ML20212M296

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 990802-06.Violation Noted: as of 990806,monthly Gamma Scans of Composited Air Filters Not Performed for Previous Year
ML20212M296
Person / Time
Site: 07000734
Issue date: 10/20/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20212M294 List:
References
70-0734-99-01, NUDOCS 9910270244
Download: ML20212M296 (2)


Text

\

l 1

ENCLOSURE 1 NOTICE OF VIOLATION i

General Atomics Docket No.: 70-734 San Diego, California License No.: SNM-696 During an NRC inspection conducted on August 2-6,1999, a violation of NRC requirernents

~,

was identified. In accordance with the " General Stutement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, Revision 1, the violation is listed below:

Safety Condition S-1 of License SNM-696 authorizes the use of the conditions in Part 11, l.icense Specifications, dated July 24,1981, and its supplements.

Part 11, Section 6.1," Environmental Air Sampling," requires that composites of the environmental air sampling filters be gamma scanned monthly.

Contrary to the above, as of August 6,1999, the monthly gamma scans of composited air filters had not been performed for the previous year.

This is a Severity Level IV violation. (Supplement VI)

Pursuant to the provisions of 10 CFR 2.201, General Atomics is hereby required tc submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite /.00, Arlington, Texas 76011, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately l addresses the required response. If an adequate reply is not received within the time specified l in this Notice, an order or a Demand for Information may be issued as to why the license should l not be modified, suspended, or revoked, or why such other action as may be proper should not i be taken. Where good cause is shown, consideration will be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001, Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must 9910270744 991020 PDR ADOCK 07000734 C PDR t

r e

2 specifically identify f'e portions of your response that you seek to have withheld and provide in detail the bases for ya claim of withholding (e.g., explain why the disclosure of information will create an unwarranted il vasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial

.information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19.11, you may be required to post this Notice within two working days.

Dated at Arlington, Texas this 20" day of October 1999 l

l

!