKHER & SV WRIGHT DEPOSITIONS & REQUEST FOR L2: PRODUCTION OF DOCUMENTS. FICHE: 06710:335-06710:336 PFL: ADOCK-2700039-C-801010 PT.CKAGE: 801010-8010150537F 10016/4830 ACH: 8010150562 DATE: 801010 PAGES: 2 L1: HOTICE OF V ABBLE & D BICKFORD DEPOSITIONS & REQUEST FOR L2: PRODUCTION OF DOCUMENTS. FICHEr 06710:333-06710:334 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150537E 10016/4826 ACH: 8010150556 DATE: 801010 PAGES: 2 Lt: HOTICE OF WM HIPSHER & HG HEULTON DEPOSITIONS & REQUEST FOR L2: PRODUCTION OF DOCUMENTS. FICHE: 06710:331-06710:332 fL 3: JKAGE: ADOCK-2700039-C-801010 801010-8010150537D 10016/4820 ACH: 8010150551 DATE: 801010 PAGES: 2 Ll: HOTICE OF BT REIDER & WH BOTTON DEPOSITIONS & REQUEST FOR L2: PRODUCTION OF DOCUMENTS. FICHE: 06710:329-06710:330 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150537C 10016/4817 ACH: 8010150547 DATE: 801010 PAGES: 2 Lir HOTICE OF CF EASON & RA SHOEHIG DEPOSITIONS & REQUEST FOR L2: PRODUCTION OF DOCUMENTS. FICHE: 06710:327-06710:328 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150537B 10016/4813 ACH: 8010150542 DATE: 801010 PAGES: 2 Lig HOTICE OF H ALTHOUS2 & 4 CRASE DEPOSITIONS & REQUEST FOR (~'l PRODUCTION OF DOCUNENTS. L 0HE: 06710:325-06710:326

PFL: ADOCK-2700039-C-80f0f0 PC.CKAGE: 801010-801015 0537A 1 C/4807

8010150537 E 801010 P2GES: 2 L1: HOTICE OF TS BAER & JH NEEL DEPOSITIONS & REQUEST FOR L2: PRODUCTIGH OF DOCUMENTS.

FICHE: 06710:323-06710:342 PFL: ADOCK-2700039-C-001010 PCCKAGE: 801010-8010150537* 10016/4513 ACH: 8010150048 DATE: 801010 PAGES: 14 L1: FIRST SET OF INTERROGATORIES & REQUEST FOR PRODUCTION OF L2: DOCUMENTS. REQUESTS INFO RE 1968 ACQUISITION OF CA HUCLEAR L3: INC CORRESPONDENCE W-TELEDYNE INC & ACTIONS TAKEN RE LICENSE L4: TERMIHATIOH. CERTIFICATE OF SVC EHCL. FICHE: 06713:303-06713:316 PFL: ADOCK-2700039-C-001010 PACKAGE: 801010-8010150048 10016/4494 ACH: 8010150005 DATE: 801010 PAGES: 2 L1: ADVISES OF FILING FIRST SET OF INTERROGATORIES TO HUCLEAR L2: ENGINEERING CO.HRC AWAITS ASLB RULING ON FOLLOWUP DISCOVERY IN & DEPOSITT9HS. emdHE: 06710:200-06710:201 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010150005 10016/4385 ACH: 8010140547 DATE: 801008 PAGES: 6 L1: RESPONSE TO HRC 800923 MOTION FOR CLARIFICATION OF 800909 L2: PREHEARING CONFERENCE ORDER. RELIEF WOULD ELIMIHATE THRESHOLD L3: CONSIDERATION OF HRC JURISDICTION OVER HUCLEAR ENGINEERING L4: CO. CERTIFICATE OF SVC EHCL. FICHE: 06705:052-06705:055 PFL: ADOCK-2700039-C-801008 PACKAGE: 801008-8010140547 10016/4373 ACH: 8010140522 DATE: 801010 PAGES: 1 L1: HOTICE OF WITHDRAWAL FROM PROCEEDING. FICHE: 06708:109-06708:189 PFL: ADOCK-2700039-C-801010 PACKAGE: 801010-8010140522 10016/3813 ACH: 8010100129

   "'^7Et     801003 C ES:      1

LI: ORDER GRANTING EXTENSIGH UNTIL 801020 FOR COMMISSICH TO L2: REVIEW ALAB-606. HE: 06690:262-06698:262

ADOCK-2700039-C-801003 KAGE: 801003-8010100129 10016/839 ACH: 8009300019 DATE: 800924 PAGES: 1 Lt ORDER GRANTING EXTENSION UHTIL 801006 FOR COMMISSION TO L2: CONSIDER PETITION FOR REVIEW.

FICHE: 06634:279-06634:279 PFL: ADOCK-2700039-C-800924 PACKAGE: 800924-8009300019 10015/8085 ACH: 8009250002 DATE: 800923 PAGES: 7 Lt MOTION FOR CLARIFICATION OF ASLB 800909 PREHEARING L2 COHFERENCE ORDER WHICH DETERMINED ISSUES TO BE LITIGATED. L3: OUESTIONS RELATIONSHIP BETWEEN UNILATERAL TERMINATION L4: APPROPRIATE TERMINATION & POSSESSIGH.W-CERTIFICATE OF SVC. FICHE: 06606:325-06606:331 PFL: ADOCK-2700039-C-600923 PACKAGE: 800923-8009250002 10015/7180 ACH: 8009230055 DATE: 800903

       'ES:     1
ADVISES THAT GEO-CTRS IHC WILL VISIT SITE OH 800908-12 TO L2: COLLECT INDEPENDENT INF0 USING SUBSURFACE PULSED RADAR L3: g DETECTION EOUIPMENT.

FICHE: 06595:266-06595:266 PFL: ADOCK-2700039-C-800903 PACKAGE: 800903-8009230055 10015/7031 ACH: 8009220179 DATE: 800903 PAGES: 1 Lt ADVISES THAT GEO-CTRS IHC WILL VISIT SITE UN 800908-12 TO L2: 4 COLLECT INDEPENDENT INFO USING SUBSURFACE PULSED RADAR L3: DETECTION EQUIPMENT. FICHE: ' 06593:248-06593:249 PFL: , ADOCK-2700039-C-800903 PACKAGE: 800903-8009220179 10015/4720 ACHR 8009120409 . DATE: 800909 PAGES: 3 Lt: ORDER RE 0000928 PREHEARING CONFERENCE DETERMINING ISSUES IN L2: CONTROVERSY RE POSSESSIGH OF SHM & UNILATERAL TERMINATION L3: OF LICENSE. DISCOVERY REQUESTS TO BE MADE BY S01010 l LC: OBJECTIONS BY 901020 RESPONSES BY 801101 MOTIONS BY 801115. T MHE: 06545:095-06545:097

  ,I            ADOCK-2700039-C-900909

PACKAGE: 800909-8009120409 10015/3156 is 8009090400 E: 800905 ES: 1 Lt ORDER GRANTING EXTENSION UNTIL 800917 FOR COMMISSION TO L2: ELECT WHETHER TO REVIEW ALAB-606 RE LOW LEVEL RAL) WASTE L3: DISF OSAL SITE. FICHE: 06495:155-06495:155 PFL: ADOCK-2700039-C-800905 PACKAGE: 800905-8009090400 10015/3101 ACH: 8009090331 DATE: 800902 PAGES: 12 Li: PETITION FOR REVIEW OF ASLAB 800812 DECISION AFFIRMING ASLB L2: ORDER WHICH DISNISSED APPLICATION FOR EXPAHSION. ALLEGES L3: ERROR IN DECISION THAT ASLB ACTION DID HOT CONSTITUTE MAJOR L47 FEDERAL ACTION. CERTIFICATE OF SVC EHCL. FICHE: 06495:098-06495:109 PFL: ADOCK-2700039-C-800902 PACKAGE: 800902-8009090331 c~

   . .l f
,/^'N L.)
    ?

f-$9 h [ '*, - UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION f) ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges: B. Paul Cotter, Jr. Chairman Dr. Jerry R. Kline Dr. Emmeth A. Luebke In the Matter of: )

                                                           ) Docket No. 27-39SC U.S. ECOLOGY, INC.                               ) ASLBP No. 78-374-01-OT
                                                           )

(Sheffield, Illinois Low-Level ) August 19, 1986 Radioactive Waste Disposal Site) ) MEMORANDUM The People of the State of Illinois, by NEIL F. HARTIGAN, Attorney General of the State of Illincis, submit herewith the attached list identifying presently existing (} documentation pertaining to the physical condition of the Sheffield site, as requested by Item 2 of the Memorandum of the Atomic Safety and Licensing Board issued on August 1, 1986 pertaining to the prehearing conference scheduled to commence on August 19, 1986. The list is attached hereto as " Exhibit A". l Respectfully submitted, NEIL F. HARTIGAN Attorney General State of Illinois BY: , ^}3

  • H2NRY . HEN %R$ON
                                             , Assist   t Attorney General Environmental Control Division 100 West Randolph Street 13th Floor Chicago, Illinois 60601 (312) 917-5582 O

T 4 b. SHEFFIELD DOCUMENT LIST Ogs Law Engineering Borehole Dilution' Study

1. 1/7/83 Law Engineering Contaminated Transport Modeling
2. 3/5/82 Study
3. 11/9/81 Law Engineering Modeling of Radionuclide Transport in Groundwater at the Sheffield Radioactive Waste Disposal Site
4. 3/25/82 Illinois Environ- An Evaluation of the Radioactive mental Council and Chemical Waste Sites in Bureau County
5. 11/7/84 ISGS Geophysical Studies at the Shef-field Low-Level Radioactive Waste Disposal Facility to Evaluate Potential Pathways for the Escape jlf Contaminants
6. 12/81 ISGS A Surficial Electrical Resistivity 5urvey East of the Sheffield Low-Level Radioactive Waste Disposal Site
7. 4/9/86 Oak Ridge Lab. Results of September 1985 Ground-for DOE water Sampling and Analyses, Sheffield, Illinois
8. 4/27/85 Geologic Society Guidebook to Field Investigations of America at the Low-Leve:1 Radioactive Waste Disposal Site Near Sheffield, Ill.
9. 6/85 Oak Ridge Lab. Draft: Results of Reconnaissance Evaluation of Hazardous Chemical
                                                                                 ~

Migration in Ground Water in the Vicinity of Two Low-Level Radio- - active Waste Disposal Facilities

10. 8/85 EG&G for DOE Final: Review of Information on the Sheffield, Illinois Low-Level Waste Disposal Site
11. 10/15/84 EG&G for DOE Draft: Low-Level Waste Site Disposal Program Test Case Report
12. 1/85 NUREG/CR-3865 Evaluation of the Radicactive Inventory In7 and Estimation of Isotopic Release From, the Waste in Eight Trenches at the Sheffield O' Low-Level Waste Burial Site I
                                                       " EXHIBIT A"                                         .
          -     - - - - - - - - -                        -  --   -         -               e , ,-- <   - ,,   ---c

4 I'T 13. 10/15/80 NUREG/CR-2101 Evaluation of Trench Subsidence

      #         to                       and Stabilization at Sheffield Low-Level Radioactive Waste 03/30/81                     Disposal Facility
14. 4/86 NUREG/ll83 Draft: Nonradiological Ground-water Quality at Low-Level Radio-active Waste Disposal Sites
15. 1986 USGS Concepts and Data Collection Techniques Used in a Study of the Unsaturated Zone at a Low-Level Radioactive Waste Disposal Site Near Sheffield, Illinois
16. 1984 USGS Hydrogeology of a Low-Level Radioactive Waste Disposal Site Near Sheffield, Illinois
17. 1984 USGS Hydrogeologic Setting East of a Low-Level Radioactive Waste Dispo-sal Site Near Sheffield, Illinois
18. 1/27-28/82 David Siefken, Site visit notes w/ maps and letter
    /")                 Low-Level Waste  dated 2/2/82 Siefken to Cartwright

(/ Licensing Branch re review of progress (IGS) report for December, trench cap study

19. 1983/1984 IEPA Chemical Sampling, Summary 11/17/83 Collected by J. Student, J. Holzer
20. 4/84-6/84 USEC Piezometer monitoring data
21. 1/85-3/85 USEC Piezometer monitoring data
22. 1/22/85 USEC Piezometer monitoring data
23. 7/5/85 USEC Piezometer monitoring data
24. 1/27/86 USEC Piezometer monitoring data
25. 7/23/80 USEC Monthly trench inspection reports to 12/6/82
26. 12/14-15/82 NRC Inspection report - Inspectors:

M. C. Schumacher and A. G. Januska

27. Received USGS Water level measurements 11/22/83
28. 8/21/84 Tritium Migration Study - USGS results of tracer study

3 k_w) 29. 1/19/84 Tritium Migration Summary of Technical Update Investigation Meeting

30. 11/17/83 TMI Summary of Technical Update Meeting with graphs for Tritium Concentrations in Wells 423, 563, 575, 580, 586, 587, 590
31. 1/17/83 TMI Summary of Technical Update Meeting
32. 11/10/82 TMI Tritium Migration Investigation Status Report
33. 11/9/82 Healy (USGS) Listing of Tritium in Water to Hipsher (USEC) Analyses
34. 8/17/82 TMI Summary of mo'st recent sampling and analysis data
35. 6/1/82 Healy (USGS) Results from samples of 5/10/82 to Hipsher (USEC)
36. 5/11/82 TMI Report with sampling and analysis data for March, 1982

() 7s

37. 4/5/82 TMI Report w/ summary of Technical Update Meeting, Preliminary Core Descriptions for Borings 567 and 568, and sampling and analysis data for March 1982
38. 3/3/82 TMI Summary of Technical Meeting
39. 2/18/83 USGS Data tables of chemical analyses of groundwater samples from rad site welle
           . 40. 10/84-12/84 IDNS               Tritium data Unclear                        Tritium data - sent 7/5/85 Fourth Quarter, 1985           Tritium data First Quarter, 1986            Tritium data i                 1984                           Trench 18 Sump - tritium analysis I

10/85 Tritium Analysis 11/85 Tritium Analysis 12/85 Tritium Analysis

41. 6/7/82 TMI Tritium Migration Investigation Report
        ~T   42. 6/10/82     TMI                Tritium Migration Investigation (d                                       Report

e

                                        4
       ^T      9/8/82    TMI                Tritium Migration Investigation (d

43. Report

44. 12/20/82 TMI Tritium Migration Investigation Report
45. 8/80 NUREG/CR-1683 Report on Surface Conditions at Sheffield: Characterization of Existing Surface Conditions aj[

Sheffield Low-Level Waste Disposal Facility

46. 2/23/81 Meyer (ISGS) to Letter re Sheffield Environmental Neuweg (IDNS) Surveillance Results for 1979-1980 w/ technical data
47. 9/8-9/81 NRC Safety Inspection by M. Schumacher and W. Grant
48. 8/6/81 Gaynor (USEC) to Letter supplying technical informa-McGurren tion requested in Attachment A to McGurren's letter of 5/28/81
49. 1/26/83 Siefken Notes of Steering Committee Meeting
     /~'s                                   on January 17, 1983 for Sheffield (l                                     Migration Study and of Site Visit for Meeting with USGS on January 18, 1983
50. 3/28/83 Siefken Trip report
51. 8/11/83 Shaffner Trip Report for 7/27-28/83 site visit
52. 12/6-7/83 Shaffner Review of trip report
53. 2/17/84 NRC Addendum to Report No. 27-39/83-01 Consists of data sheets
54. 12/7/83 DNS Location of Testing by DNS O
  • E/tiisir.3 Q~l- % 5C 1 3 VI %  ;

9 f) DANG SHEFFIELD DOCUtiENT LIST 3jp/gg Dames & Mccre, Investigations on potential groundwater migration from Sheffield low level radioactive waste disposal facility, urpublished repcrt prepared for Nuclear Engineering Co., September, 1979. Dragonette, K., J. Blackburn, and K. Cartwright, Interagency task force report on the proposed decomissioning of the Sheffield r.uclear waste disposal site. Report submitted to the U.S. Nuclear Regulatory Cc m ission and the State of Illinois. 1979. EG&G Idaho Inc., Review of information on the Sheffield, Illinois low-level waste oispcscl site, prepared for 00E LLW Site Transfer Program, Aug. 1985. Foster, J.B., and J.R. Erickson. Preliminary report of the hydrogeology of a low-level radioactive waste disposal site near Sheffield, Illinois. U.S. Geological Survey Open File Report 79-1545. 1980. (superseded by Foster et al. 1984a) . Foster, J.B., R.W. Hea!y, K. Cartwright, and T.M. Johnson. Hydrogeologic controls on the extent and rate of tritium migration from a low-level pd radioactive waste disposal facility near Sheffield, Illincis. (abstract) GSA Abstracts with Programs,1983. Foster, J.B. , J.R. Erickson, and R.W. Healy Hydrogeology of a low-level radioactive-waste disposal site near Sheffield, Illinois, U.S. Geological Survey Water-Resources Investigations Report 83-4125, 1984a. Foster, J.B., G. Garklavs, and G.W. Mackey. Hydrogeologic setting east of low-level radioactive-waste disposal site near Sheffield, Illinois. U.S. Geological Survey Water Resources Investigations Report 84-4183, 1984b. Foster, J.B., G. Garklavs, und G.W. Mcckey. Geologic and hydrologic data collected during 1976-1983 at the Sheffield low-level radioactive waste disposal site and adjacent areas, Sheffield, Illinois. U.S. Geological Survey Open File Report 83-926, 1984c. Garklavs, G. , and R.W. Healy, Grcund-water flow and tritium movement at a low-level radioactive-waste disposal site near Sheffield, Illinois, U.S. Geological Survey Water-Resources Investigations Report 85-DRAFT, 1985. (has been approved for publicction, 1986) Garklavs, G., and L.G. Toler, Measurement of ground-water velocity using rhodamine wt dye near Sheffield, Illinois, U.S. Geological Survey Open-File Report 84-0856, 1985. O

     . DANG SHEFFIELD DOCUMEf:T LIST (Jl                                                    Goode, D.J., Nonradiological grcundwater quality at low-level radioactive waste disposal sites, U.S. Nuclear Regulatory Commission NUREG-1183, Apr 1986.

