Monthly Operating Repts for Dec 1986
ML20212H483
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1986
From: Grant N, Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
L-87-22, NUDOCS 8701210449
Download: ML20212H483 (17)


Text

- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _.

AVERAGE PAILY UNIT ?OWin Livst DOCKET NO.

50 2sn UNIT Turkey point 3 DATE January 14.1987 N W. Grant COMPLETED BY TELEPHONE (305) 694-4432 MONTH December. 1986

. DAY AVERACE DAILY POWER LEVEL (MWe Net) 12/ 1/86 689 12/ 2/86 691 12/ 3/86 622 12/ 4/86 674 12/ 5/86 700 12/ 6/06 701 12/ 7/06 703 12/ 8/06 702 12/ 9/86 698 12/10/86 697 12/11/86 695 12/12/86 690 12/13/86 692 12/14/86 696 12/15/86 698 12/16/86 698 12/17/86 697 12/10/06 694 12/19/06 694 12/20/86 693 12/21/86 692 12/22/86 696 12/23/06 697 12/24/86 698 12/25/86 697 12/26/86 694 12/27/86 267 12/28/86

-15 12/29/86

-9 12/30/06

-7 12/31/86

-7 8701210449 861231 pa

^= = * *ssa

./Qfg

O OPERATING DATA REPORT DOCHET NO 50 - 250 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.

UNIT NAME: TURKEY POINT UNIT 3

2. REPORTING PERIOD: DECEMBER 1986
3. LICENSED THERMAL POWER (MWT): ______________ 2200
4. NAMEPLATE RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE):

693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

700

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! _____

666

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

{

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE t

11. HOURS IN REPORT PERIOD:

744 8760 123369.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

631.7 6988.2 86065.9

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 00 844.4

14. HOURS GENERATOR ON-LINE _________________

633.7 6820.6 85227.5

15. UNIT RESERVE SHUTDOWN HOURS 0

0 121.8

16. GROSS THERMAL ENERGY GENERATED (MWH) 1389881 14639886 176845407
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

459715 4763306 56634851

18. NET ELECTRICAL ENERGY GENERATED (MWH) 437321 4513059 53622640 f
19. UNIT SERVICE FACTOR _____________________

85.2 77.9 69.1

20. UNIT AVAILABILITY FACTOR ________________

85 2 77.9 69.2

21. CAPACITY FACTOR (USING MDC NET) 88.3 77.4 66.8
22. CAPACITY FACTOR (USING DER NET) 84.8 74.3 62.7
23. UNIT FORCED OUTAGE RATE _________________

14.0 17.8 8.0

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/15/97, 81 DAYS ______________________________________________ i l

l

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 1/5/87 i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

'in 78;n UNITNAME Turkey Point linit #3 DATE lan"mev la 1Q97

  • COteLETED BY N kl - hranf REPORT MONTH December. 1986 TELEPHONE ( inci) rica_da tp 3

Licensee gw,,

E a.

Cause & Correceive 5E 3

h yi k3 Auion to N'

U *' C 1

3$

4 2s&

Event r* T

$E 5

j di g Report a E0 Prevent Recurrence d

14 861227 F

110.3 A

2 250-86-41 HH TURBIN Following a loss of turbine generator governor control oil pressure which resulted in a loss of load, the reactor was manually tripped. While the unit was shut down repairs were made to a leaking feedwater bypass valve. Return to full power operation was delcyed to resolve reactor coolant pump oil level alarm and lift pump problems, to repair a steam gener-ator blowdown valve, and to repair a feed pump discharge motor operated valve.

l

)

1 2

3 4

I Fosted Reason -

Method:

Eshibii G - Inst ructions

% St heduled A E quipment Faduse(Emplam) l-Manual for Prepasation of Data il Mamienance or Test 2-Manual Scram.

Enity Sheces for Licensee C Refuelmg 3 Automatic Scram.

Evens Repose iLER) Fde INUREG.

