January 16, 1987
Docket No. 50-341
DISTRIBUTION:
1 Docket No.c 50'341'
MEMORANDUM FOR:
C. E. Norelius, Director
No PDR
Division of Reactor Projects
BWD-3 r/f
Region III
EAdensam
EHylton
THRU:
Elinor G. Adensam, Director
RBernero
BWR Project Directorate No. 3
JStefano
Division of BWR Licensing
Glainas
FROM:
John J. Stefano, Sr., Project Manager
BWR Project Directorate No. 3
Division of BWR Licensing
SUBJECT:
NRR/SER PERTAINING TO OPEN FIRE PROTECTION ITEMS FROM
REGION III SPECIAL INSPECTION OF FERMI-2 (INSPECTION
REPORT NO. 50-341/85050 (DRS))
.
Region III inspectors identified several open fire protection items as a result
of a special inspection conducted December 2-6, 1985, which were delineated in
the subject inspection report. Three open items (Nos. 6.g. (1), 6.g. (2) and
6.o. (3)), noted in that report, pertain to electrical cable feed used in the
independent alternate shutdown system which are routed through the fire areas
of concern for which the alternate shutdown system is provided.
At issue was
whether the licensee had complied with previous commitments to the NRC to assure
that at least one means of safely shutting down the reactor remains undamaged by
any fire in any area of the plant. The commitments were made by the licensee to
demonstrate compliance with the guidelines of the Standard Review Plan Branch
Technical Position 9.5-1.
By letter dated January 3, 1986, the licensee addressed the three open items
discussed in the subject inspection report. The NPR staff has reviewed the
licensee's response and concludes that sufficient fire protection capability has
been provided by the licensee to accept the proposed modifications planned for all
three fire protection open items. The NRR staff's SER is enclosed. This finding
has been confirmed by a follow-up Region III inspection June 30 - July 1,1986,
the results of which are documented to the licensee by Region III letter dated
July 21, 1986.
Should there be any qucstions relative to the enclosed SER, please let ne know.
/S/
G701300136 070116
PDH
ADOCK 05000341
G
,lohn il. Stefano, Sr., Project Manager
RWR Project Directorate No. 3
Division of RWR Licensing
Enclosure:
As stated
cc: See next page