Gray, J.R., Runoff, sediment transport, and landform modifications near Sheffield, Illinois, p. 534-539 in Proc. of the fifth annual Participants' Information ?!ectire, DOE Low-Level Waste Management Program, CONF-8308106, Dec 1983. Gray, J.R., Erosion and landform modification at a low-level radioactive waste dispesel facility near Sheffield, Illinois, p. 37-39 in G.D. Glysson (ed.), Proc. of the Advanced Seminar on Sedimentation, Aug 15-19, 1983, Denver Celerado, U.S. Geological Survey Open-file report 0F 85-98,1986. Healy, R.W., Preliminary results of a study of the unsaturated zone at the low-level redicactive waste disposal site near Sheffield, Illinois, 669-673, in Proc. of the fifth annual Participants' Information Meeting, DOE Low-level Waste Management Program', CONF-8308106, Dec 1983. Healy, R.W., C.A. Peters, M.P. deVries, P.C. Mills, and D.L. Poffett. Study of the unsaturated zcre at a low-level radioactive-waste disposal site, pJ 820-831 in Proc., Conf. on Characterization and Penitoring of the Vadose Zone, Las Vegas, Nevada. December 8 & 9, 1983, National Water Well Assoc., 1984. Heigold, P.C., R.H. Gilkeson, and T.H. Larson, Shallow geothermic survey east of Sheffield low-level radioactive waste site, Bureau County, Illinois: Illinois State Geological Survey unpublished letter report to Illinois Department of Nuclear Safety, 1983. Heigold, P.C. , and T.H. Larson, Geophysical studies at the Sheffield low-level radioactive waste dispesal facility to evaluate potential pathways for the escape of contaminants, DRAFT report prepared by ISGS for IDNS, November 7, 1984. Heim, G.E., and M.V. Machalinski, Characterization of existing surface conditions at Sheffield low-level waste disposal facility, U.S. Nuclear Regulatory Commission f;UREG/CR-1683, Aug 1980. Johnson, T.M., and J. Grant, Mcdeling of radionuclide transport in ground water at the Sheffield low-level radioactive waste disposal site, DRAFT internal report, l'.S. fiRC files, September,1980. O

["l DANG SHEFFIELD DOCUMENT LIST Kahle, R., and J. Rcwlands, Evaluation of trench subsidence and stabilization at Sheffield low-level radioactive waste disposal facility, U.S. NRC, NUREG/CR-2101, 1981. Larson, T.H. A surficial electrical resistivity survey east of the Sheffield low-level radioactive waste disposal site, Bureau County, Illinois. Illinois State Geological Survey Contract / Grant Report 1981-6. 1981. Larson, T.H., R.H. Gilkeson, and P.C. Heigold,1983, Surficial electrical resistivity and shallow geothermic surveys east of the Sheffield low-level radioactive waste disposal site, Bureau County, Illinois: Illinois State Geological Survey Contract / Grant Report 1983-1, 1983. Law Engineering Testing Co., Borehole dilution testing study - Sheffield low-level radioactive waste disposal site, letter report submitted to U.S. Ecology, Jan 1983. MacKenzie, D.R., J.F. Smalley, C.R. Kempf, and R.E. Barletta, Evaluation of the radioactive inventory in, and estimation of isotopic release from, the waste in eight trenches et the Sheffield low-level waste burial site, U.S.

    /3       Nuclear Pegulatory Commission NUREG/CR-3865, 1985.

V Nuclear Engineering Company Inc., Sheffield low level radioactive waste disposal facility, Report of investigaticns ccnducted during February and March, 1978. Nuclear Engireering Company Inc. Safety analysis report for Sheffield Illinois 1cw !cvel radioactive waste disposal site. Urfublished report submitted to U.S. Nuclear Regulatory Commission, Washington DC. 1979a. Nuc! car Engineering Company Inc. Site stratigraphic study Sheffield Illinois low level radioactive waste disposal site. Unpublished report subnitted to U.S. Nuclear Regulatory Commission, Washington DC. 1979b. Nuclear Engineering Company Inc., Boring logs of several locations at tFe Sheffield low level radioactive waste disposal facility, unpublished communications, 1979c. Nuclear Engineering Company Inc., Envirctmental report for Sheffield Low-level Radioactive Waste Disposal Facility near Sheffield, Illinois, . . . Nuclear Regulatory Commission. Irterim environmental appraisal, Sheffield low-level radioactive waste disposal facility, Sheffield, Illinois. Unpublished report prepered by Low-level Waste Licensing Branch, Division of Waste Panagement. 1981. ( O l.

f

O o^"a s"errie'o ooco"e"7 'ts' 1

Piciulo, P.L., C.E. Shea, and R.E. Barletta, Arclyses of soils from an area adjacent to the low-level radioactive waste disposal site at Sheffield, Illinois, U.S. fluclear Regulatory Comission NUREG/CR-4069,1985. U.S. Ecology Inc., Plan for closure U.S. Ecology, Inc. Hazardous Waste Management Facility, ILD 04-506-3450, Near Sheffield, Illinois, Nov 1984, t U.S. Ecology Inc., Plan for post-closure U.S. Ecology, Inc. Hazardous Waste Managenent Facility ILD 04-506-3450, Near Sheffield, Illinois, Nov 1984. i O ) i f I . O i 4 l s

f/MdIr ,997 I{3 e '

 .                                                                           a , Ni s c.

CHRON0 LOGY - NEC0 - SHEFFIELD, ILLIN0IS SITE ND April 16,1975 - August 30, 1976 dT DATE TO, FROM SUBJECT 4/16/75 Nathan Bassin Charles F. Eason Ltr. requesting NRC's coments on (1645) (NRC) (NECO) request by the Illinois State Water Survey for permission to conduct a ground-water pollution study at Sheffield. 5/12/75 Nathan Bassin George D. Re: ltr dated 4/16/75. Forwards (NRC) DeBuchananne DeBuchananne's comments that he can (USGS) find no reason to give permission for Ill. State Waster Survey Study. 5/23/75 Dr. Howard J. James N. Neel Ltr forwarding amendment application (56595) Larson (NECO) for Lic. #13-10042-01. re: To use (NRC) excess soil excavated from trenches to build compacted fills in topo-graphic depressions. 6/04/75 Charles F. Eason Nathan Bassin Re: 1tr dated 4/16/75. Stating NRC (NECO) (NRC) views Illinois Water Survey as a well thoughtout investigative program. 6/16/75 James Neel James G. Keppler Re: Excavation of Trench No.18. (NECO) (NRC-RO. III) No burial of radioactive material will' be made in Trench No.18 until action is initiated to determine nature and source of water entering excavation. 7/09/75 James N. Neel D.A. Nussbaumer Re: Amendment Application dtd 5/23/7E (NECO) (NRC) Requests NECO to submit complete up-to-date renewal application reflecting operations, current & proposed & environmental report. 9/22/75 L.V. Gossick James N. Neel Re: Amendment Application dtd 5/23/75 (NRC) (NECO) and 1tr dtd 7/09/75 from Nussbaumer. Requests exemption from environmental report requirement. 10/24/75 R.E. Heineman D.A. Nussbaumer Memo requesting Heineman to review and (NRC) (NRC) comment on amendment application dtd 5/23/75 and 9/22/75 ltr to Gossick. 10/24/75 G.D. DeBuchananne Bernard Singer Memo requesting DeBuchananne to review l (USGS) (NRC) and coment o'n amendment application dtd 5/23/75 and 9/22/75 ltr to Gossick

   *5/1/72    N. Bassin            Roberta Harris     Transmits 5 copies of NEC0's revised (NRC)                (NECO)             Radiological Physics Safety Manuel.

l l

Sheffield Chronology Page 2 (v\ DATE TO FROM SUBJECT 10/29/75 James N. Neel Kenneth R. Chapman Re: ltr dtd 9/22/75 to Gossick. (NECO) (NRC) NRC estimates approx. 60 days to review request for exemption to environmental report requirement. 11/07/75 Richard Cunningham James N. Neel Re: ltr dtd 10/29/75 from Chapman. (NRC) (NECO) Stresses immediate need for approval of 5/23/75 amendment application and forwards copy of ltr from State of Illinois approving NEC0's fill & compact program; expresses hope that NRC give credit and faith to Ill. review. 11/18/75 Bernard Singer Charles F. Eason Forwarding correspondence between NECO (NRC) (NECO) and Ill. Dept. of Health on Trench 18. 11/21/75 Bernard Singer Charles F. Eason Re-emphasizing NEC0's immediate need (NRC) (NECO) to make Trench 18 useuable by methods agreed upon by Ill. Dept. of Radio. Health.

    .O.
    \>    11/26/75     Bernard Singer      G.D. DeBuchananne       Re:    ltr dtd 10/24/75 from Singer.

(NRC) (USGS) DeBuchananne's comments on review of 5/23/75 amendment application and 9/22/75 ltr to Gossick. 12/04/75 Charles F. Eason Bernard Singer Re: ltr dtd 11/18/75 from Eason. (NECO) (NRC) NRC has no objection to use of Trench 18 for burial of radioactive waste subject to conditions stated in ltr. , 12/17/75 D. Nussbaumer H.R. Denton Re: Memo dtd 10/24/75 to Heineman.

(NRC) (NRC) Comments on review of 5/23/75 amend-ment application and 'o '.2/75 ltr to Gossick and requests additional information by Division of Technical Review Staff.

12/18/75 Bernard Singer Nathan Bassin Provides summary of USGS's and Div. (NRC) (NRC) of Technical Review's comments on 5/23/75 amendment application and Bassin's recommendations. 12/22/75 James N. Neel Bernard Singer Ltr gives authority to NECO to commenc-(NECO) (NRC) construction of compacted land fill I ~% areas, but not to bury in those areas; l (d s requests additional informatio7 on environmental report exemption request

Sheffield Chronology Page 3 . TO FROM SUBJECT _ DATE 1/16/76 James N. Neel D.A. Nussbaumer Re: ltr from Nussbaumer dtd 7/9/75. (NECO) (NRC) Requests that 15 days from date of ltra NECO advise of date for submission of renewal application and ER. 1/27/76 Vernon D. Apple Verdun Randolph Information copy of ltr from Ill. Dept (NECO) (Ill. Dept. of of Health, re: negotiations on burial Heal th) of liquid scintillation vials. 2/06/76 D.A. Nussbaumer Charlesk.Eason Re: ltr dtd 1/16/76 from Nussbaumer. (NRC) (NECG) Informs NRC that NEC0 should have renewal application done befoie end of year. 4/02/76 Charles F. Eason D.A. Nussbaumer Re: ltr dtd 2/06/76 from Eason. (NECO) (NRC) NRC requests submittal of renewal application & ER by 6/30/76. Bernard Singer Howard W. Althouse Ltr report from Emcon Assoc. answers 4/06/7Q requests for additional information (09J//f) (NRC) (NECO) in 12/22/75 ltr from Singer. Ltr forwarding 6 extra copies of O 4/12/76 Nathan Bassin (NRC) Charles F. Eason (NECO) response dtd 4/06/76, imediately above. 4/13/76 L.G. Hulman Bernard Singer Requesting review of NEC0's 4/06/76 (NRC) (NRC) response to Singers 12/22/75 ltr. 4/13/76 G.D. DeBuchananne Bernard Singer Requesting review of NEC0's 4/06/76 (USGS) (NRC) response to Singer's 12/22/75 ltr. 4/19/76 D.A. Nussbaumer Charles F. Eason Re: requesting amendment to Lic. (NRC) (NECO) No. 13-10042-01' to permit the pro-cessing and disposal by land burial ot unopened scintillation vials at Sheffield, as approved by Illinois, ' apy attached. 4/27/76 Lee V. Gossick H.G. Houlton Announces appointment of Mr. William (NRC) (NECO) H. Button as Chief Radiation Protectie Officer. 5/11/76 L.G. Hulman Bernard Singer Follow-up memo to 4/13/76 memo from (NRC) (NRC) Singer to Hulman. Requests determina: tion of time it would take for waste buried at site to migrate to site boundary and requests comments to

   ,]                                                      4/13/76 memo and 5/11/76 meme by May 24, 1976.

Sheffield Chronology Page 4-DATE TO, FROM SUBJECT 5/18/76 Charles F. Eason Nathan Bassin Re: 1tr dtd 4/19/76 from Eason. (NECO) (NRC) requests additional information in order to continue review of proposed . amendment dtd 4/19/76. 5/19/76 Bernard Singer G.D. DeBuchananne Re: ltr dtd 4/13/76 from Singer. (NRC) (USGS) Comments on review of NEC0's 4/6/76 response to Singer's 12/22/75 ltr. 6/04/76 Bernard Singer L.G. Hulman Forwarding coninents and questions (NRC) (NRC) on NECO's letter report by EMCON Assoc. dtd 4/06/76. 6/07/76 R.E. Cunningham H.W. Althouse Request NRC's approval to lift 300 (NRC) (NECO) millicurie limit per container on burial of radioactive waste in Trench 18; recently lifted by State of Ill. subject to specific limitations. 6/14/76 Charles F. Eason Bernard Singer Requests a revised and more detailed - (NECO) (NRC) application on use of compacted fill for burial of radioactive wastes, O than 5/23/75 amendment application and supplemental letter report dtd 4/06/76. 6/21/76 W.P. Gammill L.G. Hulman Information copy of Report on (NRC) (NRC) Sheffield Waste Disposal Facility Site-visit on 6/15/76, and relays additiona questions raised as result of visit. 6/22/76 H.W. Althouse Verdun Randolph Information copy of l'+r to NECO, from (NECO) (Ill. Dept. of Ill. Dept. of Public Health, approving Public Health) use of Trench 18 under conditions stated in letter. 6/24/76 Files Nathan Bassin Trip report on visit to NECO, (NRC) Sheffield, Illinois waste disposal site, June 15, 1976. 6/24/76 L. V. Gossick James N. Neel Ltr requests NRC enter into an (NRC) (NECO) appropriate Letter Agreement to permit NECO to cor,struct 2 fill & compact trenches at Sheffield for research and development purposes. 6/28/76 Charles F. Eason Bernard Singer Requests additional information as a O (NECO) (NRC) result of 6/15/76 visit to Sheffield site; asks that replies be incorporate = into response to 6/14/76 ltr.

Sheffield Chronology Page 5 DATE TO FROM SUBJECT 6/28/76 R.E. Cunningham James N. Neel Response to Cunningham's concern (NRC) (NECO) about source and implication of damp appearance of exposed walls of Trench 18. 6/29/76 Bernard Singer L. Hulman Review of NECO's ltr dtd 6/28/76 (NRC) (NRC) indicates Trench 18 may not meet licensing requirements. 6/30/76 James N. Neel R.E. Cunningham Re: ltr dtd'6/24/76 to L.V. Gossick, (NECO) (NRC) ltr acknowledges receipt of 6/24/76 ltr; the need fcr a license applica-tion which incor;; orates the compacted fill concept; and states agreement to arrange a meeting to discuss request. 6/30/76 R.E. Cunningham James N. Neel Re: ltr dtd 6/28/76 from Neel. (NRC) (NECO) Clarifies statements in 6/28/76 ltr about Trench 18.

                                                            '4st or atteadees at acco/"ac "eetia9-O   7/o7/78 7/13/76    R.E. Cunningham    William 0. Doub     Ltr summarizes conclusions reached at (NRC)             (LeBoeuf, Lamb,   7/07/76 meeting and notes plans for a Leiby & MacRae) consultant to prepare an evaluation of Trench 18 for submittal to NRC.

7/27/76 R.E. Cunningham James N. Neel Ltr forwards Appendix A of report (NRC) (NECO) entitled, " Investigation of Trench 18. Nuclear Waste Disposal Site, Sheffielc Site, Bureau County, Ill.," which is response to meetings of 6/15/76 and 7/07/76, and responds to additicnal questions raised at 7/23/76 meeting. Original report was submitted at 7/23/76 meeting w/NRC & NECO. 7/27/76 Attendees Bernard Singer Notification of meeting with NECO, (NRC) (NRC) re: Trench 18 & NEC0 proposed compact and fill experiment. 8/18/76 D.A. Nussbaumer W.P. Gammill After 7/23/76 meeting w/NECO and (NRC) (NRC) review of report " Investigations of Trench 18," concludes Trench 18 is not suitable for waste burial for reasons stated in memo. Q 1 .

i Sheffield Chronology Page 6 O DATE J0 FROM SUBJECT 8/19/76 W.P. Gamill L.G. Hulman Information copy, re: telephone (NRC) (NRC) conversation with Dr. Paul Rizzo, Diappolonia, Consultants, discussing Trench 18. 8/19/76 Nate Bassin James N. Neel (TWX) Relayir; ^assage that on basis (NRC) (NECO) of unconfirmed reading of one of four piezometers at Sheffield, they have ceased burial operations ini french 18, until all issues of groundwater elevation have been resolved. 8/30/76 R. Cunningham James N. Neel Ltr transmitted 15 copies of applica-(F3433) (NRC) (NECO) tion from NEC0 for interim authoriza-tion to bury low-level radioactive wastes in Trench 14 at Sheffield. O .l 1 1 O

CHRON0 LOGY - NEC0 - SHEFFIELD, ILLIN0IS SITE O Septem8er 3. i976 - Jeeeerv 10 ie77 DATE FROM SUBJECT T0_ 9/03/76 H.G. Houlton NRC 2 Affidavits fully stating reasons (NECO) why some material in 8/30/76 application are considered proprietary. 9/20/76 Berna-d Singer H.G. Houl ton Withdrawing request of 6/07/76, (NRC) (NECO) on Trench 18. 9/20/76 Bernard Singer W.E. Kreger Comments on Environmental Monitoring (NRC) (NRC) Program for Trenches 14 and 14A. 9/21/76 James N. Neel Bernard Singer Authorizing use of Trench 18 for (NRC) burial of radioactive wastes subject (NECO) to restrictions and conditions stated in letter. 9/22/76 Bernard Singer L.G. Hulman Comments on NEC0 proposal for burying (NRC) (NRC) low-level waste in Trench 14. 9/22/76 Bernard Singer H.G. Houlton Forwarding copy of minutes of meeting O- (naC) (ntCo) neld 9/13/76 oa Saa ead ca for Sheffield low-level waste disposal site. 9/23/76 Bernard Singer Leroy E. Stratton Analysis of waste material in concrete (NRC) (Ill . Dept of and steel bins from Dresden Nuclear Public Health) Station that are being used to line bottom of Trench 18. 9/23/76 Bernard Singer Charles F. Eason Requesting change of Condition 2, of (NRC) (NECO) 9/21/76 ltr which authorizes use of Trench 18 at Sheffield. 9/23/76 Bernard Singer J. Carl Stepp Coninents and recommendations on (NRC) (NRC) review of amendment application dtd 8/30/76 for Trench 14. 9/28/76 Lee V. Gossick William H. Button Inforr,'ing NRC of selection of (NRC) (NECO) Mr. Rick Schoenig as Site Radiological' Control & Safety Officer at Sheffield; resume attachad. O _~ _y . _ _ _ . __ __ _ _ _ _ _ . _ _ __

Sheffield Chronology Page 2 DATE 0 FROM SUBJECT fg O 9/29/76 Bernard Singer James N. Neel Ltr transmits report entitled, (NRC) (NFCO) " Radiological Assessment of Trench 18," prepared by Law Engineering Testing Co, and requests conditions 5 and 7 of 9/21/76 ltr from Singer be deleted; requests this letter and attachment be incorporated by reference in present operating license. 10/07/75 Lee V. Gossick Charles F. Eason Informing NRC of appointment of (NRC) (NECO) i Mr. Bruce T. Reich as Acting Chief Radiation Protection Officer; resume attached. 10/12/76 Bernard Singer H.G. Houl ton Requests submittal of license renewal (NRC) (NECO) application be set for Jan.1,1977 instead of Nov.1,1976. 10/14/76 Bernard Singer G.D. DeBuchananne Comments on amendment application (NRC) (USGS) dtd 8/30/76 for Trenches 14 and 14A. 10/29/76 James N. Neel Leroy E. Stratton Information copy of 1tr to NEC0, on (NECO) (Ill. Dept. of IDPH's review and comments of amend-Public Health) ment application dated 8/30/76 for Treach 14; eaditoae1 iafo requestea-O- 11/01/76 Attendees Bernard Singer Notification of meeting w/NECO on (NRC) (NRC) 11/08/76, to discuss their 8/30/76 amendment application for establish-ment of Trench 14. 11/03/76 Bernard Singer H.G. Houl ton Confirming NEC0/NRC meeting on (NRC) (NECO) 11/08/76; re: review of 8/30/76 amendment application for Trench 14 and 14A. 11/04/76 Leroy E. Stratton H.G. Houlton Information copy of response from NEC0 (Ill . Dept. of (NECO) to Ill. Dept. of Health; replying to Public Health) to questions raised in 10/29/76 ltr. 11/04/76 Bernard Singer H.G. Houlton Ltr transmits 15 copies of amended (NRC) (NECO) application, originally filed 8/30/75, for authorizatial to bury low-level radioactive wastes in Trenches 14 and 14A at Sheffield. t LO I

