t N.R.C. OPERATING DATA REPORT DOCKET NO.60-315 DATE 11/4/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS

'1.

Unit Name D.

C. Cook Unit 1

2. Reporting Period-OCT 86 l notes
3. Licensed Thermal Power (MWt) 3250-l l'

4.

Name Plate Rating (Gross.MWe) 1162 l 5.

Design Electrical' Rating (Net MWe) 1030 l l

6. Maximum Dependable Capacity (GROSS MWe) 1056 l l

T.

Maximum Dependable Capacity (Net MWe) 1020 -----------------------

8.

If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe)

10. Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 745.0 7296.0 103728.0
12. No. of Hrs. Reactor Was Cri tical 745.0 6094.3 74383.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0 14.. Hours Generator on Line 745.0 6030.4 72883.0 LS. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2181226 174378b9 212433542
17. Gross Elect. Energy Gen. (MWH) 668550 5557390 69534930
18. Net Elect. Energy Gen. (MWH) 643144 5341509 66888666
19. Unit Service Factor 100.0 82.7 71.6
20. Unit Availability Factor 100.0 82.7 71.6
21. Unit Capacity Factor (MDC Net) 84.6 71.8 64.4
22. Unit Capacity Factor (DER Net) 83.8 71.1 62.1
23. Unit Forced Outage Ratn 0.0 17.3 8.7
24. Shutdowns Schedu]ed over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estimated linte of Startup:
26. Units in Test Status (Prior to Commercint Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8701290484 B61031 PDR ADOCK 05000315 R

PDR LCE0 4 1/ f

3 AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT ONE DATE 11/5/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 MONTH-OCT 86 AVERAGE DAILY-AVERAGE DAILY

. DAY POWER LEVEL DAY POWER LEVEL 1

848 17 865 2

855 18 865 3

846 19 862 4

865 20 860 5

866 21 854 6

857 22 857 7

851 23 856 8

850 24 855 9

850 25 878 10 849 26 894 11 850 27

.886 12 847 28 901 13 847 29 901 14 863 30 900 15 857 31 898 16 864 1

J

-....,.,......, _.. _ _.... _ _ _. ~ _. -... _ _ _ _, _. -. _, _ -. - -. - _, _

~

50-315 SINII'SililllHlWNS AND POWER HEDIM'llONS IKW:KE1 NO. T.C. Cook - Unit 1 UNil' N AME 11-5-86 IDATE B.A. Svensson CDMPR ETElt hy REPOR1 MDNill October, 1986 TEl.lPilONE 616/465-5901

'l I kensee

[j *,

h.,

$E 3

!Ih l'anse A ('oiscoive N i.

Dale gi n

,se Evens 31 ni Aoinn en a

of sE - jdig Nep us

  • id b Pievens Recussente 1

6

~-

NONE There were no unit shutdowns or significant power reductions during the month. The unit has operated at a nominal 90% power limit administratively imposed to minimize steam generator tube degradation.

4 I

2 3

4 1: 1 enceil Heasim:

Methnil:

Eninbit G-lustnersi.ms S: Siliciliale.1 A I!apnemens I ailuse (1.nplain) 1 Manual los Psepasatism ol' Data R Maintenmacs a.: Ted 2-Manual Sciani.

I:ntiy She. es fin i Acnsec

('-Nefueling 3 Asienniatic Siram.

liven Repini 11 l' R n I:ile INilRI G-D Residas Hy Ressikiiini

-l thhes (lisplain)

, n161) l' Opesasos l~saining& Ikense I mandnalism i

I -Ailniiiiist asive 5

j G Openalismal I;isses Ilimpi.ain)

'l slobit I - S.nne Seuen e l'8/17)

II Othes Iling4aint

e s

Dock t No.:

50-315 Unit Nrma D.C. Cook Unit 1 Completed By:

A. S. Puplis Telephone:

(616) 465-5901 Date:

November 6, 1986 Page:

1 of 1 MONTHLY OPERATING ACTIVITIES - OCTOBER, 1986, HIGHLIGHTS:

The reporting period began with the Unit at 90% rated thermal power.

The Safety Parameter Display Systen (SPDS) was unavailable most of the reporting period due to hardware problems.

The reporting period ended with the Unit at 90% rated thermal power.

The gross electrical generation for October was 668,550 MWH.

SUMMARY

10-4-86 At 0857, all Eberline Radiation Monitoring System (RMS) channels were inoperable due to both Control Room

-Control Terminals being inoperable, causing the Unit to enter action statements for Technical Specifications 3.3.3.10 a.nd 3.4.6.1.

All Eberline RMS channels were declared operable at 0947 the same day.

10-14-86 At 0737, the Control Room received an " Urgent Failure" alarm on the Rod the Control System due to 3 blown fuses and a failed amplifier board in the logic cabinet.

10-22-86 At 1238, a power reduction was initiated as required by Technical Specification 3.0.3 due to an apparent environmental qualification problem with Auxiliary Feedwater System Supply Valves (FMO 212 and 232).

The concern was resolved and the power decrease terminated at 87%.

Reactor power was restored to 90% at 1434 the same day.

r e

DOCKET NO.

50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE 11-6-86 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE OCTOBER, 1986 I&C-1 Received urgent failure alarm on rod drive control system.

Found urgent failure alarm indicated on power cabinets 1BD and 2BD and found 3 blown fuse indicators. Replaced blown fuse in-dicators and reset urgent failure alarm. When an attempt was made to move the rods, the urgent failure alarm was again received.

The problem was traced to a defective AC amplifier board at slot A812 in the rod control logic cabinet. The defective AC amplifier board and urgent failure alarm were reset and proper operation of the rod control system was verified.

p~

' j..

... r,-:*

  • j

'g '.

e, e

L.- _ _ u a

. Donced C. Cook Nucteer Plant P.O. Som 450. Bridgman. Mehqpen 49106 t

November 6, 1986 Director, Office-Of Management Information and Program Control

')'.

U. S.' Nuclear Regulatory. Commission Washington, D. C.

20555

' Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear plant Unit 1 Technical Specification 6.9.1.6, the attached Manthly Operating Report for the Month of October, 1986 is submitted.

Sincerely, t

t 7

s.

(,

v t

W. G.

ith, Jr.

A Plant Manager WGS:ab Attachments cc:

J. E. Dolaa M. P. Alexich R. W. Jurgensen NRC Region III B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Mierzwa C. A. Erikson D. W. Paul D. R. Hahn Z.

Cordero

,s J. J. Markowsky E. A. Morse PNSRC File INPO Records Center ANI Nuclear Engineering Department

$'>N

,}