D Regulaios) Resisiciion

$0ther (Explam) 0161I 1 Operator Tsainmg & latense I manunatiori i

1 Adenimsinative 9,,

C,,,,,,, w,

5 G Opesaininal I not (i splam t g_ t o a a 4 4ewc.,..es Estubii 1 Same Source re/17)

Il-Other 11 splaml

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-250 UNIT Turteoy pnint unit n DATE

.1anuary 14_ 14A7 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT MONTH nocomho r-14R6 See the " Unit Shutdown and Power Reductions" Report.

1 i

I 1

i t

i

.i I

AvgR AGE DAILY UNITPOWER Ltyrt DOCKET NO. 50-251 UNIT Turkey Point 4 DATE _ January 14. 1987 COMPLETED SY N.W. Grant TELEPHONE (305) 694-4432 MONTH December, 1986 DAY AVER ACE DAILY POWER LEVEL tMWe Net) 12/ 1/86 686 12/ 2/86 686 12/ 3/86 685 12/ 4/86 697 12/ 5/86 620 12/ 6/86

-18 12/ 7/86 129 12/ 8/06 698 12/ 9/86 696 12/10/06 491 12/11/86 689 12/12/86 687 12/13/86 685 12/14/86 693 12/15/86 697 12/16/96 696 12/17/86 695 12/18/86 694 12/19/86 691 12/20/06 696 12/21/86 698 12/22/86 701 12/23/86 701 12/24/86 702 12/25/86 702 12/26/06 699 12/27/86 702 12/28/86 702 12/29/86 693 12/30/86 700 12/31/86 702

_ _ _ _ - - - - - - - - - - - - - - - ~ ~ - - - - - - - ' ' - - - - -

l i

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: DECEMBER 1986
3. LICENSED THERMAL POWER (MWT):

2200

4. NAMEPLATE RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE):

693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

700

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666 B. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. P 5UE R LEUEL'iU"UUiCU~ R555 REbiE6, ~ 5F AUE~iUEi" UU55"_"_~_~_~_~_~_ ~ ~_~_~_~_~_ ~_~_~_~_ ~ ~ ~~_~_~_~_

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 8760 117101.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

744.0 3048.2 80683.3

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 166.6

14. HOURS GENERATOR ON-LINE _________________

704.2 2792.2 77887.2

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

32.1

16. GROSS THERMAL ENERGY GENERATED (MWH) 1541849 5725859 164763588
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 508010 1842276 52484848
18. NET ELECTRICAL ENERGY GENERATED (MWH) 484635 1721504 49682712
19. UNIT SERVICE FACTOR _____________________

94.7 31.9 66.5

20. UNIT AVAILABILITY FACTOR ________________

94.7 31.9 66.5

21.. CAPACITY FACTOR (USING MDC NET) 97.8 29.5 65.1
22. CAPACITY FACTOR (USING DER NET) 94.0 28.4 61.2
23. UNIT FORCED OUTAGE RATE _________________

5.3 11.5 6.7

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l

DOCKET NO.

50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME Turkey pnint trnit g4 DATE.1a nua ry 14 ; 1997 COtWLETED BY M u r:r2 n +

REPORT MONT}g nocomhor 1986 NE W 604-44V e.

E E

5-3 j Ei Licensee E*

  • {,

Cause & Correceive No Dale i

3g i

2s&

Event g?

^ ' ' " ' "

~ di g Report a mO EO Prevent Recurrence

$5 E

=

g d

I 13 861205 S

39.7 A

1 Hij PIPEXX The unit began a scheduled outage to repair a condensate line and a reheater gasket leak.

Following a brief hold for secondary chemistry, the unit returned to full power operation.

l l

l l

l l

l l

i 2

3 4

f Forced Reason:

Method:

Exhibit G. instructions

% Stheduled A-Lquipment Failure (Enplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event Repore (LER) File iNUREG-D-Regulatory Restriction

@Other (Explaml 0161) i 1 -Operator Trainmg & tacense I:ununation i

F Admmntrative 5

G Operaan.rul I s tor (tiplam) 6.