Sheffield Chronology Page 3 O Da1E 10 rROM SUBaEC1 . 11/08/76 File List of 11/08/76 meeting attendees present to discuss NECO's application for establishment of Trench 14 at Sheffield. 11/12/76 Lea V. Gossick H.W. Althouse Ltr announcing appointment of (NRC) (NECO) Mr. Russell P. Moore as Acting Site Manager at Sheffield; resume attached. 11/12/76 Pete Tedeschi H.W. Althouse Information copy of ltr sent to Ill. (3315) (Ill. Dept. of (NECO) Dept. of Public Health from NEC0, Public Health) forwarding field records describing procedure used in closing Well E on September 22, 1976. 11/15/76 Nate Bassin W.H. Button Forwards responses to questions raised (3348) (NRC) (NECO) at 11/08/76 meeting; with ltr dtd 11/15/76 to Wayne Britz, NRC, from Button, attached which forwards additional responses to questions raised at 11/08/76 meeting. 11/15/76 H.G. Houlton Bernard Singer Ltr stating NRC has completed review O (NECO) (NRC) of 11/04/76 amended application and lists items that need clarification. 11/15/76 Lee V. Gossick G.S. Williamson Announcing appointment of (NRC) (NECO) Mr. Vernon D. Apple as Site Manager at Richland, Washington site. 11/15/76 G.D. DeBuchananne Bernard Singer Ltr acknowledges Mr. Ren den Sun's (USGS) (NRC) (USGS) attendance at 11/08/76 meeting w/NRC/NECO and asks DeBuchananne to review 11/04/76 amended application which was provided to Mr. Sun. 11/18/76 Bernard Singer H.G. Houlton Ltr forwarding reply to questions (3393) (NRC) (NECO) asked in ltr dtd 11/15/76 to NEC0, and ltr attached w/ responses. 11/19/76 H.G. Houlton Bernard Singer Approving submittal of 1icense to be (NECO) (NRC) set at 1/01/77, as requested in ltr dtd 10/12/76 from NECO. O

Sheffield Chronology Page 4 ( U) DATE T0, FROM SUBJECT 11/24/76 Bernard Singer James N. Neel Ltr refers to 9/03/76 proprietary (NRC) (NECO) affidavit; informing NRC that all information in 11/04/76 application and as amended 11/18/76, is considered proprietary by NEC0; proprietary affidavit attached. 11/30/76 Bernard Singer W.S. Bivins Coments on review of NEC0's applica-(NRC) (NRC) tion for Trenches 14 and 14A. t 12/07/76 H.G. Houlton Bernard Singer NRC's review and coments of NECO (NECO) (NRC) application for Trenches 14 and 14A; additional information requested. 12/07/76 Bernard Singer W.E. Kreger Review of information submitted by (NRC) (NRC) W.H. Button, NEC0, dtd 11/15/76; finds interim monitoring program for Trenches 14 and 14A adequate until full review is perfonned after receipt of 1/77 application. 12/10/76 Bernard Singer James L. Grant Ltr report response to 12/07/76 ltr rm (NRC) (Law Engineering from Singer. d Testing Company) 12/16/76 Bernard Singer G.D. DeBuchananne Coments on review of 11/04/76 (NRC) (USGS) amended application for Trench 14. 12/23/76 Bernard Singer Charles F. Eason Forwarding duplicate copy of data (NRC) (NECO) compiled by Law Engineering Testing Company, dtd 12/10/76. 12/28/76 James N. Neel Bernard Singer Requesting documentation of agreement (NECO) (NRC) at 12/21/76 meeting to withoraw some proprietary information in application dated 11/04 and 11/18/76. 12/29/76 Bernard Singer Phillip H. Muir Forwards a revised application for (NRC) (NECO) withholding information from public disclosure and affidavit, which modifies 11/24/76 affidavit in accordance with 12/21/76 meeting and ltr to NEC0 dtd 12/28/76. 12/29/76 Bernard Singer W.S. Bivins Comments on technical review of (NRC) (NRC) application for Trenches 14 and 14A. l l l

Sheffield Chronology Page 5 DATE_ T0, FROM SUBJECT 12/30/76 Bernard Singer Charles F. Eason Returns signed copy of 12/28/76 (NRC) (NECO) 1tr from NRC. 1/03/77 Bernard Singer Charles F. Eason Forwards 3 additional copies of data (NRC) (NECO) compiled by Law Engineering Testing Company dtd 12/10/76. 1/06/77 Amendment No.11; Lic. No.13-10042-01 Authorizing Trenches 14 and 14A. 1/10/77 Chase R. Stephens Bernard S'inger Forwards FEDERAL REGISTER Notice (NRC) (NRC) dtd 1/06/77 entitled, " Notice of Amendment of Byproduct, Source and Special Nuclear Material License," to be sent to FEDERAL REGISTER for publication. (42 FR 3228, 1/17/77) O i l O

SHEFFIELD, ILLIN0IS SITE , v NECO CHRON0EUu. SUBJECT renew FROM 0042-L Ltr transmits NECO's license DATE TO Bernard Singer Charles F. Eason (NECO) application for Lic. No. 12/29/76 considered proprietary. (NRC) Encloses Re: lte dtd 12/29/76 Bernard Singer Phillip H. Muir (NECO)

  • Application for Withhold 1/07/77 w/ supporting affidavit.

(NRC) Hydrologic EngineeringldAcce L.G. Hulman Review of SAR and ER renewal application. F. Miraglia (NRC) SAR; 3/08/77 (NRC) J.T. Collins NRR's review ofi She (NRC) 3/10/77 R.H. Vollmer (NRC) M.B. Spee9i er A9ende waste treatmentitemsplantforreview.Sh 3/ii/77 M.L. ernst (NRC) Suggested items for inclus O (NRC) R.H. Vollmer Sheffield ER. f Frank Miraglia (NRC) 3/11/77 (NRC) DSE staff review and c , F.J. Miraglia Sheffield ER & SAR. 3/14/77 Frederick Combs (NRC) Comments and reviewld of (NRC) J. Carl Stepp engineering aspects of/7 Sh Bernard Singer renewal application dtd 12/ (NRC) re: di-3/16/77 (NRC) Mtg w/NECC, 3/11/77.ava Nathan Bassin space schedule for licnesing of ex Files (NRC) site; and possible amendmen t 3/18/77 trenches similar to 14 telephone conversati' Re: Bernard Singer C. Eason, NECO, concernir Files (NRC) for NRC review of.She 3/31/77 Informs NECO that Licer Xitty)Dragonette case has been transfer Management Program; ai Phillip H. Mui* (NRC 5/05/77 proprietary informatie (NECO) i ( l l l l -

Sheffield Chronology Page 2 DATE TO FROM SUBJECT 6/01/77 Ro. Paul Kitty Dragonette Forwards one copy of all documents ( P. 10. 3) (NRC) pertaining to NECO license renewal application, and treat as proprietary.: 6/23/77 Kitty Dragonette T.S. Baer Re: ltr dtd 5/05/77 from Dragonette. (NRC) (NECO) NECO agrees w/part of proprietary determination & asks reconsideration of Sections 3.4 & 3.5 of ER; requests mtg after complete review of all proprietary information. 7/11/77 Kitty Dragonette W.H. Button Advises of appointment of Richard A. (NRC) (NECO) Schoenig to Assistant Manager of Sheffield site. 7/28/77 Charles Eason Kitty Dragonette Forwards copies of internal NRC memos (NECO) (NRC) concerning NRR pre-acceptance review of NECO ER & application for renewal and expansion. 8/05/77 William P. Bishop T.S. Baer Ltr transmits copies of application (89067) (NRC) (NECO) to amend Lic. No. 13-10042-01 to provide for authorization for s construction & disposal of wastes in Trenches llA, 12, 13, 15, 16, 17 & 19 at Sheffield. 8/11/77 Kitty Dragonette Charles F. Eason Transmits marked copies of 4 supportin: (NRC) (NECO) documents to NECO license renewal application which they consider proprietary. Undated W.P. Bishop W.H. Button Informs of employment of Andrew J. (NRC) (NECO) Armbrust as Radiological Control & Safety Technician at Sheffield. 8/29/77 M.J. Bell T.S. Baer Re: mtg w/NEC0 & NRC 8/19/77. (3301) (NRC) (NECO) Ltr transmi.ts pages 3.2-1 & 3.3-1 to be substituted in SAR of license renewal application. 9/07/77 M.J. Bell T.S. Baer Re: mtg w/NEC0 & NRC, 8/19/77. (3302) (NRC) (NECO) Ltr withdraws proprietary information status, with exception of 2 sections in supporting documentation manuels. 9/13/77 M.J. Bell T.S. Baer Forwards NECO changes to Site Opera-(3384) (NRC) (NECO) tions manual (Chapter 2) for review { and comments.

Sheffield Chronology Page 3 O DATE TO FROM SUBJECT 9/15/77 M.J. Bell T.S. Baer Informs NRC of Bruce T. Reich's (3597) (NRC) (NECO) appointment to Chief Radiological Control & Safety Officer for NECO. 9/20/77 W.H. Button Acknowledges receipt of ltrs lEC0) Kitty)Dragonette (NRC informing of Richard A. Schoenig & Andrew J. Armbrust's appointments

                                                   & incorporation of ltrs in Docket
                                         ,         No. 27-39.

9/20/77 Files Kitty Dragonette Minutes of 8/19/77 mtg w/NRC & NEC0, (NRC) re: 8/5/77 amendment application for Trench 15. 9/28/77 M.J. Bell W.H. Button Informs NRC that Rick A. Schoenig & (3598) (NRC) (NECO) Andy Armbrust have completed radiological control personnel training & gives authorization to both to conduct all aspects of radiological control training. 11/01/77 W.P. Bishop T.S. Baer Transmits copies of additional data (NRC) (NECO) as part of 8/5/77 application to k amend Lic. No. 13-10042-01 as requested by NRC at 8/19/77 mtg. 11/16/77 James N. Neel M.J. Bell Per request by NECO Attorney, ltr (NECO) (NRC) states position of NRC, in relation to operating license at Sheffield, same as ltr dtd 8/22/68 from NRC (license will not expire until final action by NRC, ltr attached). 11/21/77 L.G. Hulman/ M.J. Bell Ltr transmits copies of ltrs dtd J. Carl Stepp (NRC) 11/01/77 & 9/07/77 and asks that (NRC) review of 8/5/77 amendment applica-tion be completed by 12/09/77. 11/25/77 Chase Stephens M.J. Bell Memo transmits FEDERAL REGISTER (NRC) (NRC) Notice entitled, " Notice of Availa-bility of Applicant's Environmental Report; Notice of Consideration of Proposed Expansion of Sheffield, Illinois Low-Level Waste Burial Site; and Notice of Opportunity for Hearing, for transmittal to FEDERAL REGISTER for publication by 12/05/77.

A Sheffield Chronology Page 4 DATE TO FROM SUBJECT

11/25/77 James N. Neel M.J. Bell Notifies transmittal of FEDERAL
(NECO) (NRC) REGISTER Notice for publication and forwards copy of Notice.

11/25/77 James A. Blackburn M.J. Bell Notifies transmittal of FEDERAL (Ill . Dept. of (NRC) REGISTER Notice for publication and Public Health) forwards copy of Notice. 11/28/77 Kitty Dragonette James A.,Blackburn Acknowledges receipt of Environ-(NRC) (Ill. DPH) mental Report & SAR on Sheffield renewal application. 11/29/77 Bill Grant Kitty Dragonette Forwards copy of FEDERAL REGISTER (NRC: Ro. 3) (NRC) Notice (42 FR 61522,12/5/77). 11/29/77 Ron Paul Kitty Dragonette Forwards copy of FEDERAL REGISTER (NRC: Ro. 3) (NRC) Notice (42 FR 61522,12/5/77). 11/29/77 Jan Strasma Kitty Dragonette Forwards copy of FEDERAL REGISTER (NRC: Ro. 3) (NRC) Notice (42 FR 61522,12/5/77). 11/29/77 Russell P. Moore Kitty Dragonette Forwards copy of FEDERAL REGISTER O (NECO) (NRC) Notice (42 FR 61522,12/5/77). 11/30/77 Distribution List M.J. Bell Ltr forwarding copy of ER & FEDERAL (NRC) REGISTER Notice (42 FR 61522,12/5/77)^ 11/30/77 Bruce Intersall Taube L. Postal Forwards copy of FEDERAL REGISTER (Chicago Sun- (NRC) Notice and states Notice should Times) appear in Register by 12/05/77. 11/30/77 Jona Souder Taube L. Postal Forwards License Renewal Application (NRC) (NRC) on Sheffield to Local PDR, for submittal to Moline Public Library for local public viewing. 11/30/77 Files Taube L. Postal Memo notes license renewal applica-(NRC) tion hand-carried to Bob Tracy, Accessions Branch, for submittal to H-St. PDR. 11/30/77 Charles F. Eason Kitty Dragonette Forwards copy of FEDERAL REGISTER (NECO) (NRC) Notice and letter dtd 11/30/77 from M. J. Bell w/ distribution list. O y .-__y --,w- -- , , , ,- _. - - - - -

Sheffield Chronology Page 5 DATE g FROM SUBJECT 11/30/77 Hon. Wm. J. Scott M.J. Bell Forwards copy of FEDERAL REGISTER (Attorney Gen.- (NRC) Notice and states notice should Illinois) - appear in Register by 12/05/77. 12/05/77 Stephen F. Eilperin James N. Neel Information copy requesting exemption (91669) (Solicitor-NRC) (NECO) to ER & EIS requirement for the disposal of low-level radioactive waste in Trench 15. 12/09/77 James N. Neel M.J. Bell Re: amendment application dtd 8/5/77. (NECO) (NRC) In regard to 12/5/77 ltr to Eilperin, need additional info in order to determine if exemption to ER & EIS requirement is applicable. 12/14/77 Sheldon Trubatch Taube L. Postal Forwarding copies of 8/5/77 amendment (NRC-0GC) (NRC) application and 12/29/76 license renewal application and supp M ng documents, per his request. 12/15/77 James Blackburn M.J. Bell Forwards copy of 12/09/77 ltr to (Ill. DPH) (NRC) Neel, for his information. 12/15/77 M.J. Bell L.G. Hulman re: 8/5/77 amendment application. (NRC) (NRC) Hydrologic Engineering questions on NECO application for Trench 15 at Sheffield. 12/16/77 M.J. Bell J. Carl Stepp Geology, Seismology & Geotechnical (NRC) (NRC) Engineering review of trench 15 application at Sheffield. 12/16/77 ACPE M.J. Bell Notifies and forwards copy of 12/5/77 (NRC) FEDERAL. REGISTER Notice (42 FR 61522). 12/16/77 James N. Neel M.J. Bell Requests remaining additional info (NECO) (NRC) needed on review of Trench 15 appli-- cation dated 8/5/77. 12/19/77 M.J. Bell James D. Thomas Notifies of mtg w/NRC & NECO on (NRC) (NRC) 12/19/77 to discuss NRC questions (sent to NECO in 1trs dtd 12/9&l6/77) on Trench 15. 12/22/77 Files M.J. Bell Trip report on site visit to Sheffield (NRC) low-level waste disposal site. O

                             . . _ - _ . .- -         . ~ . - _

Sheffield Chronology Page 6 O (~/ FROM SUBJECT DATE TO 12/23/77 Attendees James Thomas Minutes of 12/19/77 mtg w/NEC0 & NRC (NRC) on 8/5/77 amendment application for additional trenches at Sheffield. 12/23/77 James Blackburn M.J. Bell Ltr requests Blackburn's review and (Ill. DPH) (NRC) co'ments on " exemption approach for licensing Trench 15", needed by 1/6/78. 12/27/77 Ron Paul Kitty Dfagonette Forwards copy of application leading to Amendment 11 on Sheffield license. (NRC-Ro. 3) (NRC) 12/27/77 Ron Paul Kitty Dragonette Forwards copy of proposed changes (NRC-Ro. 3) (NRC) to procedures as authorized in Amendment 11. 12/29/76 Stephen Eilperin Taube L. Postal Forwards copy of 12/23/77 ltr to (NRC) (NRC) Blackburn and enclosures. 12/30/76 Chase Stephens Kitty Dragonette Forwards FEDERAL REGISTER Notice (NRC) (NRC) erstitled, " Notice of Receipt of Application for License Amendment

    ~4                                                              and Request for Exemption; Notice (d

of Opportunity for Public Comment," for transmittal to FEDERAL REGISTER for publication. RE: 8/5/77 amendment application for Trench 15. (43 FR 1160, January 6,1978) O ,

                                                                  ^

l CHRONOLOGY - NECO - SHEFFIELD, ILLIN0IS SITE FROM SUBJECT DATE TO James N. Cahan Kitty Dragonette Forwards application for Sheffield 1/03/78 12/29/76 license renewal & expansion (Asst. Att. Gen. (NRC) and supporting documents. Illinois) Files Paul H. Lohaus Documents that 'l copy of Sheffield 1/03/78 ER was given to Kay Clayton of (NRC) Isham, Lincoln & Beale. Kitty Dragonette Forwards copy of FEDERAL REGISTER 1/03/78 Distribution List Notice (43 FR 1160, Jan. 6,1978). (NRC) Heyward Shealey Kitty Dragonette Forwards copies of 1/6/78 and 1/03/78 (S.C. Dept. of (NRC) 12/5/77 FEDERAL REGISTER Notices Health & Env. and asks for his coments on Control) exemption for Trench 15. James A. Blackburn Kitty Dragonette Forwards copy of FEDERAL REGISTER 1/03/78 Notice (43 FR 1160, Jan. 6,1978). (Ill. DPH) (NRC) Kitty Dragonette Forwards copy of FEDERAL REGISTER 1/03/78 Hon. Wm. J. Scott Notice (43 FR 1160, Jan. 6,1978). {} 1/03/78 (Att. Gen. Ill .) James Cahan (NRC) Kitty Dragonette Forwards copy of FEDERAL REGISTER Notice (43 FR 1160, Jan. 6,1978) (Asst. Att. Gen. (NRC) Ill.) James Neel Kitty Dragonette Forwards copy of FEDERAL REGISTER I 1/03/78 Notice (43 FR 1160, Jan. 6, 1978). (NECO) (NRC) Charles Eason Kitty Dragonette Forwards copy of FEDERAL REGISTER 1/03/78 Notice (d3 FR 1160, Jan. 6,1978). (NECO) (NRC) Michael Berman,Esq. Kitty Dragonette Forwards copy of FEDERAL REGISTER 1/03/78 Notice (43 FR 1160, Jan. 6,1978). (CBE) (NRC) 1/11/78 Gerry Lonergan Kitty Dragonette Forwards copy of info being sent i (NRC-Ro. 3) (NRC) to PDR's on Trench 15. Nick Hampton Kitty Dragonette Forwards copy of 12/29/76 license 1/11/78 renewal application and supporting (ASLB-NRC) (NRC) documents for ASL Board. l I Jona Souder Taube L. Postal Forwards 8/5/77 amendment applicati 1/11/78 and supporting documents and corret (NRC) (NRC) pondence for transmittal to Moline Public Library. . ;,. 1 L ,

() Sheffield Chronology Page 2 DATE T0, FROM SUBJECT 1/11/78 Robert Tracy Taube L. Postal Forwards 8/5/77 amendment application (NRC) (NRC) and supporting documents and corres-pondence for transmittal to H-Street PDR. 1/11/78 M.J. Bell T.S. Baer Transmits copies of NEC0 partial (0171) (NRC) (NECO) response to questions in NRC letter to NECO dtd 12/9/77, Trench 15. 1/16/78 Files Taube L. : Postal Memo documents transmittal of (NRC) 1/11/78 response from NEC0 for incorporation into Moline Public Library & H-Street PDR. 1/16/78 Distribution List Jim Thomas Sends 1/11/78 response from NECO (NRC) to technical offices for review. 1/17/78 James A. Blackburn Kitty Dragonette Forwards 1/11/78 response from NECO (Ill. DPH) (NRC) for info and review. 1/17/78 S. Eilperin Kitty Dragonette Forwards info copy of 1/11/78 O (nac) (nac) resPoase fro neco-1/17/78 C.V. Smith / Paul H. Lohaus Forwards requested background S. Meyers (NRC) (NRC) material on Sheffield facility. 1/18/78 M.J. Bell T.S. Baer Transmits copies of NEC0's remaining (NRC) (NECO) responses to questions in December 9 and 16,1977 letters from NRC, Trench 15. 1/19/78 James Cahan Kitty Dragonette Forwards 8/5/77 amendment application (Asst. Att. Gen. (NRC) and related documents as requested, Illinois) also forwards letter response dtd 1/11/78 from NECO. 1/26/78 James Cahan Kitty Dragonette Forwards info copy of 1/18/78 ltr (Asst. Att. Gen. (NRC) response from NECO. Illinois) 1/26/78 James Blackburn Kitty Dragonette Forwards 1/18/78 ltr response from (Ill. DPH) (NRC) NEC0 for info and review. 1/26/78 Robert Tracy Taube L. Postal Forwards additional data on Trench 15 (NRC) (NRC) for incorporation into 0/5/77 amend-ment application file at H-St. PDR.

