ML20212K026
| ML20212K026 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/31/1986 |
| From: | Behnke C, Lemons J BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8701280442 | |
| Download: ML20212K026 (11) | |
Text
- _ _______-__
OPERATING DATA REPORT Docket No. 50-317 Date:
January 8, 1987 Completed by C.
Behnke Telephones (301) 260-4871 OPERATING STATUS emeeeeeeeeeeeeee
- 1. Unit Name:
Calvert Cliffs No. 1
- 2. Reporting Period:
DECEMBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe) :
918 l
S. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825
- 8. Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 8,760 102,133
- 12. Number of Hours Reactor was Critical 0.0 6,906.2 79,807.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
- 14. Hours Generator On-Line 0
6,856.4 78,215.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 18,206.202 195,530,395
- 17. Gross Electrical Energy Generated (MWH) 0 6,087,181 64,689,993
- 18. Net Elsctrical Energy Generated (MWH) 0 5,830,803 61,747,098
- 19. Unit Service Factor 0.0 78.3 76.6
- 20. Unit Availability Factor 0.0 78.3-76.6
- 21. Unit Capacity Factor (Using MDC Net) 0.0 80.7 73.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 78.8 71.6
- 23. Unit Forced Outage Rate 0.0 3.8 8.6
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
None
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
01/04/87 8701280442 B61231 PDR ADDCK 05000317 R
PDR fM4,
AVERAGE DAILY UNIT POWER LEVEL l
Docket Mc. 50-317 Calvert Cliffs Unit No. 1 Date:
January 8, 1987 Completed by C. Behnke Telephone: (301) 260-4871 DECEMBER Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Eq.y (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
J UNIT SIRT11X1WNS AND IM1WIR RI'.IMX'I' IONS IMM'KIM' NO. _5_0-317
~
IINIT NAMi,_Callen Cliff _s -l_
DA'll? _ January 11. 1937_
COMI'I.ETED llY,,_c_, gehp_1ge REl'URT MIN 111 Decembor 19R6
'lV.I.El1HNI. (30O Jf0-4871..
m L.
O P
c-el O bf) u c
c Canise & Cos cert.ive
,o {
y,c g 1,i retisce Q
R'eg,
~
No.
Itif.c p -s in oao I; vent, uo
't Art ioni t o mo c
.c p n:
{.
p
]
Rel Nit't. M g'o t]
c O
l's eve tit. Re rter 1 nre g
.m, u
O 86-11 861201 S
744 C
4 N/A ZZ ZZZZZZ Continued shutdown for refueling and 10 year ISI.
i I
3 I;sliiltil G -lust 111el i'His l':
l'orre<l Reason:
hh tluul:
S: Seliecluleil A-1;
ional Erros- (Explain) II-Ot lier (fixplain) OPERATING DATA REPORT Docket No. 50-318 Date: January 8, 1987 Completed by C.Behnke Telephone (301) 260-4871 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs No. 2
- 2. Reporting Period:
DECEMBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918 5. Design Electrical Rating (Net MWe): 845
- 6. Maximum Dependable Capacity (Gross Mwe) :
860
- 7. Maximum Dependable Capacity (Net MWe):
825
- 8. Change in capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date cumulative
- 11. Hours in Reporting Period 744 8,760 85,488
- 12. Number of Hours Reactor was Critical 744.0 8,443.0 71,986.0
- 13. Reactor Reserve Shutdown Hours 0.0 35.9 1,296.6
- 14. Hours Generator On-Line 744.0 8,408.7 70,820.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,998,302 21,834,819 178,316,855
- 17. Gross Electrical Energy Generated (MWH) 675,491 7,315,988 58,837,512
- 18. Net Electrical Energy Generated (MWH) 648,676 7,006,666 56,156,923
- 19. Unit Service Factor 100.0 96.0 82.8
- 20. Unit Availability Factor 100.0 96.0 82.8
- 21. Unit Capacity Factor (Using MDC Net) 105.7 97.0 79.6
- 22. Unit C&pacity Factor (Using DER Net) 103.2 94.7 77.7
- 23. Unit Forced Outage Rate 0.0 3.7 5.9
- 24. Shutdowns Scheduled over Next Six Months (type, date and duration): Refuel-ing Shutdown:
March 14, 1987 to May 22, 1987 (69 days)
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