4 4.

44 eve Estubit I - Same Source C#/77)

Il Ot her llaplam)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkev Point Unit 84 DATE January 14. 1987 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT MONTH Decomher. 1986 See the " Unit Shutdown and Power Reductions" report.

i l

l AVER AGE DAILY UNIT Pot ^f R LEvsL DOCKET NO.

50- m j

UNIT St. Lucie Unit 1 DATE Januarv 14. 1987 COMPLETEDBY N.W. Grant TELEPHONE (305) 694-4432 i

MONTy December, 1986 l

l DAY AVERACE DAILY POWER LEVEL (MWe Ned 12/ 1/86 840 12/ 2/86 800 12/ 3/86 779 12/ 4/86 852 12/ 5/86 856 12/ 6/86 855 12/ 7/06 856 12/ 8/86 856 12/ 9/86 856 12/10/06 852 12/11/86 849 12/12/86 847 12/13/86 847 12/14/86 834 12/15/86 776 12/16/86 813 12/17/86 855 12/18/86 854 12/19/86 853 12/20/86 854 12/21/86 854 12/22/86 856 12/23/86 855 12/24/86 855 12/25/86 853 12/26/86 853 12/27/86 853 12/28/86 855 12/29/86 857 12/30/86 854 12/31/86 857

OPERATING DATA REPORT DOCKET NO 50 - 335 i

DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD: DECEMBER 1986
3. LICENSED THERMAL POWIx (MWT):

2700

4. NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. P5E5R L5V5L'i ~EU555~R555R5CI56I"5F AUY~iU5Y"5U5I~_~_[~_~_~_[~_^-[~((~_~_~_~~~~-((~_~_.

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 8760 87912.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

744.0 8416.7 64572.7

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14.. HOURS GENERATOR ON-LINE ________-________

744.0 8353.6 64155.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

1993847 22326924 163219191 i

17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

661700 7428640 53485145

18. NET ELECTRICAL ENERGY GENERATED (MWH) ___

628425 7052031 50485823

19. UNIT SERVICE FACTOR ____________________-

100.0 95.4 73.0

20. UNIT AVAILABILITY FACTOR ____--____-_____

100.0 95.4 73.0

21. CAPACITY FACTOR (USING MDC NET) 100.7 96.0 71.9 l
22. CAPACITY FACTOR (USING DER NET) 101.8 97.0 70.4 l
23. UNIT FORCED OUTAGE RATE _________________

0 1.1 4.0 l

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

I REFUELING 2/7/87, 63 DAYS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

b I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 M UNIT NAME st t..ci o Unit #1 DATE

.1a m na ry 14. 19R7 -

C00FLETED BY M u Grant REPORT MONTH _Dficfsber 1986 E (E d 604 4432 l

e.

E c

3?

3 j E5 Licensee 5%

$*3 L

Cause & Corrective Nie D. ale g

3g 255 Event g?

Action to gV

$E E

j di g Report a mV Prevent Recurrence g

6 Unit #1 had no shutdowns or significant power reductions.

I 2

3 4

f Forced Reason:

Method:

Exhibit G - Instructions 5 St heduled A Lquipment Failure (Explam) 1 -Manual for Preparation of Data B-Maintenance or Test 2 Manual Scrarn.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Resiriction

$4 her (Explain 1 0161) 1 -Operator Training & License Exammaison F-Ad minist rat ive p g,,

5 G Operational l'e ror iliplam t c

/ e o 44 ewe.,..,J Exhibit I Same Source t9/77)

Il-Oiher i t: xplam )

~

SUMMARY

OF OPERATING EXPERIENCE i

DOCKET NO.

En_118 UNIT st incie IInit #1 DATE

.1a nna ry 14. 1987 COMPLETED BY n

u_ neant TELEPHONE (1nsi 694-4432 REPORT MONTH December, 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".