[ (] Sheffield Chronology SUBJECT Page 3 DATE T0_ FROM 1/26/78 Jona Souder Taube L. Postal Forwards additional data on Trench (NRC) (NRC) 15 for incorporation into 8/5/77 amendment application file at H-Street Public Document Room. 1/26/78 Bivins, Heller, Kitty Dragonette Forwards 1/18/78 letter response Turi, Wastler (NRC) from NEC0 for review by technical (NRC) , offices. 1/26/78 S. Eilperin ~ Kitty Dragonette Forwards information copy of 1/18/78 (NRC) (NRC) letter response from NECO. 1/26/78 Eugenia Pleasant Taube L. Postal Forwards copy of Amendment 11 to (NRC) (NRC) Lic. No.13-10042-01 for placement in H-Street PDR Docket File 27-39. 1/27/78 J. Carl Stepp/ Michael J. Bell Requests review and comments of Lewis Hulman (NRC) amendment application dated 8/5/77 (NRC) and supplemental responses 1/11 and 1/18/78 be provided by 2/13/78. (] 1/30/78 M. J. Bell (NRC) James Thomas (NRC) Supplies data results of recent tritium tests at Sheffield facility. 1/31/78 Robert Tracy Taube L. Postal Forwards additional correspondence (NRC) (NRC) on 12/29/76 renewal application for transmittal to H-Street PDR. 1/31/78 Jona Souder Taube L. Postal Forwards additional correspondence l (NRC) (NRC) on 12/29/76 renewal application for j transm.ittal to Moline Public Library. 1/31/78 James Neel Kitty Dragonette Forwards copies of comments received (NECO) (NRC) from Federal Agencies on Sheffield ER. 1/31/78 Bivins, Heller, Kitty Dragonette Forwards copies of coments received Turi, Wastler (NRC) from Federal Agencies on Sheffield ER. (NRC) 1/31/78 Distribution List Kitty Dragonette Forwards information copy of letter (NRC) from Paul Q. Peterson, Ill. Dept. of Public Health, to James Neel, NEC0, dated 1/27/78, which states IDPH's comments on review of information submitted in support of Trench 15 application. O

, RAMiB ir A/B 2-. 3 Page 4 chm Sc Sheffield Chronology g. DATE p FROM SUBJECT 2/02/78 Robert Fonner Kitty Dragonette Forwards information copy of public (NRC) (NRC) comments received on Trench 15. 2/06/78 W. P. Bishop T. S. Baer Forwards copies of data on (0620) (NRC) (NECO) permeability tests on the bottom of Trench 15. 2/07/78 Lew Meyers Paul H. Lohaus Forwards copy of 8/5/// amendment (EPA) (NRC) application and supporting documents. 2/09/78 M. J. Bell James Thomas Informs of NRC/NEC0 meeting on (NRC) (NRC) February 13,1978, re: to discuss staff's position on question 11 transmitted to NECO in 12/16/77 letter from NRC. 2/09/78 Michael J. Bell James N.Cahan Requests that Attorney General's (NRC) (Asst. Att. Office be infomed as soon as Gen. Illinois) possible when NEC0 has filled Trench 14A to capacity and can no longer use it for burial of nuclear wastes. o 2/09/78 James Cahan Kitty Dragonette Forwards copy of all FEDERAL REGISTER V (Asst. Att. (NRC) Notices and citation Nos. on Gen. Illinois) activities at Sheffield site per his request. 2/10/78 Files James Thomas Minutes of 1/04/78 meeting on (NRC) Sheffield facility w/NRC, NEC0, USGS, ISGS, IDPH. 2/14/78 Robert Tracy Taube L. Postal Forwards correspondence on 12/29/76 (NRC) (NRC) renewal application & 8/5/77 amend-ment application for transmittal to H-Street PDR. 2/14/78 Jona Souder Taut'e L. Postal Forwards correspondence on 12/29/76 (NRC) (NRC) renewal application and 8/5/77 amend-ment application for transmittal to Moline Public Library. 2/17/78 Wayne Kerr Kitty Dragonette Forwards 2 copies of Sheffield ER (NRC) (NRC) per his request. 2/21/78 James Cahan Kitty Dragonette Forwards copy of letter to Bishop, (Asst. Att. (NRC) from Baer, dated 2/6/78 for info. Gen. Illinois) O

Sheffield Chronology Page 5 m () DATE 0 FROM SUBJECT 2/21/78 James Blackburn Kitty Dragonette Forwards copy of 2/06/78 letter (IDPH) (NRC) from NECO to NRC for his review. 2/21/78 E. Silberstein/ Kitty Dragonette Forwards copy of 2/06/78 letter S. Eilperin (NRC) from NECO to NRC for information. (NRC) 2/21/78 Bivins, Heller, Kitty Dragonette Forwards copy of 2/06/78 letter Turi, Wastler (NRC) from NECO to NRC for technical (NRC) office aview. 2/21/78 Harold R. Denton Sheldon Meyers Memo requesting technical assistance (NRC) (NRC) in Sheffield licensing review of 8/5/77 amendment application for Trench 15 and 12/29/76 renewal / expansion application. 2/21/78 M.J. Bell, James N. Cahan Requests Attorney General's Office E. Silberstein, (Asst. Att. Gen. be informed of when a decision will General Counsel Illinois) be made as to whether there will be (NRC) a formal proceeding on Trench 15 and asks NRC's position on interim on-site storage at Sheffield site. 2/22/78 M. J. Bell L.G. Hulman Hydrologic Engineering review of (NRC) (NRC) NECO Application for Trench 15 at Sheffield, Illinois facility.

    ~

2/22/78 M.J. Bell T.S. Baer Forwards changes to NEC0 responses (0832) (NRC) (NECO) dated November 1,1977 and January 11, 1978 on Trench 15. 2/27/78 Charles Eason Kitty Dragonette Forwards information copy of letter (NECO) (NRC) dated February 9, 1978 from J. Cahan, Asst. Att. Gen. Illinois. 2/27/78 M.J. Bell T.S. Baer Letter fomards supplemental responsei (0881) (NRC) (NECO) to NRC letter to NEC0 date 12/16/77, on proposed experimental field pgm. 2/28/78 James N. Cahan Kitty Dragonette forwards letter dtd 2/22/78 from NECO (Ill. Asst. Att. (NRC) on changes to NEC0 responses dtd General) 11/1/77 and 1/11/78, Trench 15. 2/28/78 James Blackburn Kitty Dragonette Forwards letter dtd 2/22/78 from (IDPH) (NRC) NECO on changes to NEC0 responses dtd 11/1/77 and 1/11/78, Trench 15, for his review.

l. Sheffield Chronology Page 6 TO FROM SUBJECT DATE 2/28/78 Bivins, Heller, Forwards letter dated 2/22/78 from Turi, Wastler Kitty)Dragonette (NRC Baer to Bell for information and (NRC) technical review. 2/28/78 E. Silberstein/ Kitty Dragonette Forwards letter dated 2/22/78 from S. Eilperin (NRC) Baer to Bell for information. (NRC) 3/01/78 Bivins, Heller, Kitty S. Dragonette Forwards 2/27/78 letter from Turi, Wastler (NRC) NECO on proposed experimental field (NRC) program for technical review.

                . Jona Souder                     Taube L. Postal           Forwards correspondence on 8/5/77 3/02/78                                                               amendment application for transmittal (NRC)                      (NRC) to Moline Public Library.

Robert Tracy Taube L. Postal Forwards correspondence on 8/5/77 3/02/78 amendment application for transmittal (NRC) (NRC) to H-Street PDR. M. J. Bell J. D. Thomas Minutes of 2/13/78 meeting with 3/02/78 (NRC) (NRC) NEC0 and NRC on Trench 15 amendment application. 3/06/78 E. Silberstein/ Kitty Dragonette Forwards 2/27/78 letter from NECO S. Eilperin (NRC) on proposed experimental field pgm. (NRC) 3/08/78 James Cahan Kitty Dragonette Forwards 2/27/78 letter from NECO (Ill. Asst. (NRC) on proposed experimental field pgm. Att. Gen.) 3/08/78 James Blackburn Kitty Dragonette Forwards 2/27/78 letter from NECO (IDPH) (NRC) on proposed experimental field pgm. 3/09/78 M. J. Bell J. C. Stepp Geological and Seismological review (NRC) (NRC) and comments of Trench 15 amendment application. James Cahan Kitty Dragonette Forwards minutes of 2/13/78 meeting 3/10/78 (Ill. Asst. (NRC) with NRC and NECO on Trench 15 for Att. Gen.) infermation. 3/10/78 S. Eilperin Kitty Dragonette Fontards minutes of 2/13/78 meeting (NRC) (NRC) with NRC and NECO on Trench 15 for information. , O

                   , , -         -   -    - - - ,              n   - -- ~-_        ,          ,- - , -        , - - - - - -

t Sheffield Chronology Page 7 DATE g FROM SUBJECT 3/10/78 Dr. Smith Murphy Kitty Dragonette Forwards minutes of February 13, 1978 (Battelle) (NRC) meeting with NRC and NECO on Trench 15, for information. - 3/10/78 Robert Morse Kitty Dragonette Forwards minutes of 2/13/78 meeting (Intervenor/ (NRC) with NRC and NECO on Trench 15, per Renewal case) his request. 3/13/78 Terry Conway Kitty Dragonette Forwards minutes of 2/13/78 meeting (NUSCorp.) (NRC) with NRC and NECO on Trench 15, for information. 3/14/78 Jona Souder Taube L. Postal Forwards correspondence on 8/05/77 (NRC) (NRC) amendment application for transmittal to Moline Public Library. 3/14/78 Robert Tracy Taube L. Postal Forwards correspondence on 8/05/77 (NRC) (NRC) amendment application for transmittal to H-Street PDR. 3/15/78 James N. Neel M. J. Bell Expresses NRC concerns regarding (NECO) (NRC) experimental field pgm; requests no radioactive wastes be buried in Trenct Os 15 until pgm results are submitted to and reviewed by NRC; and asks NECO's plans for interim on-site storage of wastes. 3/15/78 James N. Neel M. J. Bell Requests additional information on (NEC0) (NRC) Trench 15 which are required to continue review of application. 3/17/78 Files Kitty Dragonette Telecon with Charles Eason, Sr. (NRC) re: 3/15/78 ltr to Neel on NRC position on burial of rad. wastes in Trench 15. ! 3/17/78 Robert Norse Kitty Dragonette Forwards letters dated 3/15/78 to (Intervenor) (NRCl Neel for information. 3/17/78 Terry Conway Kitty Dragonette Forwards letters dated 3/15/78 to j (NUSCorp.) (NRC) Neel for information. 3/17/78 James Cahan Kitty Dragonette Forwards letters dated 3/15/78 to (Ill. Asst. Att. (NRC) Neel for information. General) O l s - - - - - -

< Sheffield Chronology Page 8 DATE T0, FROM SUBJECT 3/17/78 James Blackburn Forwards 3/15/78 letters to Neel (IDPH) Kitty)Dragonette (NRC for information and review. James Neel Kitty Dragonette Forwards letters dated February 9 3/20/78 and 21, 1978 from James Cahan, (NECO) (NRC) Illinois Asst. Att. General, for information and action. 3/20/78 Charles Eason Taube L. Postal Confirms telecon of 3/15/78. NECO (NECO) (NRC)

                                                                               will send copies of correspondence they originate to service list and send NRC copy of service list sent.

3/20/78 James Cahan Kitty Dragonette Forwards letter dated 3/20/78 to (Ill . Asst. Att. (NRC) Neel, for information. General) 3/20/78 James Blackburn Kitty Dragonette Forwards letter dated 3/20/78 to (NRC) Neel, for information. (IDPH) 3/21/78 Bivins, Heller, Kitty Dragonette Forwards NUS Corporation's, Task i Turi, Wastler (NRC) Report for Sheffield EIS, for infor-(NRC) mation and comment. 3/23/78 Charles F. Eason Taube L. Postal Forwards Service List on Sheffield (NECO) (NRC) lt. gal proceedings per his request. 3/24/78 M. J. Bell Charles F. Eason Comments on minutes of 2/13/78 (1247) (NRC) (NECO) meeting with NRC and NECO. 3/28/78 Docketing Section NRC) (& Service (NRC)Kitty S. Dragonette Forwards dated 3/27/78, FEDERAL entitled, REG "hatice of Opportunity for Hearing," for trans-mittal to the Office of the FEDERAL REGISTER for publication.(V3 ft /, 3/28/78 Chase Stephens Kitty Dragonette Requests FEDERAL REGISTER Notice (NRC) (NRC) dated 3/27/78 be published by 4/07/78' 3/28/78 Clare Miles Taube L. Postal Forwards copy of FEDERAL REGISTER (NRC) (NRC) Notice dated 3/27/78 for information, for use in drafting public announce-ment notifying public of opportunity for hearing. lO

                                                                           .-_ _      L.___    _ . _ _ _ . . . _ __ _ . . _ __

i Sheffield Chronology Page 9 DATE p FROM SUBJECT James N. Neel Kitty Dragonette Forwards copy of FEDERAL REGISTER 3/28/78 (NECO) (NRC) Notice dated 3/27/78. James Blackburn Kitty Dragonette Forwards copy of FEDERAL REGISTER 3/23/78 (IDPH) (NRC) Notice dated 3/27/78. 2 3/29/78 M. J Bell T. S. Baer Replies to letter dated 3/15/78 (NECO) to Neel from Bell, stating plans for (1355) (NRC) interim on-site storage once Trench 14A is filled. 3/30/78 M. J. Bell T. S. Baer Letter advises of omission in letter (1354) (NRC) (NECO) dated 3/29/78 and fomards letter dated 3/30/78 (attached) with cor-rection. 3/31/78 S. Eilperin Kitty Dragonette Forwards FEDERAL REGISTER Notice (NRC) (NRC) dated 3/27/78 for infonnation. 3/31/78 Terry W. Conway Kitty Dragonette Forwards FEDERAL REGISTER Notice (NUS Corp.) (NRC) dated 3/27/78 for information. 3/31/78 Distribution List Kitty Dragonette Forwards letter dated 3/24/78 from _) (NRC) NEC0 for information. 3/ 31/78 James Blackburn Kitty Dragonette Forwards letter dated 3/24/78 from (IDP3) (NRC) NEC0 for information. 3/31/78 Robert Morse Kitty Dragonette Forwards letter dated 3/24/78 from (Intervenor) (NRC) NECO for information. 3/31/78 Terry W. Conway Kitty Dragonette Fomards letter dated 3/24/78 from (NUSCorp.) (NRC) NECO for information. 3/31/78 Robert Tracy Taube L. Postal Transmits correspondence on Trench 15 (NRC) (NRC) application to H-Street PDR. 3/31/78 Jona Souder Taube L. Postal Transmits correspondence on Trench 15 (NRC) (NRC) application to Moline Public Library. 3/31/78 Kitty Dragonette David D. Ed Forwards 2 amendments to lease for (NRC) (IDPH) NEC0's Sheffield, Illinois facility. 4/04/78 S. Trubatch Forwards requested items regarding (NRC) Ki(NRC tty)Dragonette Sheffield, Illinois facility. O

                                                  ---,-.s           --

Sheffield Chronology Page 10 (] DATE 0 FROM SUBJECT States corrections to March 2,1978 4/04/78 M. J. Bell James D. Thomas (NRC) (NRC) memorandum concerning 2/13/78 meeting minutes. 4/04/78 James N. Neel Kitty S. Dragonette Requests additional information (NECO) (NRC) concerning applications for renewal / expansion and Trench 15. 4/05/78 James Cahan Kitty Dragonette Forwards letter dated 4/4/78 to Neel, (Ill. Asst. Att. (NRC) , and memorandum dated 4/4/78 to Bell, General) for information. 4/05/78 James Blackburn Kitty Dragonette Forwards letter dated 3/30/78 to Bell; (IDPH) (NRC) letter dated 4/4/78 to Neel; and memo dated 4/4/78 to Bell, for information.

