ML20212M380
| ML20212M380 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/31/1986 |
| From: | Hutchison L, Powers C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 8701300104 | |
| Download: ML20212M380 (4) | |
Text
.._-_
DPERATING DATA REPORT WNP-2 01-Nov-86 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Oct-86 OUTAGE + DN-LINE HOURS 745 3.
UTILITY CONTACT:
LEONARD HUTCHISDN (509) 377-2486 4.
LICENSED THERMAL POWER (MWt):
3323 5.
NAMEPLATE RATING (GROSS MWe):
1200.9 i
6.
DESIGN ELECTRICAL RATING (NET MWe):
1100 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 1140 B.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1095 9.
IF CHANGES DCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
2
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET HWm):
1020
- 11. REASONS FOR RESTRICTIONS, IF ANY: VIBRATION IN #4 TURBINE GOVERNOR VALVE j
l MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 745 7296 16496.2
- 13. HOURS REACTOR CRITICAL 745.0 5026.3 12342.4 1
- 14. RX RESERVE SHTDWN HRS 0.0 340.4 340.4 i
- 15. HRS GENERATOR DN LINE 745.0 4792.9 11B19.3
- 16. UNIT RESERVE SHUTDOWN HOURS 0.O 381.7 381.7
- 17. GROSS THERMAL ENERGY (MWH) 2241600 12903930 30468210 i
- 18. GROSS ELECTRICAL ENERGY (MWH) 767320 4304900 10128150
- 19. NET ELECTRICAL ENERGY (MWH) 738265 4131860 9718633 l 20. UNIT SERVICE FACTOR 100.0%
65.7%
71.6%
i 21. UNIT AVAILABILITY FACTOR 100.0%
70.9%
74.0%
- 22. UNIT CAPACITY FACTOR (MDC NET) 90.5%
51.7%
53.8%
- 23. UNIT CAPACITY FACTOR (DER NET) 90.1%
51.5%
53.6%
- 24. UNIT FORCED DUTAGE RATE O.0%
3.4%
7.5%
.i 25. FORCED OUTAGE HOURS O.0 167.B 952.8 (TYPE DATE DURATION):
l
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS REFUELING &MAINTENANCEOUTAGESCHEDU_L_ED4/15'/_87 FOIL _60DA_Y 1
j i
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
8701300104 961031 g,.,
DR ADOCK 0500 7
-ff-(
i.
1
DOCKET NO.
50-397 till T tlN.!E WNP-2 DATE 11/3/86 LNIT SIUIDOWNS / REDUCTIONS C0t&LETED BY tR HnTrHMnN REPORT PERIOD OCTOBER 193 TELEPil0tE (509)377-2486
- month, year fl0.
UhE TViT IOURS REASON _ METitCO LER totOEH SYSIEM COMPONENT CAUSE & C0fMECTIVE ACT10tl 10 filEVENI RECURRENCE I
I l StAf fARY I WNP-2 OPERATED WITH NO OUTAGES IN OCTOBER.
TYPE REASON METil0D SYSTEM & COMP 0 TENT F-Forced A-Equip Failure
. F-Admin 1-Manual Exhibit F & 11 S-Sched D-Maint or Test.
G-Oper Error 24fanual Scram Instructions for
~
C-Refueling Il-Other 3-Auto Scram Preparation of D-RcGulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (tOREG-0161)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT unp_>
DATE 11/3/86 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH OCTOBER 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 991 3
17 1065 2
1s 972 3
973 is 1011 4
20 977 5
1010 985 21 1010 6
22 1015 7
1010 1012 23 1004 a
934 24 1012 1008 2s 852' to 1000*
26 998 27 1004 1008 12 1011 2s 13 1004 1007 2s.
020 1002 l
14 3o 1015 1
15 31 971 to 1015
- BASED Off A 25 HOUR DAY BECAUSE OF RETURNIllG TO STAf1DARD T1f1E.
INSTRUCTIONS On this form, list the awrage daily unit power lowl in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
These 8gures wdl be used to plot a graph for each reporting month. Note that when maximum dependabic capacity is used for the net electrical rating of the unit, there may be occasions when.the daily average pour !cvel exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit powr output sheet should be footnoted to explain the apparent anomaly.
N o
b WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
- 3000 George \\Yasinirugtors \\ Yay
- Riclularud. \\Vasisittgtorn 99352 Docket No.
50-397 November 7, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for October 1986 as required by our Technical Specifications 6.9.1.6.
Very truly yours, ih NW C. h. ' Powers (M/D 927M)
WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -
NRC, Region V Mr. Robert T. Dodds-NRC Site Representative Ms. Dottie Sherman -
ANI, Farmington CT Mr. J. T. Wheelock -
INP0 fph
\\ \\