In accordar.ce with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

AVER AGE DAILY UN!T POWtt LEVEL DOCKET NO. 50-389 UNIT St. Incia unit 2 DATg January 14, 1987 COMPLETED SY N.W. Grant TELEPHONg (305) 694-4432 MONDg December, 1986 DAY AVERAGE DAILY POWER LEVEL IMWe Net) 12/ 1/86 839 12/ 2/86 859 12/ 3/86 858 12/ 4/86 861 12/ 5/86 862 12/ 6/86 863 12/ 7/86 864 12/ 8/86 865 12/ 9/86 863 12/10/86 862 12/11/86 836 12/12/86 825 12/13/86 860 12/14/86 862 12/15/86 861 12/16/86 863 12/17/86 864 12/18/86 862 12/19/86 862 12/20/86 862 12/21/86 862 12/22/86 863 12/23/86 863 12/24/86 862 12/25/86 861 12/26/86 860 12/27/86 863 12/28/86 863 l

12/29/86 864 12/30/86 865 12/31/86 867 s

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 2

2. REPORTING PERIOD DECEMBER 1986 3.

LICENSED THERMAL POWER (MWT): ______________ 2700 4.

NAMEPLATE RATING (GROSS MWE): ______________

850 5.

DESIGN ELF.CTRICAL RATING (NET MWE):

030 6.

MAXIMUM DL*PENDABLE CAPACITY (GROSS MWE): ___

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 8760 29809.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

744.0 7326.7 25375.6

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

744.0 7255.5 24827.8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

2004055 19391368 64037901

17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

673270 6487470 21394150

18. NET ELECTRICAL ENERGY GENERATED (MWH) 639465 6146561 20217604
19. UNIT SERVICE FACTOR _____________________

100.0 82.8 83 3

20. UNIT AVAILABILITY FACTOR ________________

100.0 92.8 83 3

21. CAPE.-CTY FACTOR (USING MDC NET) 102.4 83.6 83.4
22. CAPACITY FACTOR (USING DER NET) _________

103.6 84.5 83.0

23. UNIT FORCED OUTAGE RATE _________________

0 1.0 8.1

24. SHUTDOWNS SCHEDULEC OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-389 UNIT NAME St I"Ma t'ait #2 DATE January 14, 1987 REPORT MONTH Decomhar-1986

.l W.I.EPHONE. ("In'iMQA AA'49

.33 3*1, Cause & Corrective e

e.

sX t*ensee E*

.2 E E

g

,gE Event uT 63 Action to N..

Date

{

g3 g

j h

E.

j4g Rep *we *

'50 fU Prevent Recurrence d

Unit #2 had no shutdowns or 1

significant power reductions.

I l

l l

I 2

3 4

F F wced Reasem:

Mettiod:

Eahlbit G -Instrections S Scheduled A Equipenent Failure (Emplain) l-Manual for Preparatism of Deta B-Maintenance or Test 2 Manuel Scrsen.

Entry Sheets for IAensee C Refueling 3 Autonistic Scram.

Event Repor ll_ERI FileINUREG-D-Regulatewy Restriction

$0her(Emplain1 01611 I

si r Training & IAense Examinatiim p

G Operatiimal brur IFsplain; 4.

4 4.

A sowe.,..,#

Eshibit I Same Source l'#/77 )

Il Other IEaplain)

i

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 P

L DATE January 14. 1987 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT MONTH December. 1986 Unit #2 operated at essentially full power and had no " unit shutdowns or significant power reductions".

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

b

P. O. BOX 14000, JUNO BEACH, FL 33408-0420

g.. iU.(g JANUARY 1 4 1987 L-87-22 U. S. Nuclear Regulatory Commission Document Control Desk Washingion, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operatina Report Attached are the December 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

Very truly yours, 90 g O. Woody roup Vice President Nuclear Energy j

l l

COW /NWG/gp Attachment cc:

Dr. J. Nelson Grace, Region ll, USNRC USNRC Senior Resident, Turkey Point Plant USNRC Senior Resident, St. Lucie Plant i

l l

\\ \\

NWGI/005/l PEOPLE.. SERVING PEOPLE