                                                                                    ~

4/05/78 Terry Conway Kitty Dragonette Forwards letter dated 3/30/78 to Bell;- (NUSCorp.) (NRC) letter dated 4/4/78 to Neel; and memo dated 4/4/78 to Bell, for information. 4/05/78 Robert Mcrse Kitty Dragonette Forwards letter dated 3/30/78 to Bell; (Intervenor) (NRC) letter dated 4/4/78 to Neel; and memo dated 4/4/78 to Bell, for information. 4/05/78 Bivins, Heller, Kitty Dragonette Forwards letter dated 3/30/78 to Bell Turi, Wastler, (NRC) on NEC0's plans for interim on-site S. Eilperin (NRC) storage of radioactive wastes for information. 4/05/78 M. Weinstein (NRC)/ Kitty. Wagonette Forwards letter dated 3/30/78 to Bell; Dr. Smith Murphy (NR(,7 letter dated 4/4/78 to Neel; and memo (Battelle) dated 4/4/78 to Bell, for information. 4/05/78 Sheldon Trubatch Kitty Dragonette Forwards letter dated 3/31/78 from (NRC) (NRC) D. Ed., which forwards 2 amendments to NEC0's lease for Sheffield, Ill. O

CHRON0 LOGY - NEC0 - SHEFFIELD, ILLIN0IS SITE O DA1E 10 FROM- SuBaeCT 4/12/78 Michael J. Bell L. G. Hulman Ground-water levels in piezometers (NRC) (NRC) adjacent to Trench 18. 4/14/78 Jim Blackburn Kitty Dragonette Forwards enclosures to letter dated (IDPH) (NRC) 4/04/78 to NEC0 from NRC. 4/17/78 Robert Tracy Taube L. Postal Forwards correspondence for 8/05/77 (NRC) (NRC) amendment application for transmittal to H-Street PDR. 4/17/78 Jona Souder Taube L." Postal Forwards correspondence for 8/5/77 (NRC) (NRC) amendment application for transmittal to Moline Public Library. 4/17/78 Jona Souder Taube L. Postal Forwards correspondence for 12/29/76 (NRC) (NRC) renewal / expansion application for transmittal to Moline Public Library. 4/17/78 Robert Tracy Taube L. Postal Forwards correspondence for 12/29/76 (NRC) (NRC) renewal / expansion application for transmittal to H-Street PDR. i 4/17/78 Leo B. Higginbotham Wm. P. Bishop Requests IE Region III Personnel O (I&E-NRC) (NRC) investigate the water level at the bottom of Trench 18 and provide an assessment of available infonnation. 4/19/78 Bivins, Heller, James D. Thomas Forwards correspondence on NUS Turi, Wastler, (NRC) Corporation's (contractor for Bell (NRC) Sheffield EIS) EIS review. 4/19/78 Michael J. Bell T. S. Baer Withdraws amendment application for (NRC) (NECO) use of Trench 15. 4/20/78 James N. Neel Michael J. Bell Requests additional information on (NECO) (NRC) renewal / expansion application. 4/25/78 Dr. Smith Murphy Kitty Dragonette Forwards 4/19/78 letter from NEC0 to (Battelle) (NRC) NRC and 4/20/78 letter from NRC to NEC0, for information. 4/25/78 James Blackburn Kitty Dragonette Forwards 4/19/78 letter from NECO to (IDPH) (NRC) NRC and 4/20/78 letter from NRC to NEC0, for information. I 4/25/78 James N. Cahan Kitty Dragonette Forwards 4/19/78 letter from NECO to (Illinois Asst. (NRC) NRC and 4/20/78 letter from NRC to Attorney General) NECO, for information. 4/25/78 Terry W. Conway Kitty Dragonette Forwards 4/19/78 letter from NECO to (NU3 Corp.) (NRC) NRC and 4/20/78 letter from NRC to NEC0, for information.

               . -                         - - -__ L . . ..- .                              .

i Sheffield Chronology Page 2 TO FROM SUBJECT DATE 4/25/78 Robert Norse Kitty Dragonette Forwards 4/19/78 letter from NECO to (Intervenor) (NRC) NRC and 4/20/78 letter from NRC to NECO, for information. 4/25/78 Honorable James R. Clifford V. Smith Asks if State of Illinois intends to Thompson (NRC) take title to additional 168 acres at (Illinois Governor) Sheffield in the event NRC finds the site suitable for low-level waste disposal. Bivins, Heller, Kitty Dragonette Forwards USGS proposal dated 4/17/78 4/26/78 Turi, Wastler (NRC) for a horizontal hole to be drilled (NRC) beneath a portion of Sheffield site. (actual proposal filed in misc. side) Docketing & Service Kitty Dragonette Forwards Federal Register Notice en-4/27/78 titled, " Withdrawal of Application," Section, NRC (NRC) for transmittal to the Office of the Federal Register for publication. (Trench 15) 4/27/78 Chase Stephens Kitty Dragonette Requests Federal Register Notice (NRC) announcing withdrawal of Trench 15 O (NRC) application be published in Federal Register on May 1,1978.. James Blackburn Kitty Dragonstte Forwards Federal Register Notice 4/27/78 (IDPH) (NRC) announcing withdrawal of Trench 15 application, for information. James N. Neel Kitty Dragonette Forwards Federal Register Notice 4/27/78 (NECO) (NRC) announcing withdrawal of Trench 15 application, for information. . 4/27/78 James N. Cahan Kitty Dragonette Forwards Federal Register Notice (Ill . Asst. Att. (NRC) announcing withdrawal of Trench 15 General) application, for information. Terry W. Conway Kitty Dragonette Forwards Federal Register Notice 4/27/78 (NUSCorp.) (NRC) announcing withdrawal of Trench 15 application, for information. Dr. Smith Murphy Kitty Dragonette Forwards Federal Register Notice 4/27/78 (Battelle) (NRC) announcing withdrawal of Trench 15 application, for information. O i i .

Sheffield Chronology Page 3 O V SUBJECT DATE TO FROM_ Robert Morse Kitty Dragonette Forwards Federal Register Notice 4/27/78 announcing withdrawal of Trench 15 (Intervenor) (NRC) application, for information. Taube L. Postal Forwards Federal Register _ Notice 4/28/78 Clare Miles (NRC) (NRC) announcing withdrawal of Trench 15 application, for use in drafting press release. 5/04/78 James N. Neel Michael'J. Bell Requests schedule for supplying addi-(NECO) (NRC) tional information by 5/09/78 and submission of amended application for development of 20.45 acres by 5/15/78. 5/04/78 Honorable Adlai E. Lee V. Gossick Responds to attached letter dated Stevenson (NRC) 4/10/78 from Stevenson concerning the (U.S.Sentate) disposal of low-level radioactive waste & the Sheffield site. 5/04/78 M.J. Bell Thomas S. Baer Partial response to letter dated (NRC) (NECO) 4/20/78 to NEC0 from NRC. 5/08/78 M. J. Bell Thomas S. Baer Responds to May 4, 1978 letter to (NECO) NECO from NRC stating schedule for

       -                 (NRC) replying to past requests for addi-tional information.

5/03/78 M. J. Bell William Bivins Hydrologic input to Sheffield EIS. (NRC) (NRC) 5/09/78 Dr. Smith Murphy Kitty Dragonette Forwards 5/04/78 letter to NECO (Battelle) (NRC) from NRC, for information. 5/09/78 Robert Morse Kitty Dragonette Forwards 5/04/78 letter to NECO (Intervenor) (NRC) from NRC, for infonnation. l 5/09/78 Terry W. Conway Kitty Dragonette Forwards 5/04/78 letter to NECO l (NUS Corp.) (NRC) from NRC, for information. 5/09/78 James N. Cahan Kitty Dragonette Forwards 5/04/78 letter to NECO (Ill. Asst. Att. (NRC) from NRC, for information. General) 5/09/78 James Blackburn Kitty Dragonette Forwards 5/04/78 letter to NECO (IDPH) (NRC) from NRC, for information. O v l

                                --,_,__.-r. ,, -~ -     ,-.----m------   yv----, --e  ,,-~. --p--- _ _ . - - --. -- ---------w        -- -
  • Page 4 O

C h ffield Chronology SUBJECT FROM TO DATE Forwards correspondence on 12/29/76 Robert Tracy Taube L. Postal renewal / expansion application for 5/09/78 (NRC) (NRC) transmittal to H-Street PDR. Forwards correspondence on 12/29/76 Taube L. Postal renewal / expansion application for 5/09/78 Jona Souder (NRC) (NRC) transmittal to Moline Public Library. Forwards correspondence on 8/05/77 Robert Tracy Taube L. Postal amendment application for transmittal 5/09/78 (NRC) (NRC) to H-Street PDR. Forwards correspondence on 8/05/77 Taube L. Postal amendment application for transmittal 5/09/78 Jona Souder (NRC) (NRC) to Moline Public Library. Forwards report on results of field Thomas S. Baer investigation conducted during 5/10/78 Michael J. Bell (NRC) (NECO) February and March 1978, Kitty Dragonette Fomards 4/25/78 letter to Gov. Dr. E. Smith Thompson of 111. from NRC; 5/04/78 5/11/78 Murphy (Battelle) (NRC) letter to NRC from NEC0; and 5/04/78 pd letter to Adlai Stevenson from NRC, for information. Kitty Dragonette Forwards 4/25/78 letter to Gov. Thompson of Ill, from NRC; 5/04/78 5/11/78 Terry W. Conway ) (NRC) letter to NRC from NEC0; & 5/04/78 (NUS ",orporation letter to Adlai Stevenson from NRC, for information. Kitty Dragonette Fomards 4/25/78 letter to Gov. Robert Morse Thompson of Ill.from NRC; 5/04/78 5/11/78 (NRC) letter to NRC from NEC0; and 5/04/78 (Intervenor) letter to Adlai Stevenson from NRC. Kitty Dragonette Forwards 4/25/78 letter to Gov. James N. Cahan Thompson of Ill. from NRC; 5/04/78 5/11/78 (NRC) letter to NP.C from NEC0; and 5/04/78 (Ill. Asst. Att. letter to Adlai Stevenson from NRC, General) for information. Kitty Dragonette Forwards 5/1/78 letter to NRC from James Blec6crn NEC0; 5/04/78 letter to Adlai Stevenson 5/11/78 (NRC) from NRC; and 5/03/78 Decision on (IDPH) Appeal by Mid-America by ASLAB.

                 '                                                   ,Q,

_ ~ ~ ^ ~ ~ ~-~---r _ _ _ _ _ _

Sheffield Chronology Page 5 O V DATE TO FROM SUBJECT 5/12/78 William Bivins M. J. Bell Forwards information from NUS Corp. (NRC) (NRC) on the receptor information for underground transport calculations. 5/12/78 Sheffield Service Kitty Dragonette Forwards letter to NEC0 from NUS Corp. List (NRC) which clarifies questions from 4/20/78 letter to NEC0 from NRC. 5/12/78 M. J. Bell T. S. Baer Forwards partial responses to 4/04/78 (NRC) (NECO) and 4/20/78 letters from NRC requestinc additional information. 5/12/78 M. J. Bell T. S. Baer States reasons questioning relevancy (NRC) (NECO) of additional information requested in 3/15/78 letter from NRC to NECO, concerning renewal application review. 5/15/78 Bivins, Heller, Kitty Dragonette Requests techi.ical review of 5/10/78 Turi, Wastler (NkC) letter from NECO to NRC and fomards (NRC) 5/08/78 setter from NECO to NRC for infomation. s 5/15/78 S. Eilperin Kitty Dragonette Fomsrds 5/04/78 letter to NRC from v (NRC) (NRC) NEC0; 5/08/78 letter to NRC from NEC0; and 5/10/78 letter to NRC from NEC0 for information. 5/15/78 Terry W. Conway Kitty Dragonette Forwards letters dated 5/18/78 and (NUS Corp.) (NRC) 5/10/78 from NECO to NRC and memo dated 5/12/78 to Sheffield Service List for information. 5/15/78 James Blackburn Kitty Dragonette Forwards letters dated 5/08/78 and (IDPH) (NRC) 5/10/78 from NECO to NRC and memo dated 5/12/78 to Sheffield Service ! List for information. 5/15/78 James N. Cahan Kitty Dragonette Forwards letters dated 5/18/78 and (Ill . Asst. Att. (NRC) 5/10/78 from NECO to NRC and memo General) dated 5/12/78 to Sheffield Service List for infomation. 5/15/78 Robert Morse Kitty Dragonette Forwards letters dated 5/08/78 and (Intervenor) (NRC) 5/10/78 from NECO to NRC and memo dated 5/12/78 to Sheffield Service List for information. O

d _. 1 l i I Sheffield Chronology Page 6 o b DATE T0, . FROM SUBJECT 5/15/78 Dr. Smith Murphy Kitty Dragonette Forwards letter dated 5/08/78 and 5/10/78 from NECO to NRC and memo dated 5/12/78 to Sheffield Service List for information. 5/18/78 T. Essig, R0. 3, Kitty Dragonette Fonsa* letter dated 5/12/78 to NRC M. Weinstein, (NRC) fron nic0, with partial responses to S. Eilperin (NRC) 4/4/78 & 4/20/78 letters from NRC requesting additional information. 5/18/78 Bivins, Heller, Kitty Dragonette Forwards letter dated 5/12/78 to NRC Turi (NRC) (NRC) from NEC0, with partial responses to 4/4/78 & 4/20/78 letters from NRC requesting additional information, for technical review. 5/19/78 James Blackburn Kitty Dragonette Forwards letter dated 5/12/78 to (IDPH) (NRC) Rep. Railsback from NRC and 5/12/78 letter with partial responses to NRC requests for additional informatio 5/19/78 James N. Cahan Kitty Dragonette Forwards letter dateT5/12/78 to Rep. , n (Ill. Asst. Att. (NRC) Railsback from NRC and 5/12/78 letter V General) with partial responses to NRC requests for additional information. 5/19/78 Robert Morse Kitty Dragonette Forwards letter dated 5/12/78 to Rep. (Intervenor) (NP.C) Railsback from NRC and 5/12/78 letter with partial responses to NRC requests for additional infonnation. 5/19/78 Terry W. Conway Kitty Dragonette Forwards letter dated 5/12/78 to Rep. l (NUSCorp.) (NRC) Railsback from NRC and 5/12/78 letter with partial responses to NRC requests for additional infonnation. 5/19/78 Dr. Smith Murphy Kitty Dragonette Forwards letter dated 5/12/78 to Rep. (Battelle) (NRC) Railsback from NRC and 5/12/78 letter with partial responses to NRC requests for additional information. 5/19/78 Jona Souder Taube L. Postal Forwards correspondence regarding (NRC) (NRC) Sheffield site for transmittal to Moline Public Library. 5/19/78 Robert Tracy Taube L. Postal Forwards correspondence regarding (NRC) (NRC) Sheffield site for transmittal to H-Street PDR. O 5/19/78 Michael J. Bell (NRC) James N. Neel Responds to 5/04/78 letter to NECO fre NRC, which requested schedule for (NECO) supplying additional information. 9

                                ,y -

y -,-r.- g . - . , e-- . - - - - -_--__------.---,-----m.-

Sheffield Chronology Page 7 O SUBJECT V DATE TO FROM 5/22/78 William E. Kreger Michael J. Bell Forwards nuclide list requested by (NRC) (NRC) technical staff from NUS Corp. 5/22/78 C.V. Smith, Jr. ' James R. Thompson 'teplies to 4/25/78 letter from NRC (NRC) (GovernorofIll.) concerning State acceptance of addf-tional land at the Sheffield site. 6/01/78 T. Essig, R0. 3, Kitty Dragonette Forwcrds 5/12/78 letter to NRC from M. Weinstein, (NRC) NECO regarding relevancy of addi-S. Eilperin (NRC) tional information requested in 3/15/78 letter from NRC. 6/01/78 Bivins, Heller, Kitty Dragonette Forwards 5/12/78 letter to NRC from Turf , Wastler, (NRC) NEC0 regarding relevancy of addi-Silberstein(NRC) tival information requested in 3/15/78 letter from NRC and 5/23/78 memo from Bell to C. Stepp on the ir terim cuidelines for geotechnical review of SLB sites. 6/05/78 Silberstein, Kitty Dragonette Forwards 5/2?/78 letter from Illinois Eilperin, (NRC) Gov. Thompson to C.V. Smith, Jr., for Weinstein, Essig ir. formation. O sj (NRC) 6/05/78 Bivins, Heller Kitty Dragonette Forwards 5/22/78 letter from Illinois Turi, Wastler (NRC) Go/. Thompson to C.V. Smith, Jr., for (NRC) informa tion. 6/06/78 Dr. E. Smith Kitty Dragonette Forwards 5/12/78 letter to NRC from Murphy (NRC) NECO concerning 3/15/78 request for (Battelle) additional information from NRC and 5/22/73 letter from Gov. Thompson. 6/06/78 Robert Morse Kitty Draionette Forwards 5/12/78 letter to NRC from (Ir.tervenor) (NM) NECO concerning 3/15/78 request for additional information from NRC and 5/22/78 letter from Gov. Thompson. 6/06/78 Terry W. Co sey Kitty Dragonette Forwards 5/12/78 letter to NRC from (NUSCorp.) (NRC) NECO concerning 3/15/78 request for additional information from NRC and 5/22/78 letter from Gov. Thompson. 6/06/78 James N. Cahan Kitty Dragonette Forwards 5/12/78 letter to NRC from (Ill. Asst. Att. (NRC) NECO concerning 3/15/78 request for General) additional information from NRC and 5/22/78 letter from Gov. Thampson.

i . l Sheffield Chronology Page 8 () DATE 1][ FROM SUBJECT 6/06/78 James Blackburn Kitty Dragonette Forwards 5/12/78 letter to NRC from (IDPH) (NRC) NECO concerning 3/15/78 request for additional information from NRC and 5/22/78 letter from Gov. Thompson. 6/06/78 Sheffield Service Kitty Dragonette Forwards 5/22/78 letter to C.V. Smith, list (NRC) NRC, from Illinois Gov. Thompson, for information. 6/07/78 Bi rins, Heller, Kitty Dragonette Forwards correspondence on USGS's Turi (NRC) (NRC) proposal for construction of horizonta . hole at Sheffield. O i i n i l l i l

CHRONOLOGY - NEC0 - SHEFFIELD, ILLIN0IS SITE (q> T0 FROM SUBJECT DATE M. J. Bell K. S. Dragonette Informs of upcoming meeting on 6/16/78 6/08/78 with NEC0, NRC, and NUS to discuss (NRC) (NRC) NECO's responses to staff questions on Sheffield renewal / expansion appl. E. Smith Murphy Kitty Dragonette Forwards 6/08/78 memo announcing , 6/09/78 6/16/78 meeting, for information. (Battelle) (NRC) Robert Morse Kitty Dragonette Forwards 6/08/78 memo announcing 6/09/78 6/16/78 meeting, for information. (Intervenor) (NRC) James N. Cahan Kitty Dragonette Forwards 6/08/78 memo announcing 6/09/78 6/16/78 meeting, for information. (Ill. Asst. Att. (NRC) Gen.) Michael J. Bell T. S. Baer Forwards response to NRC questions 6/12/78 C-2, 3 and 4 dated 3/20/78. (NRC) (NECO) Michael J. Bell Kitty Dragonette Notifies that 6/16/78 meeting with 6/15/78 NRC, NECO and NUS is cancelleo. (NRC) (NRC) O e/ie/7s ' 'C.v. Smita. ar. (NRC) T. S. Beer (NECO) neavests meae9emeat ePPeei meeti=9 to discuss certain staff decisions relating to renewal / expansion appl. for Sheffield. Robert Morse Kitty Dragonette Forwards 6/15/78 memo to Bell, for < 6/16/78 (Intervenor) (NRC) information. E. Sinith Murphy Kitty Dragonette Forwards 6/15/78 memo to Bell, for 6/16/78 (Battelle) (NRC) infonnation. Jona Souder Taube L. Postal Forwards correspondence on Sheffield 6/20/78 (NRC) (NRC) site for t.ransmittal to Moline Public Library. Robert Tracy Taube L. Postal Forwards correspondence on Sheffield 6/20/78 (NRC) (NRC) site for transmittal to H-Street Public Document Room. 6/20/78 Paul Peterson Michael J. Bell Requests information on the radiologi-(IDPH) (NRC) cal monitoring history of Sheffield and on perpetual care and maintenance plans for the site. O

 - -          -     . -      .              - - - .      1            .

