ML20212J480

From kanterella
Jump to navigation Jump to search
Forwards Four Final Element Repts Re Employee Concerns in Engineering Category,List of Rept Numbers & Related Employee Concerns & Comparison Between Employee Concern Task Group Writers Guide Rept Format & Transmitted Repts
ML20212J480
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/20/1987
From: Mcdonald J
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20212J485 List:
References
NUDOCS 8701280211
Download: ML20212J480 (8)


Text

F 4 b-4 TENNESSEE VALLEY AUTHORITY

) Watts Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 January 20, 1987 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. Harold Denton, Director of Nuclear Reactor Regulation In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328

~ EMPLOYEE CONCERNS TASK GROUP (ECTG) e Enclosure 1 provides a listing of the report numbers, the related employee concerns, and the previous submit.tal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG I

Writer's Guide recommended report format and the transmitted reports.

Enclosure 3 transmits the final element reports for 4 elements addressing l

Sequoyah Nuclear Plant employee concerns in the Engineering category.

As indicated by the report cover sheets, these reports have completed final review by the Senior-Review Panel and the Employee Concern Task Group management.

Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.

i Very truly yours.

(

TENNESSEE VALLEY AUTHORITY

$ 4

' ,/J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager cc (See page 2.):

BM2*EE E$if 3 P

o An Equal Opportunity Employer

2

  • s U.S. Nuclear Regulatory Commission ec (Enclosures):

Mr. James N. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 U.S. Nuclear Regulatory Commission Region II Attn: Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Nr. B. J. Youngblood, Project Director PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814

y a J a f

1 Enclosure 1 i

f l

- - - - - - - - v wr--- rc-r-. -.-----.-w+--,- - , , --m-----.--- ,-v w,s---rr----**ww---, - - - - - . - -. - - - -

I I

9

  • ENCLOSURE 1 l Page 1 of I SEQUOYAH EMPLOYEE ELENENT REPORT CONCERN NUNBER ISSUE Engineering 20501 WI-85-100-043 Calculation Preparation (Final) *I-85-128-NPS Requirements  ;
  • Concern I-85-128-NPS added after 9/26/86.

NOTE: Initial report transmitted 12/17/86.

Engineering 22301 PH-85-054-001 Instrument Line Support (Final) IN-85-398-002 Connections IN-85-398-003 NOTE: An initial report was not necessary. This will be the only submittal for 22301.

Engineering 22206 IN-85-109-003 AISC Ninimum Weld Criteria (Final)

NOTE: Initial report transmitted 11/15/86.

Engineering 22912 IN-85-068-N06 Panel to Equipment Distances (Final)

NOTE: An initial report was not necessary. This will be only the submittal for 22912.

3272T

1 t

e I

r f

1 I

Enclosure 2

__ '- ~ ~ ~ ~ ~ ~ ~~ '~

ENGINEERING CATEGORY Encicsura 2 l Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue 1. Characterization of Issue (s)

Characterization 2.0 Summary 9. Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 Evaluation 8. Evaluation Process Process 5.0 Findings 9. Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)MM ** Overall Root Cause will not be considered at this report level.

7.0 Attachments / Attachments as required List of Concerns Other items included 2. Have issue (s) been identified j in Engineering Element in another systematic Reports analysis?

j

3. Document nos., tag nos.,

locations or other specific descriptive identifications stated in element.

4. Interview files reviewed
5. Documents reviewed related to the element 1992T i

ENGINEERING CATEGORY Enclcsuro 2 Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in Engineering Element 6. What regulations, licensing Reports commitments, design require-(cont'd) ments, or other apply or control in this area?

7. List requests for information, meetings, telephone calls, and other discussions related to element.

l

{

i

. - - - - _ _ - - _ _ _ _ _ - _ = _ . - _ - . - . - _ - _ . __ .

l' Enclosure 3 f

i

__- . - - - - . - - - - - - _ - .