Submits Rev to Reactor Operations Improvement Plan to More Accurately Describe Activities Identified in Util .Due to Reorganization,Plant Support Engineer Replaced by Maint Support Engineer
ML20212J168
Person / Time
Site: Fermi 
Issue date: 01/19/1987
From: Agosti F
DETROIT EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
VP-NO-87-0008, VP-NO-87-8, NUDOCS 8701280098
Download: ML20212J168 (2)


Text

l'

~

055$2.*Y Nuclear Operations Moil M'

r.r-in NO

$Nr** Ion.

January 19, 1987 VP-lO-87-0008 U. S. Ibclear Regulatory Caraission Attn: Document Control Desk Washington, D. C. 20555

Reference:

1) Fermi 2 1RC Docket No. 50-341 IGC License No. NPF-43
2) Detroit Edison to Region III, " Reactor Operations Improvement Plan,"

VP-85-0198, dated October 10, 1985.

3) Datroit Edison to Region III Letter,

" Reactor Operations Inprovement Plan-Additional InfF mation,"

VP-85-0219, dated November 27, 1985.

4) Detroit Edison Letter to the ImC,

" Response to Request for Information Pursuant to 10CFR50.54(f), VP-86-0008, dated January 29, 1986

Subject:

Reactor Operations Improvement Plan On September 10, 1985, a meeting was held between Region III and Detroit Edison to discuss operational occurrences at our Fermi 2 Plant. As a result of that meeting, Detroit Edison submitted a Reactor Operations Improvement Plan (Reference 2) and later provided additional information transmitted in References 3 and 4.

In order to more accurately describe Fermi 2 activities, as identified in Reference 4, the Reactor Operations Improvement Plan was revised as follows:

Item 54:

The Maintenance Support Engineer (MSE) reviews Potential Design Changes (PDCs) and Engineering Design Packages (EDPs) to minimize plant changes.

Due to recent reorganization, the title of Plant Support Engineer (PSE) has been replaced by the more accurate title of Maintenance Support Engineer (MSE). In addition, Engineering Evaluation Requests (EERs) have been replaced by Potential Design Changes (PDCs).

8701200098 870119 h0P PDR ADOCK 05000341 P

P PDR 5

.~a-USNRC

. January 19, 1987 VP-NO-87-0008 Page 2 Item 55:

he MIS conducts status meetings once each shift.

%e old Item 55 identified specific times *.en the Mis will conduct status meetings. There are many factors that can enter in that may not allw such a neeting to take_ place (i.e. plant activities). To better accomodate the NSS and not detract his attention from the events with the plant, he will have the flexibility to conduct status meetings once a shift as his activities allw. W is change does not alter the intent or purpose of the original action.

If you have any questions, please contact S. R. Frost at (313) 586-4210.