Sheffield Chronology Page 2

 ] DATE         T0, Michael J. Bell FROM T. S. Baer SUBJECT Verifies that 5/04/78 letter to Bell 6/20/78 (NRC)                (NEC0)                        from NECO with responses to NRC ques-tions dated 4/20/78, was sent to Sheffield service list.

6/21/78 Distribution List J. D. Thomas Forwards 6/16/78 letter to Smith from (NRC) (NRC) Baer, for information. 6/21/78 T.Essig,S.Eilperin Kitty Dragonette Forwards 6/16/78 letter to Smith from M. Weinstein (NRC) (NRC) Baer, for information. 6/22/78 Michael J. Bell William S. Bivins Status of NRR technical review of (NRC) (NRC) Sheffield renewal / expansion appl. 6/23/78 T. Essig, R0. III, Kitty Dragonette Forwards 6/12/78 letter to Bell from M. Weinstein (NRC) (NRC) Baer, for information. 6/23/78 James Blackburn Kitty Dragonette Fomards letter dated 6/12/78 to Bell (IDPH) (NRC) from Baer and 6/16/78 letter to Smith from Baer, for information. 6/23/78 Dean Hansell/ Kitty Dragonette Forwards letter dated 6/12/78 to Bell Susan Sekuler (NRC) from Baer and 6/16/78 letter to Smith (Ill . Asst. Att. Gen.) from Baer, for information. 6/23/78 Terry Conway Kitty Dragonette Forwards letter dated 6/12/78 to Bell (NUS Corp.) (NRC) from Baer and 6/16/78 letter to Smith from Baer, for information. 6/23/78 Robert Morse Kitty Dragonette Forwards letter dated 6/12/78 to Bell (Intervenor) (NRC) from Baer and 6/16/78 letter to Smith from Baer, for information. 6/23/78 E. Smith Murphy Kitty Dragonette Forwards letter dated 6/12/78 to Bell (Battelle) (NRC) from Baer and 6/16/78 letter to Smith from Baer, for infonnation. 6/27/78 James N. Neel Sheldon Meyers Replies to 6/16/78 letter from NECO (NECO) (NRC) to C.V. Smi th, Jr. , NRC. 6/28/78 James N. Neel Michael J. Bell Forwards corrected copy of 6/27/78 (NECO) (NRC) letter to Neel from Meyers. 6/29/78 Michael J. Bell Thomas S. Baer Forwards partial responses to NRC (NRC) (NECO) questions dated 4/04 and 4/20/78. O

Sheffield Chronology Page 3 O DaTe T0 FROM SUBJECT 7/03/78 Terry W. Conway Kitty Dragonette Forwards 6/29/78 letter to Bell from (NUS Corp.) (NRC) Baer, for information William S. Bivins Kitty Dragonette Forwards NUS letter dated 6/21/78, 7/05/78 which clarifies the pathway locations (NRC) (NRC) transmitted in 5/12/78 memo. 7/05/78 Bivins, Thompson, Kitty Dragonette Fomards 6/29/78 letter to Bell from Turi, Wastler (NRC) (NRC) Baer, for information. 7/05/78 T. Essig, R0. III, Kitty Dragonette Forwards 6/29/78 letter to Bell from Silberstein, (NRC) Baer, for information. Weinstein (NRC) 7/05/78 James Blackburn Kitty Dragonette Forwards 6/29/78 letter to Bell from (IDPH) (NRC) Baer, for information. 7/05/78 Dean Hansell/ Kitty Dragonette Forwards 6/29/78 letter to Bell from Susan Sekuler (NRC) Baer, for information. (Ill . Asst. Attys. Gen.) 7/05/18 Robert Morse Kitty Dragonette Fomards 6/29/78 letter to Bell from (Intervenor) (NRC) Baer, for information. q 7/05/78 E. Smith Murphy Kitty Dragonette Forwards 6/29/78 letter to Bell from (Battelle) (NRC) Baer, for infomation. 7/05/78 Robert Tracy Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) renewal / expansion for transmittal to H-Street Public Document Room. 7/05/78 Jona Souder Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) renewal / expansion for transmittal to Moline Public Library. 7/05/78 William P. Bishop B. T. Reich Informs of Andrew J. Armbrust's promo-(NRC) (NECO) tion to RSO. 7/06/78 James N. Neel Michael J. Bell Forwards questions requesting alternata (NECO) (NRC) siting infomation. l I 7/07/78 James A. Blackburn Kitty Dragonette Forwards 7/06/78 letter to NEC0 from (IDPH) (NRC) NRC requesting alternate siting info. 7/07/78 Terry W. Conway Kitty Dragonette Fomards 7/06/78 letter to NEC0 from (NUS Corp.) (NRC) NRC requestirg alternate siting info. O 1 .

Sheffield Chronology Page 4 DATE TO FROM SUBJECT 7/07/78 Robert Morse Kitty Dragonette Forwards 7/06/78 letter to NEC0 from (Intervenor) (NRC) NRC requesting alternate siting info. 7/07/78 E. Smith Murphy Kitty Dragonette Forwards 7/06/78 letter to NEC0 from (Battelle) (NRC) NRC requesting alternate siting info. 7/07/78 T. Essig, R0. III Kitty Dragonette Forwards 7/06/78 letter to NEC0 from (NRC) (NRC) NRC requesting alternate siting info. 7/12/78 James N. Neel Michael J. Bell Forwards Federal Register Notice, (NECO) (NRC) 43, FR 28058, 6/28/78, for information on NRC policy on meetings with appli-cants. 7/13/78 James A. Blackburn Kitty Dragonette Forwards 7/12/78 letter to NEC0 from (IDPH) (NRC) NRC, for information. 7/13/78 Robert Morse Kitty Dragonette Forwards 7/12/78 letter to NEC0 from (Intervenor) (NRC) NRC, for information. 7/18/78 Sheldon Meyers Thomas S. Baer Clarifies matters which will be dis-(NRC) (NEC0) cussed in management appeal meeting on July 25, 1978. 7/28/78 Robert Tracy Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) site for transmittal to H-Street Public Document Room. 7/28/78 Jona Souder Taube L. Postal Forwards correspondence on Sheffield (NRC (NRC) site for transmittal to Moline Public Library. 7/28/78 Ticie Taylor Michael J. Bell Requests USGS information regarding (USGS) (NRC) boreholes at Sheffield facility. 7/31/78 Michael J. Bell L.G. Hulman Forwards hydrologic engineering ques-(NRC) (NRC) tions on Sheffield facility. 7/31/78 Dr. Jacob Sedlet Kitty Dragonette Requests results of Argonne's radio-(Argonne Nat'l Lab.) (NRC) analyses of Sheffield environmental samples. 8/01/78 Bivins, Thompson, Kitty Dragonette Forwards Geography / Demography section Turi (NRC) (NRC) of Sheffield EIS, for infonnation. 8/01/78 L.G. Hulman Michael J. Bell Requests review and comment on Surface (NRC) (NRC) Hydrology section of Sheffield EIS. O -

Sheffield Chronology Page 5 O DaTE 10 FROM SuBaECT 8/01/78 Charles E. MacDonald Michael J. Bell Requests review and comments on (NRC) (NRC) Transportation Exposures section of Sheffield EIS. 8/01/78 Robert F. Barker Michael J. Bell Requests review and coninents on (NRC) (NRC) Transportation Exposures section of Sheffield EIS. 8/01/78 Daniel R. Muller S. Meyers Requests review and comments on (NRC) (NRC) ,. Geography / Demography section of Sheffield EIS. 8/04/78 Clifford V. Smith, Michael J. Bell Minutes of management appeal meeting Jr. (NRC) (NRC) held on July 25, 1978. 8/07/78 T. Essig, R0. III Kitty Dragonette Forwards correspondence on Sheffield (NRC) (NRC) renewal / expansion application, for information. 8/07/78 Distribution List Kitty Dragonette Forwards correspondence on Sheffield (NRC) (NRC) renewal / expansion application, for information. T. S. Baer Forwards responses to Question 8 of

 ] 8/09/78      Michael J. Bell (NRC)                                                          (NECO)               4/04/78 and Question A6 of 4/20/78 requests for additional information.

8/10/78 E. Smith Murphy Kitty Dragor:ette Forwards management appeal meeting (Battelle) (NRC) minutes dated 8/04/78. 8/10/78 Robert Morse Kitty Dragonette Forwards management appeal meeting (Intervenor) (NRC) minutes dated 8/04/78. 8/10/78 Dean Hansell/ Kitty Dragonette Forwards management appeal meeting Susan Sekuler (NRC) minutes dated 8/04/78. (Ill . Asst. Attys. Gen.) 8/10/78 James Blackburn Kitty Dragonette Forwards correspondence on Sheffield (IDPH) (NRC) renewal / expansion application, for information. 8/10/78 Terry W. Conway Kitty Dragonette Forwards correspondence on Sheffield (NUS Corp.) (NRC) renewal / expansion application for information. 8/15/78 James N. Neel Clifford V. Smith, Clarifies information needed for draft (NECO) Jr. , (NRC) EIS and outlines new schedule for issuance of draft EIS.

Sheffield Chronology Page 6 TO FROM SUBJECT DATE f] Robert Tracy Taube L. Postal Forwards correspondence on Sheffield 8/15/78 (NRC) (NRC) site for transmittal to H-Street Public Document Room. Jona Souder Taube L. Postal Forwards correspondence on Sheffield 8/15/78 (NRC) (NRC) site for transmittal to Moline Public Library. - 8/15/78 James Blackburn Kitty Dragonette Forwards 8/15/78 letter to Neel from (IDPH) (NRC) Smith, for information. 8/15/78 Dean Hansell/ Kitty Dragonette Forwards 8/15/78 letter to Neel from Susan Sekuler (NRC) Smith, for infomation. (Ill. Asst. Attys. Gen.) 8/15/78 Terry W. Conway Kitty Dragonette Forwards 8/15/78 letter to Neel from (NUS Corp.) (NRC) Smith, for information. 8/15/78 Robert Morse Kitty Dragonette Forwards 8/15/78 letter to Neel from Smith, for information. (Intervenor) (NRC) 8/15/78 E. Smith Murphy Kitty Dragonette Forwards 8/15/78 letter to Neel from (Battelle) (NRC) Smith, for information. 8/18/78 James Blackburn Kitty Dragonette Forwards 8/09/78 letter to Bell from (IDPH) (NRC) Baer, for information. 8/18/78 Dean Hansell/ Kitty Dragonette Forwards 8/09/78 letter to Bell from Susan Sekuler (NRC) Baer, for information. (Ill. Asst. Attys. Gen.) 8/18/78 Terry W. Conway Kitty Dragonette Forwards 8/09/78 letter to Bell from (NUS Corp.) (NRC) Baer, for infomation. 8/18/78 Robert Morse Kitty Dragonette Forwards 8/09/78 letter to Bell from (Intervenor) (NRC) Baer, for infomation. 8/18/78 E. Smith Murphy Kitty Dragonette Forwards 8/09/78 letter to Bell from (Battelle) (NRC) Baer, for information. 8/18/78 E.S. Friedell Kitty Dragonette Forwards 8/09/78 letter to Bell from T. Essig, (NRC) (NRC) Baer, for infomation. 8/21/78 Jona Souder Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) site for transmittal to Moline Public Library. 8/21/78 Robert Tracy Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) site for transmittal to H-Street Public O Document Room. i 3 -. - .

                                                       ,         .y . - - -- --   -,-,-r         c       - ,- , . , - - - . , . - , ,

s CHRONOLOGY - NECO - SHEFFIELD, ILLIN0IS SITE (G-) TO, FROM SUBJECT DATE Michael J. Bell T. S. Baer Transmits results of NEC0 borings on 8/25/78 168-acre portion of Sheffield site. (NRC) (NECO) James B. Foster Kitty Dragonette States that NRC has reviewed USGS 9/01/78 proposal to excavate tunnel under (USGS) (NRC) Sheffield site and has no objections-to USGS initiating study. 9/01/78 James Blackburn Kitty Dragonette Forwards 8/25/78 letter from NECO (IDPH) (NRC) to NRC, for information. 9/01/78 Dean Hansell/ Kitty Dragonette Forwards 8/25/78 letter from NECO Susan Sekuler (NRC) to NRC, for information. (Ill. Asst. Attys. Gen.) 9/01/78 Robert Morse Kitty Dragonette Forwards 8/25/78 letter from NECO (Intervenor) (NRC) to NRC, for information. 9/01/78 E. Smith Murphy Kitty Dragonette Forwards 8/25/78 letter from NECO (Battelle) (NRC) to NRC, for information. O 9/0i/78 Terry w. Coewey (NUS Corp.) xiety Dre90aette (NRC) Forwerds e/25/78 ietter from NECO to NRC and letter dated 9/01/78 to James Foster, USGS from NRC, for information. 9/01/78 Distribution List Kitty Dragonette Forwards 8/25/78 letter to NECO (NRC) from NRC, for information. 9/05/78 George DeBuchananne Kitty Dragonette Forwards 8/15/78 letter to NECO (USGS) (NRC) from NRC, for information. 9/05/78 James B. Foster Kitty Dragonette Forwards 8/15/78 letter to NECO (USGS) (NRC) from NRC, for information. 9/07/78 Michael J. Bell T. S. Baer Forwards partial responses to (NRC) (NECO) NRC's 8/15/78 request for additiona' information. 9/08/78 Michael J. Bell T. S. Baer Forwards partial responses to NRC's (NRC) (NECO) 8/15/78 request for additional information. 9/11/78 Distribution List Kitty Dragonette Forwards, for review, NEC0's 9/07/71 (NRC) (NRC) and 9/08/78 partial resoonses to NRC's 8/15/78 request for additiona' O iaformet4oa.

Sheffield Chronology Page 2 DAT TO FROM SUBJECT 9/TZ/78 Robert Morse Kitty Dragonette (Intervenor) (NRC) Forwards for information, NECO's 9/07 and 9/08/78 partial responses to NRC's 8/15/78 re tional information. quest for addi-9/12/78 Terry W. Conway (NUS Corp.) Kitty Dragonette (NRC) Forwards for information, NEC0's 9/07 and 9/08/78 cartial responses to NRC's 8/15/78 request for addi-tional information. 9/12/78 James Blackburn Kitty Dragonette (IDPH) (NRC) Forwards for information, NEC0's 9/07 and 9/08/78 partial responses to NRC's 8/15/78 re tional information. quest for addi-9/15/78 Jona Souder (NRC) Taube L. Postal (NRC) Forwards correspondence on Sheffield site forLibrary. Public transmittal to Moline 9/15/78 Robert Tracy (NRC) Taube L. Postal (NRC) Forwards ccrrespondence on Sheffield site for transmittal to H-Street 9/20/78 Public Document Room. Michael J. Bell T. S. Baer (d') (NRC) (NECO) Forwards NECO responses to NRC's 8/15/78 request for additional information. 1/28/78 L.G. Hulman/ Michael J. Bell J.C. Stepp (NRC) (NRC) Requests NRR technical review of - NECO responses be completed by October 2, 1978.

 '/28/78 Distribution List        Kitty Dragonette

! (NRC) Forwards letter dated 9/15/78 to M.J. Bell from D.J. McRae, Attorney for Intervenor, Haro.ld Schieler, eta

 /29/78                                                            (see Legal File D for complete 1tr.)

E. Smith Murphy Kitty Dragonette (Battelle) (NRC) Forwards NECO response to 8/15/78 request for information, dtd 9/20/78 for information.

 '29/78         Robert Morse            Kitty Oragonette (Intervenor)            (NRC)                     Forwards NEC0 response to 8/15/78 request for information, dtd 9/20/78 29/78 for information.

Terry Conway Kitty Dragonette (NUS) Forwards 9/15/78 letter from (NRC) 0.J. McRae & NEC0 response to 8/15/7 request for information, dtd 9/20/78 n for information.

Sheffield Chronology Page 3 TO FROM_ SUBJECT DATE 9/29/78 James Blackburn Kitty Dragonette Forwards 9/15/78 letter from (NRC) DJ McRae & NECO response to 8/15/78 (IDPH) request for infomation, dtd 9/20/78, for information. T. Essig Kitty Dragonette Forwards NECO response to 8/15/78 9/29/78 (RO. 3 -NRC) (NRC) request for additional information dated 9/20/78, for information. M.J. Bell T. S. Baer Forwards NECO's final response 9/29/78 to NRC 8/15/78 request for addi-(NRC) (NECO) tional information. 10/03/78 M.J. Bell T.S. Baer Transmits additional information (NRC) (NECO) to NECO response dated 9/20/78, to question A-1 of NRC 8/15/78 ltr. 10/10/78 M.J. Bell James Thomas Trip report on 9/26/78 Sheffield (NRC) (NRC) site visit. Distribution List Kitty Dragonette Forwards NECO responses dated 9/29 10/10/78