F. AVERAGE DAILY UNIT POWER LEVEL l Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: January 8, 1987 Completed by C. Behnke j Telephone: (301) 260-4871 DECEMBER Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 871 17 072 2 869 18 873 3 870 19 875 4 872 20 874 5 871 21 873 6 871 22 873 7 870 23 872 8 871 24 874 9 871 25 875 10 872 26 874 11 871 27 873 12 871 28 872 13 872 29 871 14 870 30 871 15 870 31 872 16 872 i UNIT Silll11MWNS AND l'tMIR RI'IMK,'I' IONS INXXIX NO. 50-318 llNIT NAPE _Calvert Cliffs-2 DNil? January 11, 1987 COMI'I,lWED IlY C. Behnke l RITORT PE)N11I December 1986 11:.I EI110NE (301) 260-4871 m L O V c-ei O to o c ,o rg y,c o I.icesisce Q 2'c4 c ('ai N - & ('on i ect.i vc ~ ,h gg g jgy
- Evesit, y4 Q
Art u, ni to No. Dat e H
- c o
uc Reixirt. //
- O EU l'rev ent Rernrrence
^ o:: y.c g: 'IJ U O n 'J) 3 U 8 N/A No shutdowns or significant reducta ions to report. 3 l': l'orce<l Reason: Ph tlioci: 1:sliil>it G Inst 1 erl. i onis S: Sclieeluleil A-1:<inignix:nt, l'ai lure (Explain) l - M.u n ia l l'o i - l'repiiral. ion ol' Dat a ll-Maint enance or Test. 2-M.innal Set ain. I'.til,i y Slicet x l'oi I.i rense C-Re l'nel ing 3 - An t < wnal. i e Sc rarn. I: vent. Regxn t. (I 1.R ) l'i le D-Repalat ory Rest rict, ion 4-111 lier (Explain i INIHin-0161) I',-O n i at.on Ti aisii sig & I.ic crise I'.xarriiii:it.iini l F-A<lmi n i st rat. i ve 5 Exliil 11. I - Semw? 9nn re G-Operat.innal Error (Explain) Il-Ot lier (Explain) ' r' J
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE DECEMBER 1986 Unit 1 was shutdown for refueling throughout this reporting period.
i i
- l
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE DECEMBER'1986 Unit 2 was at full reactor power (860 MWe) throughout this reporting period.
s,-,,
,--o-a w,--
e
.--m-+--wn--+-
--,n--
g
-e.---e---.,
g--,
mm-,
e,-,
p-3anuary 9,1987 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I 2.
Scheduled date for next Refueling Shutdown: October 25,1986
- 3.
Scheduled date for restart following refueling: January 10,1987 4.
Will refueling or resumption of operation thereafter re' quire a technical specification change or other license amendment?
Resumption of operation after refueling will not require changes to Technical Specifications.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
September 29,1986 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuelinserted into the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217
- (b) 1050 Spent Fuel Pools are common to Units 1 and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Changed since last report
January 9,1987 REFUELING INFORMATION REOUEST t
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 14,1987.
- 3. Scheduled date for restart following refueling: May 22,1987.
- 4. Will refueling or resumption of operation thereafter require a techaical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuelinserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217
- (b) 1050 Spent Fuel Poolis common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Changed since last report
s BALTIMO RE i
GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475. BALTIMORE, MARYLAND 21203 JAMES R. LEMONS MANAGER NUCLEAR OPERATIONS DEPARTMENT January 8, 1987 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20055 Attention:
Document Control Desk
Subject:
December Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Carl Behnke, (301) 260-4871.
Sincerely, i
f J. R.
Lemons Manager-Nuclear Operations Department JRL/CB/tyk Enclosures cc:
M.
Beebe (NRC)
V.
P.
O'Grady (BG&E)
E. K. Bewley (BG&E)
D. Reilly (INPO)
T.
Foley (NRC)
P. Ross (NRC)
K. Gibbard (DOE)
J. A. Tiernan (BG&E)
S. A. McNeil (NRC)
E. Wenzinger (NRC)
W. J. Lippold (BG&E)
Technical Librarian T. Magette (DNR)
File K. Gromack (CE)
_