ML20212M084

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Sept 1986
ML20212M084
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/30/1986
From: Khazrai M, Storz L
TOLEDO EDISON CO.
To: Haller N
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NEO-86-00012, NEO-86-12, NUDOCS 8701300001
Download: ML20212M084 (2)


Text

Rev. 1 - 11/5/86 M6 74-ofta

/ Ofl OPERATING DATA REPORT 50-346 DOCKET NO.

DATE COMPLETED BY Morteza Khazrai TELEPHONE 1419) 249-5000, Ext. 7290 OPERATING STATUS Davis-Besse Unit 1 Notes

1. Unit Name:
2. Reportin Period:

sentember 1986

3. Licensed Thermal Power (31Wt):

2772

4. Nameplate Rating (Gross MWe):

925

5. Design Electrical Rating (Net MWe):

906

6. Maximum Dependable Capacity (Gross MWe):

904

7. Maximum Dependable Capacity (Net MWe):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Tiirough 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr to-Date Cumulative

11. Hours In Reporting Period 720 6.551 72,360
12. Number Of Hours Reactor Was Critical 0

0.0 35,877,1

13. Reactor Reserve Shutdown Hours 0.0 0.0 4,058.8
14. Hours Generator On-Line 0.0 0.0 34,371.8
15. Unit Reserve Shutdown liours 0.0 0.0 1,732.5
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 81,297,600
17. Gross Electrical Energy Generated IMWHy 0,. 0, 0.0 26,933,622
18. Net Electrical Energy Generated (MWH) 0.0 0.0 25,233,177
19. Unit Service Factor 0.0 0.0 48.0
20. Unit Asailability Factor 0.0 0.0 50.4
21. Unit Capacity Factor iUsing MDC Net) 0.0 0.0 41.0 1
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 38.9
23. Unit Forced Outage Rate 100.0 100.0 34.6
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

October 28, 1986

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY CO\\lMERCIAL OPER ATION 13

{k O

6

("/77 3 R

.IETi,//

  • f a

TOLEDO

% EDISON November 5, 1986 NE0-86-00012 File: RR 2 (P-6-86-09)

Docket No. 50-346 License No. NPF-3 Mr. Norman Haller, Director Office of Management and Program Analysis

^

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Haller:

Enclosed are ten copies of Revision 1 to the Operating Data Report of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the month of September 1986. The change to the report is indicated by a "1" in the right margin.

Please destroy your previous copy of the Operating Data Report from the September 1986 Monthly Operating Report and replace with the attached revised page.

If you have any questions, please feel free to contact Morteza Khazrai at (419) 249-5000 Extension 7290.

Yours truly, Louis F. Storz Plant Manager Davis-Besse Nuclear Power Station LFS/MK/ljk Enclosures cc:

Mr. James G. Keppler, w/1 Regional Administrator, Region III Mr. James M. Taylor, Director, w/2 Office of Inspection and Enforcement Mr. Paul Byron, w/1 NRC Resident Inspector Nuclear Records Management LJK/002 p,7 f

THE TOLEDO EDISON COMPANY EDISON PLAZA 200 MADISON AVENUE TOLEDO. OHIO 43652 i

i L