          ~

and 10/03/78 to NRC 8/15/78 request (NRC) (NRC) for additional infomation. 10/10/78 M. Weinstein/ Kitty Dragonette Forwards NECO response dtd 9/29/78 J. Levine (NRC) to NRC 8/15/78 request for addi-(NRC) tional infomation. 10/10/78 M.J. Bell J. Carl Stepp Response to memo dated 9/28/78 from (NRC) (NRC) MJ Bell. 10/12/78 Terry Conway Kitty Dragonette Forwards NECO responses dated 9/29 (NUS) (NRC) and 10/03/78, for information and review. l]/12/78 E. Smith Murphy Kitty Dragonette Forwards NECO response dated 10/3/7E (Battelle) (NRC) for information. 10/12/78 Robert Morse Kitty Dragonette Forwards NECO responses dated 9/29 (Intervenor) (NRC) and 10/03/78, for infomation. 10/13/78 Dean Hansell/ Kitty Dragonette Fomards NECO responses dated 9/29 Susan Sekuler (NRC) and 10/3/78, for information (Ill. Asst. Att. Gen.) O

e Sheffield Chronology Page 4 TO, FROM_ SUBJECT DATE James Blackburn Kitty Dragonette Forwards NEC0 responses dated 9/29 10/13/78 and 10/3/78, for infomation. (IDPH) (NRC) 10/19/78 Terry Conway Kitty Dragonette Forwards 10/10/78 memo from (NUS) (NRC) J. Carl Stepp, for information. Jona Souder Taube L. Postal Forwards correspondence on Sheffield 10/19/78 (NRC) (NRC) site for transmittal to Moline Public Library. 10/19/78 Robert Tracy Taube[. Postal Forwards correspondence on Sheffield (NRC) (NRC) site for transmittal to H-Street Public Document Room. 10/25/78 Leo Higginbotham M.J. Bell Requests written response to 4/17/78 (NRC) (NRC) memo from WP Bishop concerning Trench 18 at Sheffield. Michael J. Bell W. S. Bivins Review and coments on NECO response 10/25/78 (NRC) (NRC) to 8/15/78 request for additional information, per memo to Hulman dated 9/28/78. 11/15/78 Michael J. Bell Leo Higginbotham Responds to memo dtd 10/25/78 to (NRC) (NRC) L. Higginbotham concerning Trench 18 water levels at Sheffield site. 12/05/78 James N. Neel Michael J. Bell Requests NEC0 demonstrate site (NECO) (NRC) acceptability with additional data and new site utilization plan so NRC staff can conclude if Sheffield site can adequately contain radio-nuclides. 12/08/78 E. R. Smith Kitty Dragonette Forwards 12/05/78 letter from NRC (NUS) (NRC) to NECO and NRC Staff Answer to NECC: Motion to Compel Filing of Draft EI! (See Legal File C for affidavit.) 12/08/78 Robert Morse Kitty Dragonette Forwards 12/05/78 letter from NRC (Intervenor) (NRC) to NECO, for information. 12/08/78 E. Smith Murphy Kitty Dragonette Forwards 12/05/78 letter from NRC (Battelle) (NRC) to NECO, for information. O

c Sheffield Chronology Page 5 SUBJECT Q DATE T0, FROM Kitty Dragonette Forwards 12/05/78 letter from NRC 12/08/78 James Blackburn (IDPH) (NRC) to NECO & NRC Staff Answer to NECO Motion to Compel Filing of Draft EIS. for information. 12/08/78 Distribution List Kitty Dragonette Forwards 12/05/78 letter from NRC to (NRC) (NRC) NECO, for information. 12/15/78 John S. Moore Kitty Dragonette Requests information on chemical (Ill. EPA) (NRC) ,, waste site at Sheffield. 12/18/78 E. Smith Murphy Kitty Dragonette Forwards 12/15/78 letter to J. Moore (Battelle) (NRC) IEPA, from KSDragonette, NRC, for information. 12/18/78 Robert Norse Kitty Dragonette Forwards 12/15/78 letter to J. Moore (Intervenor) (NRC) IEPA, from KSDragonette, NRC, for information. 12/18/78 E. R. Smith Kitty Dragonette Forwards 12/15/78 letter to J. Moore (NUS) (NRC) IEPA, from KSDragonette, NRC, for information. Dean Hansell/ Kitty Dragonette Forwards 12/15/78 letter to J. Moore O 12/18/78 Susan Sekuler (NRC) IEPA, from KSDragonette, NRC, for information. (Ill. Asst. Att. Gen.) 12/18/78 James Blackburn Kitty Dragonette Forwards 12/15/78 letter to J. Moore (IDPH) (NRC) IEPA, from KSDragonette, NRC, for information. 12/19/78 Robert Tracy Taube L. Postal Forwards correspondence on Sheffield (NRC) (NRC) site for transmittal to PDR & LPDR. 12/26/78 James N. Neel Kitty Dragonette Forwards corrected copy of 12/05/78 (NECO) (NRC) letter with editorial changes and clarification changes to enclosure. 12/27/78 E. Smith Murphy Kitty Dragonette Forwards 12/26/78 letter to Neel (Battelle) (NRC) from Dragonette, for information. 12/27/78 Robert Morse Kitty Dragonette Forwards 12/26/78 letter to Neel (Intervenor) (NRC) from Dragonette, for information. 12/27/78 E. R. Smith Kitty Dragonette Forwards 12/26/78 letter to Neel (NUS) (NRC) from Dragonette, for information. O

EXMiBfr~ g 3 c3 a Page 6 Sheffield Chronology 3 W ,%. SUBJECT L TO FROM ATE Dean Hansell/ Kitty Dragonette Forwards 12/26/78 letter to Neel 12/27/78 from Dragonette, for information. Susan Sekuler (NRC) (Ill. Asst. Att. Gen.) James Blackburn Kitty Dragonette Forwards 12/26/78 letter to Neel 12/27/78 from Dragonette, for information. (IDPH) (NRC) Taube L. Postal Forwards correspondence on Sheffield 12/29/78 Robert Tracy (NRC) site for transmittal to POR & LPOR. (NRC) Kitty Dragonette Forwards letter dated January 18,197 1/24/79 Sheffield Service to Kitty Dragonette from Joseph F. List (NRC) Petrilli, IEPA, which responds to NRC's 12/15/78 letter to IEPA regarding NEC0's special waste disposal site in Sheffield, Ill. James Blackburn Kitty Dragonette Forwards 1/24/79 memo to Sheffield 1/26/79 Service List with IEPA response (IDPH) (NRC) dated 1/18/79. Robert Morse Kitty Dragonette Forwards 1/24/79 memo to Sheffield 1/26/79 Service List with IEPA response (Intervenor) (NRC) dated 1/18/79. (V) (O

   \/

e

CHRONOLOGY Nuclear Engineering Company, Inc. Sheffield, Illinois Facility FROM SUBJECT DATE TO, Michael J. Bell Thomas S. Baer Fomards report entitled, " Site l 1/25/79 Stratigraphic Study, Sheffield, (NRC) (NECO) Illinois Low-Level Radioactive Waste Disposal Site," dated 1/23/79 which responds to NRC's 8/15/77 question A-2. Thomas S. Baer Forwards 7 addf tional copies of 1/30/79 Michael J. Bell 1/23/79 Site Stratigraphic study (NRC) (NECO)

0. Thompson /G. Turi Xitty S. Dragonette Fomards NECO letter dated 1/30/79 1/25/79 and 1/23/79 Site Strati-(NRC) (NRC) graphic study, for information and review.

Thomas S. Baer Fomards 3 additional copies of 2/01/79 Michael J. Bell 1/23/79 Site Stratigraphic study (NRC) (NECO) xiety S or 9oaatte ro ~ rds arco i tt r d t d O 2/os/79 e a S ita (NUS) (NRC) 1/25/79 and 1/23/79 Site Strati-graphic study, for information. E. Smith Murphy Xitty S. Dragonette Forwards NECO letter dated 2/05/79 (Battelle) (NRC) 1/25/79 and 1/23/79 Site Strati-graphic study, for infomation. 2/05/79 James A. Blackburn Kitty S. Dragonette Fomards NECO letter dated (IDPH) (NRC) 1/25/79 and 1/23/79 Site Strati-graphic study, for infomation. James N. Neel Michael J. Bell Requests infomation in order 2/15/79 to fomulate license conditions (NECO) (NRC) for collection, transshipment and incidental processing; care of 20-acre site; and to prepare for decomissioning of SheffielG site. Edwin J. Reis Michael J. Bell Memo regarding ELD's interpre-2/16/79 tation of the Atomic Energy Act (NRC) (NRC) as it applies to burial of nuclear materials. Kitty S. Dragonette Fomards NRC's 2/15/79 letter Q 2/23/79 James A. Blackburn (IDPH) (NRC) to NECO, for information.

o Sheffield Chronology Page 2 FROM SUBJECT DATE T0, 2/23/79 Dean Hansell/ Kitty S. Dragonette Forwards NRC's 2/15/78 letter Susan Sekuler (NRC) to NECO, for information. (Ill. Asst. Attys. Gen.) 2/23/79 E. R. Smith Kitty S. Dragonette Forwards NRC's 2/15/79 letter (NRC) to NECO, for information (NUS) 2/23/79 Robert Morse Kitty S. Dragonette Forwards NRC's 2/15/79 letter to NECO, for information. (Intervenor) (NRC) 2/23/79 E. Smith Murphy Kitty S. Dragonette Forwards NRC's 2/15/79 letter to NECO, for information. (Battelle) (NRC) 3/05/79 S. Wastler Kitty S. Dragonette Forwards NEC0's 1/25/79 letter (NRC)

                                                              & 1/23/79 Site Stratigraphic (NRC) study, for infomation.

William J. Dircks Troy B. Conner, Jr. Withdraws renewal application 3/08/79 (NRC) (Counsel for NECO) and terminates license no. 13-10042-01 for activities at Sheffield Low-Level Waste Disposal Facility. 3/09/79 James N. Neel William J. Dircks Acknowled9es receipt of 3/8/79 (NECO) (NRC) letter & states license can only be teminated by NRC & that NECO is still responsible for assuring that the health & safety of the public are pro-tectedatthesite.(telegram and follow-up letter sent.) 3/12/79 E. R. Smith Kitty S. Dragonette Fomards 3/8/79 letter & motion (NUS) (NRC) to ASLB & 3/9/79 letter from NR( for infomation. 3/12/79 Dean Hansell/ Kitty S. Dragonette Forwards 3/8/79 letter & motion Susan Sekuler (NRC) to ASLB & 3/9/79 letter from (Ill. Asst Attys Gen) NRC, for information. 3/12/79 Robert Morse Kitty S. Dragonetto Forwards 3/8/79 letter & motion (Intervenor) (NRC) to ASLB & 3/9/79 letter from NRC, for infomation. 3/12/79 James Blackburn Kitty S. Dragonette Forwards 3/8/79 letter & motion (IDPH) (NRC) to ASLB & 3/9/79 letter from NRC, for information. O

Page 3 Shaffield Chronology FROM_ SUBJECT DATE TO, E. Smith Murphy Kitty S. Dragonette Forwards 3/8/79 letter & motion 3/12/79 to ASLB & 3/9/79 letter from (Battelle) (NRC) NRC, for infonnation. Jack R. Metzger Kitty S. Dragonette Site Security at the Sheffield 3/13/79 Burial ground. (NRC) (NRC) James N. Neel Acknowledges receipt of 3/9/79 3/14/79 William J. Dircks telegram & states that the (NECO) (NRC) State of Illinois, the owner of the site, are required to handle the routine maintenance of the site using funds NECO has alread, paid for that purpose. James N. Neel States NECO disagrees with IDPH 3/14/79 Paul Q. Peterson view that they (NECO) are respon (IDPH) (NECO) sible for Sheffield site. William J. Dircks Forwards Order to Show Cause, 3/20/79 James N. Neel effective imediately, requiring (NECO) (NRC) NECO to resume its responsibili-ties & obligations under License O No. 13-10042-01; & acknowledges receipt of NECO's 3/14/79 letter (SEEMISC.forSECYpaper SECY-A-79-42, supporting Show CauseOrder.) John B. Martin Michael J. Bell Trip Report on visit to Sheffiel 3/22/79 site to observe condition of the (NRC) (NRC) site with respect to the licensr conditions & 3/23/79 affidavit affirming that matters containe' in trip report are true. Kitty S. Dragonette Forwards correspondence on 3/26/79 Robert Morse Sheffield site, for infonnation (Intervenor) (NRC) Kitty S. Dragonette Forwards correspondence on 3/26/79 E. R. Smith Sheffield site, for information (NUS) (NRC) Kitty S. Dragonette Forwards correspondence on 3/26/79 Dean Hansell/ Sheffield site, for infonnation SusanSekuler(Ill. (NRC) Asst. Attys. Gen.) Kitty S. Dragonette Forwards correspondence on 3/26/79 James A. Blackburn Sheffield site, for information (IDPH) (NRC)

Sheffield Chronology Page 4 FROM SUBJECT DATE T0_ E. Smith Murphy Kitty S. Dragonette Forwards correspondence on 3/26/79 Sheffield site, for information. (Battelle) (NRC) Illinois Department Forwards copies of letters from 3/28/79 NRC of Public Health NECO to State of Illinois re-questing exemptions; & responses from State of Illinois. James Blackburn Kitty S. Dragonette Forwards 3/22/79 trip report & 4/04/79 3/23/79 affidavit, for info. (IDPH) (NRC)" Dean Hansell/ Kitty S. Dragonette Forwards 3/22/79 trip report & 4/04/79 3/23/79 affidavit, for info. Susan Sekuler (111. (NRC) Asst. Attys. Gen.) 4/04/79 E. R. Smith Kitty S. Dragonette Fomards 3/22/79 trip report & (NUS) (NRC) 3/23/79 affidavit, for info. l Robert Morse Kitty S. Dragonatte Fomards 3/22/79 trip report & 4/04/79 3/23/79 affidavit, for info. (Intervenor) (NRC) 4/04/79 E. Smith Murphy Kitty S. Dragonette Fomards 3/22/79 trip report & (Battelle) (NRC) 3/23/79 affidavit, for info. 4/04/79 Dean Hansell (Ill. Kitty S. Dragonette Suggests NRC & State of Illinois Asst. Atty. Gen.) (NRC) discuss the conditions for sta-bilization & decommissioning of Sheffield site by telephone. 4/04/79 Kitty S. Dragonette Dean Hansell Forwards copy of the analysis (NRC) (Ill. Asst. Atty. Gen) performed by Brookhaven Lab. on Trench 18 & certain well water samples at Sheffield. DeanHansell(IAAG)/ Kitty S. Dragonutte Forwards copies of pictures 4/11/79 (Enclosure 1 to Sheffield Trip Jim Blackburn (IDPH)/ (NRC) EdReis(NRC) Report dated 3/22/79) for info. Kitty S. Dragonette Paul Q. Peterson Acknowledges receipt of NRC's 4/13/79 4/4/79 letter to D. Hansell, (NRC) (IDPH) Illinois State, & states action IDPH has taken since receiving notice of unilateral abandon-ment at Sheffield from NECO. 4/16/79 Distribution List Kitty S. Dragonette Forwards copy of 4/10/79 Branch (NRC) (NRC) Position & 4/10/79 letter to ASLB from E. Reis fomarding p V conditions necessary to protect public health a safety & for site stabilization & decomi-ssioning at Sheffield (see Legal File E for letter), for info.

7 Page 5 Sheffield Chronology raos su8aect O Date to. Forwards correspondence on 4/16/79 E. Smith Murphy Kitty S. Dragonette Sheffield site, for information. (Battelle) (NRC) Kitty S. Dragonette Forwards correspondence on 4/16/79 Robe. t Morse Sheffield site, for information. (Intervenor) (NRC) Kitty S. Dragonette Forwards correspondence on 4/16/79 James A. Blackburn Sheffield site, for information. (IDPH) (NRC) Kitty..S. Dragonette Forwards correspondence on 4/16/79 E. R. Smith Sheffield site, for information. (NUS) (NRC) Kitty S. Dragonette Forwards 4/10/79 Branch Position 4/16/79 for information Dean Hansell/ (Ill. (NRC) Susan Sekuler Asst. Attys. Gen.) e 4/23/79 Troy Conner (NECo) S. Eilperin (NRC) Agreement re Sheffield site Susan N. Sekuler Confirms meeting on 6/25/79 5/29/79 Kitty Dragonette (NRC) (Ill. Asst. Atty. Gen)inChicago,Illinoisw/NRC, IAGO IDPH, ISGS, USGS, to establish a schedule for future actions involving NECO's Sheffield, Illinois site. rorverds s/23/79 ietter to siii O 6/oi/79 saeffieid service List kitty s oresoaette (NRC) Bivins, NRC, from Leroy E. Stratton, IDPH, which confirms telephone conversations re-garding the D'Appolonia piezo-meters located at Sheffield site 6/01/79 Thomas S. Baer R.D. Smith States NRC staff intention to (NRC) issue new docket & license num-(NECO) bers for Richland operations in order to separate Richland op-erations from Shefficid opera-tions. Sheffield Service Kitty S. Dragonette Forwards copy of Revision 1 of 6/05/79 Branch Position " Low-level Wasta List (NRC) Burial Ground Site Closure and Stabilization," dtd S/17/79, for information. 6/06/79 James A. Blackburn Kitty S. Dragonette Forwards 6/5/79 memo to Sheffie' (NRC) Service List, w/ enclosure, for (IDPH) information. 6/06/79 Robert Norse Kitty S. Dragonette Forwards 6/l & 6/5/79 memos to ("ac) saerrieid service 'ist */eaci-O (taterveaor) for infonnation.

Page 6 Sheffield Chronology O oare 10 rR0s SusacCr-E.R. Smith Kitty S. Dragonette Forwards 6/1 & 6/5/79 memos to 6/06/79 Sheffield Service List w/ encl. (NUS) (NRC) for information. Kitty S. Dragonette Forwards 6/1 & 6/5/79 memos to 6/06/79 Sheffield Service List, w/ enc 1. Dean Hansell/ (Ill.(NRC) Susan Sekuler for information. Asst. Attys. Gen.) Kitty S. Dragonette States all correspondence con-6/06/79 Docket File 27-39 cerning NEC0's Richland renewal (NRC),. application will be filed in Docket No. 27-48, from this date forward. O O

I l l CHRON0 LOGY O a#cieer e#a4#eer4#2 co ne v. t#c. Sheffield, Illinois Facility CATE T0, FROM SUBJECT 6/25/79 James N. Neel Lee V. Gossick Responds to NECO's 5/31/79 letter (NECO) (NRC) (attached) which requests reason why NRC informed DOE of their con-cerns about the future of NECO. 6/25/79 Sheldon Meyers Lee V. Gossick Forwards copy of NRC's 6/25/79 letter (DOE) (NRC) to NECO which states reasons NRC informed DOE contingency planning staff of their concerns about NECO future. R. Dale Smith Robert E. Jackson Status of Geotechnical Engineering 8/20/79 and Geology review of technical (NRC) (DSS,NRC) assistance to Sheffield site, per February 1978 memo from Meyers. 8/22/79 Thomas Baer States renewal of portion of NRC KittTDragonette 'ic ao 13-ioo42-oi hich authoriz : O (neco) (nac receipt, possession, storage & trans, portation of radioactive material in' ncn-Agreement States will be assignet a new docket number for these opera-tions only.

