Submits NRC TMI-2 Cleanup Project Directorate Weekly Status Rept for 870117-25.Preventive Maint of Fuel Shipping Cask Support Equipment Continuing.Preparation & Loading of Cask Expected to Begin Next Wk
ML20212M267
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/26/1987
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-87-008, CON-NRC-TMI-87-8 NUDOCS 8701300057
Download: ML20212M267 (3)


Text

y-

,o

.k>

1 January 26, 1987 HRC/Till-87-008

!!D 0RANDUl4 FOR:

Harold R. Denton, Director f

Office of Nuclear Reactor Regulation h

Frank J. i4f raglia, Director Division of PWR Licensing-B FR0ll:

William D. Travers, Director T111-2 Cleanup Project Directorate 1-SU3 JECT:

ilRC THI-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS,

REPORT FOR January 17 - 25, 1987 1.

DEFUELING

}

Fuel removal continued at a normal rate, a canister per day, using the spade bucket tcol.

1 Installation of the Airlift Defueling Systca began the latter portion of the week. Operations using this system are expected to l

begin during the week of January 25.

2.

EtiVIRONMENTAL lt0NITORItiG US Environnental Protection Agency (EPA) sample analysis results show that Tiil site liquid effluents are in accordance with regulatory limits NRC requirenants, and the City of Lancaster

/

Agreement.

Tl!I water effluents are sampled fron the station (Units 1 and 2) discharge and analyzed by EPA. Gama spectrum analyses of the seven M

daily composited samples for January 3 - 10, 1987 indicated no TMI-2

^'

related radioactivity.

EPA's gama spectrua analysis of the NRC's THI outdoor air sanple for the period January 4 - 10, 1987 showed no reactor related 7

,' 1 radioactivity.

The Lancaster water works intake conposited seven daily sonples January 4 - 10, 1987. The gami spectrum analyzed by EPA showed no reactor related radioactivity.

3.

AUXILIARY AND FUEL llA!!DLING BUILDING ACTIVITIES Preventive maintenance of the fuel shipping cask support ecuipmnt continued. Preparation and Icading of the cask is expectec to begin next week.

/

gj

/

l 8701300057 870126 PDR ADOCK 0500 0

R 4

w.>

NRC FORM 318 (10 80) NRCM 0240 OFFICIAL RECORD COPY

'j

O 9

lierold R. Denton 2

January 16, 1907 Frank J. !!iraglia fiRC/THI-87-005 Testing of the Auxiliary Sump Transfer and Sung Solidification Systens has resuned.

Diesel generatcr basement scabbling continues.

Rabat " louie 2" was used in scabbling of Seal Injection Valve Roca during the weekend.

4.

f0C EVALUATIONS IN_ PROGRESS Technicel Specification Change Request nuabars 49, 51, 52, an.1 54.

Recovery Operations Plan Change nunhers 31 and 33.

Solid Waste Facility Technical Evaluation Report.

Heavy Load Safety Evaluation Report., Revision 3.

Disposal of Processed ibter P.cport.

Safety Evaluatica Report for Use of Plasna Arc Cutting Torch.

Tertporary Reactw Vessel Filtration Systen S.ifety Evaluetion Report, Revision 3.

Pressurizer Def seling Safety Evalu6 tion Report.

5.

! EETIf!!!

The Advisory Paael for the Decuatonination of Thrce Mile Island Unit 2 t,et on January 21, 1937 fron 7:00 to 10*00 PM at the Lancaster Council Chanbars, Public Scfety Dullding, 201 North Duke Street, Lancaster, PA.

The liRC staff discussed the Draf t Enviranuental Impact Stntenent on the disposal of accident-generated water.

Several individuals from the public spoke before the panel un issues of concarn regarding the preposed water disposal.

The next Advisory Pcnol ueetino ie, tentatively scacduled for Februa ry 26, 1987.

This m u ting will include further public discussion of the proposed di:;pasal of the tecident-generated water.

Exact date, tine, and Icestion of the nueting will be aynourcod in the future.

original signed by John Thomas for:

Willian D. Travers Director THI-Z Cleanup Project Diructorate

' su"m >

DATE);.........................

g NQC FORM 318 n0 80) NRCM 024 OFFICIR RECORD COPY j

!!arold R. Denton 3

January 16, 1907 Frank J. liiraglia ERC/T;1I-87-005 INTERML DISTRIBUTION UUITPTL' TILE GRC PDR LOCAL PDf:

Ei)0 OGC EPA DOE RI f'egional Nninistratoi RI Division Directors Public Affairs. El 5 tate Lioison, fM Till liq r/f T!!I SITi r/f T!!I-2 Project Section File T;11-1 P.asident Oh ice (5)

T!:I Cleanup Project Directorate (14) t

..T.M.\\ P.Q1 b..

.T.M.I.C,D.......T.f M..

.T.M. I. C..

}

orricc >

" * >. l, b/es.

Cowgill...

.JIho s.....

.WTraver(sC..

o^"> 1/gga7,,,,,,1/,,/87,,,,,1/gc/87,,,,,

,1/] (,/87,,,,,

i nne ronv ais tio soi sncu o24 OFFICIAL RECORD COPY