Requests 90-day Extension on Performing 1986 Audit of Nuclear Matls Control Sys to Keep Audit Schedule in Step W/Snm Inventory Schedule.Fee Paid
ML20212K521
Person / Time
Site: 07001201
Issue date: 07/22/1986
From: Watters J
BABCOCK & WILCOX CO.
To: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8608220136
Download: ML20212K521 (3)


Text

Y q

70-4:26/

hTURN To 395_gg W

Babcock & Wilcox E"',*",,Mj,Li.,,,

a McDermott company P.O. Box 11646 Lynchburg. VA 24506-1646 (804) 522-6000 July 22, 1986 e

+

RECBVED d'

1 AllG 151986M E

United States Nuclear Regulatory Commission 4

s"s I

Attention:

Dr. Willard B.

Brown, Chief W S3 Fuel Facilities Safeguards Licensing Branch ~

d L

Division of Safeguards

  1. 'dTT[A Washington, D.C.

20555

References:

(1) SNM-ll68, Docket 70-1201 (2) Letter from W.

B.

Brown to J. P. Watters dated 3-06-86 Gentlemen:

The Babcock & Wilcox Company, Commercial Nuclear Fuel Plant is requesting a 90-day extension on performing the 1986 audit of our nuclear material control system (10 CFR 70.58 (c) (2).

Section 8.2.1.1 of our Fundamental Nuclear Materials Control Plan states that this audit is to be performed at intervals not to exceed 12 months.

Arthur Young and Company has performed the 70.58 audit usually during the second calendar year SNM physical inventory.

Performing this audit during an SNM inventory helps the Arthur Young auditors to assure a more complete review of the SNM accounting system used at the CNFP.

Typically, the second calendar year inventory for the CNFP has been taken during July-August, therefore our 70.58 audits have also been in the July-August timeframe which has maintained the 12 month requirement of Section 8.2.1.1.

The time table for 1986 has however been shifted due to inventory scheduling.

Our first CY 1986 SNM inventory was conducted on April 28, 1986 (60-day extension - Reference 2) with the 2nd inventory tentatively scheduled for October-November.

The last Arthur Young audit was initiated on August 12, 1985 therefore if the next Arthur Young audit is performed during the next SNM inventory, we will not be able to meet the 12 month requirement of Section 8.2.1.1.

o

^

a w c a....................a g

Check.;o..Q d (),Les 6

  • D L

Amacob Fca C.1h $ [.(('u 2/d" I

USNRQ

$\\

il?cctVca.. $ 1 l1 AUG t 5 Iggg'},{

' 'Rj !0E !!

d275b5

%. EM

~

r-m proo l90/ C SoM A

8608220136 860722 4/ p PDR ADOCK 07001201 f G2 C

PDR

6}

United States Nuclear Regulatory Commission Page 2 July 22, 1986 As a result, we are requesting that we be allowed to initiate the 1986 audit of the 10 CFR 70.58 (c) (2) systems within 90 days after the end of the 12 month period specified in 8.2.1.1.

This will help to assure a thorough review of the Nuclear Materials Control system by keeping the audit schedule in step with our SNM inventory schedule.

Enclosed is a check for $150 to cover the initial licensing fee.

If questions arise during your review, please feel free to call me at (804) 522-6202.

Sincerely, BABCOCK & WILCOX COMPANY COMMERCIAL. NUCLEAR FUEL PLANT h.h. bb J.

P. Watters License & Control Administrator JPW:cmr cc:

D. W.

Zeff B. W.

Pugh J. E. Glass J.C. Frost Enclosure