                                                                                      *O ll 4

O

E' 4 4 CHRONOLOGY h NECO/USE Sheffield, IL O DATE TO FROM SUBJECT 1/3/80 Goodhope JBMartin, WM New Info Potentially Relevant & Material ASLB to Licensing Board 1/22/80 WDircks. TConnor Requests date of " Interagency Task Force Report NMSS on Proposed Decommissioning of Sheffield" be char.ged 1/24/80 EReis ELD KDragonette kelease of above-stated report 2/4/80 TConnor RDSmith Reply to 1/22/80 ltr above stating date of report is correct 3/7/80 G. Turi L. Toler, DOI Ltr forwarding report " Preliminary Report on Hydrogeology of LLW Disposal Site near Sheffield, IL" 3/13/80 A. BDavis RDSmith Request for Inspection of Sheffield Facility 4/24/80 AGoodhope JBMartin, WM New Info Potentially Relevant & Material to Licensing Board 4/29/80 RMorse KDragonette Sends copy of memo dtd 4/24/80 6/3/80 RDSmith CEason, NECO Advises that Admiral Vincent dePoix is assuming responsibility as President C Chief Executive Officer O

                                                                                      / "s  ,

CHRONOLOGY _(Nuclear Engineering Company, Inc.) U.S. Ecology, Inc. Sheffield, Illinois Facility Date To, From Subject 6/18/80 Vincent P. dePoix John B. Martin (NECO) (NRC) Notifies NECO that NRC contractors will be visiting Sheffield site to collect data regarding conditions at the site. 7/01/80 Gale Turf Charles Bishop (NRC) Review of NUS Corporation's (NRC) estimates of the Sheffield radio-isotope inventory, 7/11/80 John B. Martin Charles F. Eason (NRC) Responds to NRC's 6/18/80 letter. (NECO) 7/31/80 James Blackburn R. Dale Smith (10PH) Requests 10PH to advise NRC if the (NRC) attached Statements of Work for contractor work to be pe formed at Sheffield site to establish existing conditions and to predict O long-term performance is in conflict w/IDPH activities planned at the site. 8/27/80 Charles F. Eason William J. Dircks NRC agreement to indemnify NECO (NECO) (NRC) against all damages arising in connection w/ activities of NRC contractor Geo-Centers, Inc. at Sheffield factif ty. 9/03/80 Vincent P. de Poix R. Dale Smith Infoms NECO that NRC contractor, (NECO) (NRC) Geo-Centers, Inc. will be at Sheffield site 9/8-12/80, collectir independent information on Sheffir site. 9/03/80 Milton Zukor R. Dale Smith Informs IDPH that NRC contract (10PH) (NRC) Geo-Centers, Inc. will be at Sheffield site 9/8-12/80, cc independent information at site. 9/04/80 Hudson B. Ragan Charles F. Eason Acknowledges receipt of (ELO) (NECO) 8/27/80 letter to NECO O

Sheffield Chronology Pagej ( 3 0 ATE TO, FROM SUBJECT Qj 9/26/80 Files Jim Shaffner Forwards material provided in (NRC) Harding & Lawson report, "Charac-terization of Existing Surface Conditions at the Sheffield LLWDF" which has been modified by NRC to reflect specific concerns w/short term site maintenance. Copies provided to NECO. 10/02/80 Charles F. Eason R. Dale Smith Infonns NECO of NRC staff and IGS (NECO) (NRC) staff plans to visit Sheffield site. 10/06/80 James H. Sniezek John B. Martin Forwards Harding & Lawson report. (NRC) (NRC) " Characterization of Existing Surface Conditions of the Sheffield LLWDF" and informs of WM staff intention to visit Sheffield site to determine if repairs have been performed properly and to make reconnendations for further im-provements, if warranted. 10/06/80 Sheffield Service John B. Martin Distributes Harding & Lawson report List (NRC) entitled, " Characterization of s Existing Surface Conditions at the Sheffield LLWDF." 10/23/80 Charles Eason David L. Stefken Informs NECO of pending visit to (NECO) (NRC) Sheffield site by contractor, Ralph Stone & Co., re: to familiarize RSC w/ site, review maintenace records and discuss operating experience w/NECO staff. Copy of S0W attached. 10/29/80 Sheffield Service John B. Martin Distributes page 36, which was List (NRC) inadvertantly omitted, from report sent 10/06/80, 11/12/80 R. Dale Smith Edward F. Hawkins Minutes of 9/25/80 meeting with (NRC) (NRC) NECO representatives on Sheffield Closure Conditions. 11/28/80 Edward F. Hawkins James A. Shaffner/ Trip report for Sheffield, Illinois (NRC) David L. Stefken visit en 10/14-15/80,re: surface (NRC) conditions in specified areas of the site. 12/29/80 R. Dale Smith T. S. Baer Advises NRC that effective 1/1/81 Ci (NRC) (NEC0/USE!) Nuclear Engineering Company, Inc. will change its name to U.S. Ecology, Inc.

Uocket or '. Dates From 1/5/81 Project No. 27-39 To W 7/81 facility Sheffield. IL CURRESPONDEflCE LOG

                                                                                           .. File _l981 O                                         i.

DATE TO FROM DESCRIPTION D. 51efken. WMLL Re planned visit to Sheffield 1/5/81 Charles Eason U.S. Ecoloay D. Smith, WMLL J. Shaffner, WMLL Report on trip to Sheffield 1/12/81 V. dePoix, U.S. Ecology O. Smith, WMLL Amendment 1 to change name fm NECO 1/1 9/81 to U.S. Ecology ( :  ?- . 4 2/10/El E. Hawkins. WMLL " rov Conner Site closure conditions . _ _ _ 3/4/W E. Hawkins L 31efKen Transmittal of Tr1D red 0rts 3/11/81 V. dePoix E. Hawkins Reference to Trenches 14 & 14A

   *See below                                                            (  , proprietary info 3/1 9/ 81           William Seltzer            J. Shaffner           Eng, plans, etc. re cutoff berm

- 3/27/a1 T. Conner i E. Hawkins eRe z/lu/si itr I Re our 3/11/81 Itr re proprietary 4/7/81 l E. Hawkins T. Baer info I Effective 4/20, J. Scoville to be 20/81 K. Dragonette T. Baer President of U.S. Ecology l 3/27/81 ltr--trench cap

      /21/81                                       T. Conner              df fE.Hawkins J. Shaffner            Ws         y U.S. Ecology Counsel 4/22/81    ,

O. Smith /E. Hawkins L nennnnatta ~ Prep. for hearings in U.S. Ecology 4/24/81 E. Christenbury ELD J. Martin, Wii Proceeding 6/16/81 C. Eason, U.S. Eco. D. Stefken Re upcoming visit to U.S. Ecology 8/14/81 T. Essig, IE, Reg. W. Hipsher, U.S. Ecol Summary of Quarterly Monitoring

                                         !!!                                data 8/25/81             E. Hawkins WfiLL           J. Shaffner, WfiLL      Trip Report - IL                        . ._

Re field studies at Sheffield 10/20/81 James Foster, USGS 0. Stofken, WMLL 11/6/81 D. Smith, WMLL J. Shaf fner, WMLL Trip Report of 10/14-16/81 Transmittal of Trfp Report re 12/17/81 D. Smith, WMLL M. Dunkelman, WMLL data collecting Sheffield meetinq between IE & J. Keppler, IE E. Hawkins, Wf1LL uti ($ha f fner) {l1/81

                                                                       /

1/22/32 Uates From icket or ,7,.9 (- ']' 3/10/82 To oject No.' _.L 1982 Fieffield, IL CURRESPONDENCE LOG File icify _ (Folder 1) s) DESCRIPTION FROM TO cATE Re visit to Sheffield 1/27/82 D. Siefken, WMLL C. Eason, USEcology 1/22/82 D. Stefken, WMLL Site Visit Notes - to Sheffield & E. Hawkins, WMLL Champaign, 1/27-28/82 2/5/82 R. Gaynor, USE Summary of ist tech, meeting for J. Shaffner, W!iLL tritium minration invest. , 3/3/82 I J. Shaf fner, WMLL Test wells constructed by USGS E. Hawkins, Wf1LL 3/9/82 D. 51ef ken, Wi1LL Notes of meeting on off-site E. Hawkins, WP'LL tritium migration at Sheffield l 3/9/82 flotes of meeting 2/24-25/82 in Urban D. Siefken. WMLL ILontritiummigrationatSheffieldj 3/9/82 E. Hawkins, WitLL f , Data obtained by Siefken at 2/24-25 M. Schumacher, IE,III J. Shaf fner, WitLL 3/10/82 l meeting at Champaign, IL l

    -O              i i

l i v

Docket or r- c-M Project No. 27-39 / ) j Dates From 3/23/82 Facility Sheffield, IL CURRESPONDENCE LOG To /O,M File l'982 I

         )                                                                                                         (Folder 2) 9 DATE                        TO                     FROM                           DESCRIPTION 3/23/82                  R. Gaynor, USE              J. Shaffner, WMLL       re trench water sampling 4/5/82                 Steering Committee      R. Gaynor USE                Tritium Migration Investigation A                          Members Re NRC approp ecvering any 5/6/82               W. flipsher, USE          P. Norry, ADM                damages in connec. w/BNL Re 3/23/82 request fm Shaffner 4/7/82                J. Shaffner, h3tLL        W. iiipsher, USE            for access to site W. tiipsher, USE          J. Shaffner, WMLL           Re 4/7/82 ltr for access 5/11/82 3/11/82              Steering Committee       R. Gaynor, USE              Tritium Migration Investigation Me.ab e rs I

6/1/82 , D. Saith, WMLL l D. Siefken, etLL Trip Report - to Sheffield

          *See below     '

l 5/12-13/82

       **See below       .

Notes of Steering Comm. Meeting for 7/15/82 lE.Hawkins,hMLL D. Siefken, h3tLL Sheffield Tritium Migration Study, 8/3/82 l D. Smith, h3tLL D. Ed, IL Req. for assis. o/10/o_ lL.Toler,USGS D. Smith, WMLL uava scumes c. unsupervised access _ 9/6/82 to Sheffield site 8/17/82 ISteering Comm. Members R. Gaynor USE Tg g p{1;g g gp g e g ation mo6/11/82 l T. Essig. Reg. III W. Hipsher USE Trench 18,1/82-3/82 i Notes of Sterring Comm. meeting for 9/20/82 I E. Hawkins, WMLL D. Siefken, WMLL Sheffield Tritium Migration Study, J / U / U E-Computer printout of env. mon, 10/8/82 J. Shaffner, h3tLL F. Melchiorri, IL results on 1982 data mqu s assis. 10/19/82 , D. Ed IL R. Scarano, WMLL 10/25/82 D. Siefken, WMLL R. licaly, DOI Results of tMum in water anahse: of grass samples 11/11/82 Steering Comm. R. Gaynor Tritium Migration Investigation

     *6/7/82                 Steering Comm.          R. Gaynor                 Tritium Migration Investigation
     *7/7/82 Tritium Migradon Investigadon 12/20/82                   Steering Committee       R.K. Gaynor a
 ,/q
        )

Docket or Uates From 1/21/83 Project No. 27-39 Facility Sheffield. IL CORRESPONDENCE LOG le 1983  ! O FROM DESCRIPTION CATE TO Steering Comittee R. Gaynor, USE Tritium Migration Investigation 1/21/83 Irlp Report for 12/1-2/82-Sheffield LLW Disposal Facility 1/25/83 Ross Scarano James Shaffner Steering Committee Meeting Notes D. Siefken of January 17, 1983 1/28/83 Edward Hawkins Trip Report for 12/1-2/82-Sheffield LLW Disposal Facility 2/24/83 Edward Hawkins J. Sh'affner Trip Report for March 16-17, 1983 J. Shaffner Sheffield

        '. a/83
         .                   Edward Hawkins Letter 6 response of March 18, 198 Richard Healy                         to Healy from Gaynor 3/31/83                                     Ronald Gavner Letter of Investigation (Tritium)

Rnnald naynn , the Sheffield comittee 4/8/83 Robert Brownino Investigation of Tritium Migration East of Sheffield Building t/8/83 Dr. Jerry Scoville navy N urinh+ Ltr. transmitting Sheffield analyg Jamae Shaffna, results requested by Shaffner 13/83 Melanie Hamel Trip Report - Sheffield, IL May 3-5, 1983 6/23/83 L. Hfqqinbotham J. Shpffner Ltr. attaching addendum consisting of data sheets for Rep. No. 27-39 7/95/83 J. Scoville C. Pacerfello

  -                                                                  Trip Report - Sheffield, IL July 27-28, 1983 8/11/83              P. Lohaus              J. Shaffner 1

Summary of Quarterly Monitoring d T. H. Essig' W. Hipsher of the piezometers and wells 9/15/83 Meeting Notes for 8/26/83 - L. Higginbotham J. Shaffner Reston, Virginia 9/26/83 Hew NRC Hydrologic Representative 31/16/83 R. Browning J. Shaffner the Tritium Migration Study

       /                             ,

IDNS Environmental Surveillance M. Hamel of Sheffield report 11/18/83 J. Shaffner Trip Report for Presentation of 8 11/18/83 L. Higginbothanr J. Shaffner source term data on Sheffield k Sheffield Tritium Migration Study 11/7/83 Various T. Lash Meeting

Jocket or Dates From 1/21/83 Project No. __ 77_2a To Facility Sheffield, Il CURRESPONDENCE LOG File 1983 (J3 FROM DESCRIPTION DATE TO Enclosed several copies of letters issued by the State of Illinois. 11/21/83 Jim Schaffner W. Kenneth Waller Sheffield LLWDF in order to study

                                      .            3 g, . , g       gas transport in the unsaturated.

Ronald X. Gaynor Dick "^2y 11/28/83 Tritium Migration Investigation. 11/29/83 Steerino Committee R. K. Gavnor Report on Tritium Migration Study Meeting. 12/2/83 Leo B. Hiqainbotham James A. Shaffner Hydrogeologic assistance from Mal Knapp L. Higginbotham Dan Goode on the Sheffield LLWDF 12/13/83

                                                                     "       "         a       n 12/21/83           L. Higginbotham      M. Knapp Advances.in Infiltration Confereni 12/21/83           M. Knapp             0 Goode Personnel - Membership of Steerin Sterring Committee   L. Toler           Committee on Tritium Migration In 12/27/83 O                        I I

O

Dates From 01/01/84 Docket or To 12/31/84 Project No. 27-39 File No 27-39 llhcility: Sheffield CORRESPONDENCE LOG FROM DESCRIPTION DATE TO Notification of Mtg 2/16 - T. Lash 2/17/84 and a copy of Agnda 1/31/84 J. Shaffner Montnly Update for Envirn Various T. Lash Surveillance Data 2/3/84 Correction in the Distrib. J. Goodie for ST receipient 2/10/84 DCC Surveillance Data Tritium Steering Comm. R. Gayor Migration Investigation 2/13/84 Data Sheets for Report Scoville C.J. Paperiello No. 27-39/83-01 2/17/84 Trip Report-Tritium Migration L. Higginbotham Goode/Shaffner Study Sterring Comm. 1/19/84 2/21/84 Sheffield Mtg. of 2/28-29 2/21/84 Mtg. Participants T. Lash Thank you ltr. for materials C.J. Paperiello T. Lash received 2/28/84 Estb of a TWG To Formulate M. Knapp R. Browning Alt. Strat for Transfer of 3/5/84 Meeting of Apr. 4, 84, Meeting Partic. J.S. Goodie field Radio. Waste Dis., Site 3/13/84 Div. of Health Physics Monthly Updates 3/26/84 Rec. (SESD) Contract agreement to furnish O 3/28/84 A. Crase K. Jackson (USE) Radio. shipping records American Ecology Corporation C.C. Leber R.L. Fonner File No. 0-11688 4/12/84 Trip Report-Chicago, Illinois L.B. Hiqqinbotham J.A. Shaffner April 4, 1984 4/13/84 Request for formal Legal Opinion of the Potential for Transfer of the Sheffield R. Fonner L.B. Hiqqinbotham LLWDF to the DOE 5/17/84 M. Hoscheid C. Cudd Retract of Docket 27-39 Doc. 6/18/84 Comments on recent statements made in South Dakota about the Sheffield low-level radioactive waste disposal D. Etchison site. 7/2/84 T. Nelson Sheffield Low Level Rodio-J. Shaffner A.J. Armbrust active Waste Dis. Site 7/6/84 NRC Approval for Bruial of Babcock & Wilcox Package 8/15/84 J. Shaffner R. Sauer R. Gaynor Tritium Migration Invest. 8/21/84 Steering Comm. Information provided upon E. Martinez request 8/24/84 J. Shaffner Analysis of Shefield Water J.A. Shaffner M. Hamel for PU 8/31/84

Submittal of data for NRC

    .g 10/5/84                                          R. Browning          B. Dillon                       Use Docket 27-39 Sheffield Low Level Radioactive Waste Dis-A. Armburst                     posal Site.

10/6/84 J. Shaffner Transmittal of draft by the D. Ed Illinois Geological Survey [12/5/84 J. Shaffner Wl 12/10/84 L. Higginbotham M. Bell Draft Memo to Heyward Shealy Geologic and hydrologic data collected during 1976-1984

'                                                                                                                      at the Sheffield low-level t                                                                                                               radioactive-waste disposal
,      i                                                                               L. Toler                        site and adjacent areas i-      12/19/84                                           D. Goode Trip Report - Trip to 1     12/27/84                                           L. Higginbotham    J. Shaffner                     Springfield, Illinois iltx,-f+uM.a+

y n.a. , ft "

             \} we
               \      ,
                                                                    - +,

4 O 'l i i i O

r DATES From 01/01/35 Docket or

   . Project No. 27-39                                                 To     12/31/85 File     27-39 Facility       SHEFFIELD O

CORRESPONDENCE LOG DATE TO FROM DESCRIPTION Results of organic analyses for water samples taken from wells 01/16/85 JShaffner GGarklavs Quarterly monitoring data of the Piezometers and well in the vicinity of Trench #18 g01/18/85 JShaffner M8owen Infonnation for field trip to Sheffield 01/22/85 JShaffner 0Flynn Trip Report - Springfield, Ill. 03/04/85 JKeppler RLickus Summary of the quarterly monitoring ' data of the piezometers and wells 03/26/85 JShaffner MBowen

I DATE3 From Docket or

 -    Project No. 27-39                                                         To              l l

File  ; ility I l CORRESPONDENCE LOG  ! TO FROM DESCRIPTION DATE Letter concerning US Ecology's Sheffield, Illinois Low-Level Waste Burial Site 08/16/85 EMoran RFonner Comments on our July 9, 1985 proposal to install an integrated

                                                              . groundwater monitoring system SWright          NKirner

()08/22/85 Conversation on NRC/0RNL Trip and INDS MHamel DGoode 08/15/85 Summary of quarterly monitoring data of the Piezometers and Wells Undated JShaffner MBowen Trip Report - Travel to Sheffield 10/01/85 LHigginbotham JShaffner

I CATE5 From 01/01/85 Docket or 27-39 To 12/31/85

  -  Project No.

File 27-39 cility CORRESPONDENCE LOG TO FROM DESCRIPTION DATE Trip Report - Sheffield LLW Facility, Sept. 18-19, 1985 MKnapp RLee 10/02/85 Request for infonnation to update our environmental monitoring files on Sheffield LLWDF EMert4nez aSheffner O 10/04/85 Summary of the quarterly monitoring data of the Piezometers and Wells Undated JShaffner MBowen l 1 1 m w

T

   .                                                               DATE5 From Docket or     27-39
   . Project No.

File Facility O CORRESPONDENCE LOG O FROM OESCRIPTION i, Copy of preliminary results from recent. sampling at the Sheffield Low-Level radioactive waste disposal site MHamel 0Goode 04/15/85 Perspective on groundwater flow at Sheffield JShaffner DGoode O 05/24/85 Summary of the quarterly monitorinc data of the piezameters and wells JShaffner MBowen 07/05/85 t Meeting with O'SGS RE: INDS reques that USGS decommission their facilities at Sheffield 08/01/85 JStarmer JShaffner Request.for a copy of the Brookhaven Laboratories report on l Waste Trenches at Sheffield's Site RBrowning EMonran 08/06/85

( DATE3 From 01-01-66 Occket or To O's .t w Project No. _ 27-39 File 27-39 Facility SHEFFIELD

      'v CORRESPONDENCE LOG TO       FROM                       DESCRIPTION DATE National Low-Level Waste Management Program-(INS)

Transmittal of Report, Review of information on the Sheffield Site 01/16/86 JShaffner JCase Summary of the quarterly monitoring data of the piezometers and wells i the vicinity of Trench #18 sumps fc 01/27/86 JShaffner MBowen the fourth quarter g-Draft NUREG-ll83 entitled "Nonradiological Groundwater Qualit at Low-Level Radioactive Waste Disposal Sites" 04/07/86 EMoran RBrowning Final report entitled "Results of Reconnaissance Evaluation of Hazardous Migration in Ground Water 04/09/86 EMoran R8rowning f"d $c 1v t00 nn SY $ iti Summary of the quarterly monitorint data.of the piezometers and wells the vicinity of Trench #18 sumps ft the first quarter. l 04/09/86 JShaffner MBowen g ( V l

            - - . - _ _ _ _ _ _ _}}